GCRI · Nexus의 작동 방식
결정
The decision belongs to the competent authority or institution, under its own rules. GCRI’s part ends at handing over evidence, options and their limits in a form the decision-holder can use and others can audit.
This step sits outside the programme.
The decision is taken by the competent authority under its own rules; the six pillars, led by the Nexus Consortium, supply evidence and options and do not decide.
작동 중인 인계기록된 인계직접 인계 없음
프로그램 연도모든 단계
경로
프로그램 전체
Every pillar hands its work to another; together they close the year’s feedback loops.
L · F · U · S · R · A
- 기둥
- 6 / 6
- 인계
- 18 / 18
- 순환 고리
- 17 종료됨
작동 중인 인계
- F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
- F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
- F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
- F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review
외 14개
- 랩질문이 실험과 시제품이 되는 곳입니다. 새로운 방법, 데이터, 도구를 Nexus Consortium 아래 Foundry가 구축하기 전에 한계를 기록한 채 공개적으로 시험합니다.GCRI: Labs의 Labs
- 지역 임무에서 가장 많이 사용하는 Foundry방법, 데이터, 모형이 재현 가능한 빌드가 되는 곳으로, 각 실행에는 입력, 버전, 한계가 기록됩니다.GCRI: Foundry의 Foundry
- UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Universe at GCRI: Universe technical officeuniverse.nexus
- Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Nexus Standards
- 보고서연구 결과가 방법, 불확실성, 증거 등급과 함께 발행되고 새 버전으로 정정되는 곳입니다.GCRI: Publish의 Reports보고서
- Risk AcademyWhere methods and systems are taught on real data and real places, by working the case, on Risk Academy.Risk Academy
의사결정권자가 받는 내용.
| 항목 | 왜 중요한가 |
|---|---|
| 기준과 함께 제시된 질문의 구성 | So the decision-holder can see whether it was the right question |
| Options with consequences and uncertainty | Decision analysis compares options, it does not choose among them |
| Evidence labels and limits | So a modelled result is not acted on as an observation |
| What would change the answer | Triggers for revisiting the decision as monitoring data arrive |
Under the Sendai Framework, disaster risk governance is a national responsibility shared with local government and other stakeholders. Evidence from the cycle feeds that governance; it does not substitute for it.
The workspace for the decide step.
실행 주간
Universe · the Global Centre for Risk and Innovation (GCRI) · Week 27 · Example interface, not a record
트랙
통제된 세션
옵서버 노트
- O-1셀 간 상향 조정 경로가 불분명함트랙 14 시간
- O-2데이터 인계가 설계대로 작동함트랙 21 시간
- O-3검증 전에 작성된 대중 메시지트랙 34 시간
GCRI · Action week. Action week: example names and illustrative values, not a record.
NXS-RLS records who decided what.
Where a competent body chooses to record a decision taken on cycle evidence, the record names the body, the mandate, the date and the evidence version it relied on. That record is what makes the renew step possible: when the evidence is corrected, the decisions that relied on it can be found. Authenticated is not authorised, and an analyst’s access to a build gives no decision right.
프로세스가 진행되는 방식.
Process explorer · Process
결정: 숙의에서 결정까지
9 steps·4 stages
절차
결정: 숙의에서 결정까지
대화 안건에는 책임 소관자, 근거, 재무적 해석이 부여됩니다. 숙의는 반대 의견과 함께 기록되며, 결정은 책임 있는 결정권자가 내립니다.
01 질문과 근거
- 01Frame the question with an accountable ownerRecord · The Global Risks ForumGRF frames dialogue questions, with GCRI consulted and the Global Risks Alliance (GRA) where finance is involved. The question note names an accountable owner.
- 02근거 브리프기록 · GCRIGCRI는 라벨, 출처 및 한계를 담은 근거 보고서를 작성합니다. GRF와 GRA에 통보됩니다.
- 03금융이 관련된 경우의 재무적 해석기록 · 글로벌 리스크 얼라이언스(Global Risks Alliance)기록에 재무적 함의가 있는 경우 GRA는 선택지 메모 형태로 재무적 해석을 제공합니다. 이는 거래나 승인이 아닙니다.
02 대화
- 04누가 어떤 권한으로 참여하는가구성 요소포럼 설계는 청중이 누구인지, 누가 참여해야 하는지, 누가 참여하지 않아야 하는지, 그리고 발언자가 어떤 권한을 지니는지(있다면)를 묻습니다.
- 05대화와 숙의훈련 · 글로벌 리스크 포럼(Global Risks Forum, GRF), 협의회협의회는 기록에 남기는 합의로 결정하며, 반대 의견도 함께 기록합니다. 근거 생산자, 숙의 참여자, 재원 제공자는 서로 구분됩니다.
- 06선택지와 권고기록 · 의사결정 책임자의사결정 룸은 의사결정 사례, 선택지, 기준, 평가 실행 및 권고를 기록으로 보관합니다.
03 기록
- 07Deliberation recorded before findings move onRecord · The councilCouncil deliberation on exercise findings is recorded before findings go to Reports. Approved minutes are published, with dissent.
04 결정
- 08책임 있는 의사결정자가 결정함의사결정 · 책임을 지는 결정권자협의회는 공표된 범위 안에서 권고만 하며, 공공 당국의 결정은 내리지 않습니다. 각 결정에는 책임을 지는 결정권자가 한 명씩 있습니다.
- 09후속 조치 경로 및 기록기록모든 포럼에는 후속 조치 경로가 있습니다. 기록에는 결론이 있었다면 무엇이었는지, 그리고 아직 해결되지 않은 사항이 무엇인지 명시됩니다.
Councils · The Global Risks Forum · The global levelDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No council is constituted.
Each pillar’s contribution.
그다음: 갱신.
Where this page’s references lead.
이 페이지를 읽을 때 기준이 되는 기구와 문서. 상태와 판은 바뀌며, 각 링크는 발행 기구로 연결됩니다.
방법, 데이터세트 또는 질문을 가져오십시오.
정보와 문의는 오늘부터 열려 있습니다. 문의에는 참조 번호가 부여되고 다음 단계가 안내됩니다. 신청, 결제, 컴퓨팅 할당, 등록은 해당 팀, 약관, 심사 역량이 갖추어졌을 때만 열립니다.
법률 문서.
이 사이트의 지도, 데이터와 그림은 맥락과 일반 정보로 제시됩니다. 조언, 예보 또는 경보가 아니며, 정보의 한계는 면책 고지와 데이터 고지에 나와 있습니다.