Skip to content

GCRI · Nexus 如何运作

决定

The decision belongs to the competent authority or institution, under its own rules. GCRI’s part ends at handing over evidence, options and their limits in a form the decision-holder can use and others can audit.

01六大支柱

此步骤在计划之外。

决定由主管部门依其自身规则作出;由 Nexus Consortium 牵头的六大支柱提供证据和选项,但不作决定。

选择支柱 · 悬停连线18 / 18 次移交

路径

整个计划

Every pillar hands its work to another; together they close the year’s feedback loops.

L · F · U · S · R · A

支柱
6 共 6
交接
18 共 18
回路
17 已关闭

进行中的交接

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

另有 14 个

F01 至 F14 是计划年度中有记录的交接,每项都附有传递的成果物及其阶段;R1、R2、R3 和 R4 沿环传递工作。当一个回路上的每个支柱都被选中时,该回路才计入。每个支柱都由 Nexus Consortium 牵头。
  1. 实验室问题在此变为实验和原型:新的方法、数据和工具在 Foundry 构建之前公开试用,并记录其局限,由 Nexus Consortium 主持。GCRI 的 Labs:Labs
  2. 区域任务最常用的 Foundry方法、数据和模型在此成为可复现的构建,每次运行都记录其输入、版本和局限。GCRI 的 Foundry:Foundry
  3. UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Universe at GCRI: Universe technical officeuniverse.nexus
  4. Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Nexus Standards
  5. 报告研究发现在此连同其方法、不确定性和证据等级一并发布,并以新版本形式更正。GCRI 的 Reports:发布报告
  6. Risk AcademyWhere methods and systems are taught on real data and real places, by working the case, on Risk Academy.Risk Academy
02The handover

决策者所获得的内容。

条目为何重要
所提出的问题及其评判标准以便决策者判断所问的是否是正确的问题
附带后果与不确定性的备选方案Decision analysis compares options, it does not choose among them
证据标签与局限So a modelled result is not acted on as an observation
哪些因素会改变答案随着监测数据陆续到来而重新审视该决定的触发条件

根据 《仙台框架》,灾害 风险治理 是国家责任,由地方政府和其他利益相关方共同分担。该周期产生的证据为这种治理提供依据,但不能取代治理。

03工作空间

用于决策步骤的工作空间。

行动周

Universe · the Global Centre for Risk and Innovation (GCRI) · Week 27 · Example interface, not a record

Week plannedGCRI · GCRI

议程轨道

受控会议

MonTueWedThuFri0910111213141516Programme formation clinicAnnual mission planningEvidence label auditNational Model reviewStand-down and hot washObserver briefing

观察员笔记

  1. O-1各小组之间的升级路径不明确议程轨道 14 小时
  2. O-2数据交接按设计运行议程轨道 21 小时
  3. O-3在核实前起草公开信息议程轨道 34 小时
行动周。示意界面;并非实时数据。

GCRI · Action week. Action week: example names and illustrative values, not a record.

04已记录的决定

NXS-RLS records who decided what.

Where a competent body chooses to record a decision taken on cycle evidence, the record names the body, the mandate, the date and the evidence version it relied on. That record is what makes the renew step possible: when the evidence is corrected, the decisions that relied on it can be found. Authenticated is not authorised, and an analyst’s access to a build gives no decision right.

05流程

流程如何运行。

Process explorer · Process

决策:从审议到决定

9 steps4 stages

流程

决策:从审议到决定

对话问题会指定负责的责任人,并附有证据和财务解读;审议过程连同异议一并记录,由问责决策者作出决定。

  1. 01 问题与证据

    1. 01由明确的负责人牵头确定问题框架记录 · Global Risks Forum全球风险论坛(Global Risks Forum,GRF)负责拟定对话问题,并征询全球风险与创新中心(Global Centre for Risk and Innovation,GCRI)的意见;涉及金融时,还会征询全球风险联盟(Global Risks Alliance,GRA)。问题说明会指明一名负责人。
    2. 02证据简报记录 · GCRI全球风险与创新中心(Global Centre for Risk and Innovation,GCRI)编制附有标签、来源和局限说明的证据简报,并通报 GRF 和 GRA。
    3. 03财务解读(涉及金融时)记录 · 全球风险联盟(Global Risks Alliance)如记录涉及财务影响,GRA 以方案说明的形式提供财务解读。它绝不构成交易或批准。
  2. 02 对话

    1. 04谁参与,拥有何种权限组件论坛设计需明确:受众是谁,谁应当 参与,谁不应参与,以及发言人具有何种权威(如有)。
    2. 05对话与协商演练 · 全球风险论坛(Global Risks Forum,GRF);理事会理事会在记录在案的情况下以共识方式决策,并记录异议。证据提供方、审议方和出资方保持可区分。
    3. 06方案与建议记录 · 决策负责人Decisions 空间以记录形式保存决策案例、备选方案、标准、评估运行和建议。
  3. 03 记录

    1. 07Deliberation recorded before findings move onRecord · The councilCouncil deliberation on exercise findings is recorded before findings go to Reports. Approved minutes are published, with dissent.
  4. 04 决定

    1. 08由问责决策人作出决定决策 · 负有问责责任的决策者理事会在已公布的范围内提出建议,不作出公共权力机关的决定。每项决定都有一名负责的决策人。
    2. 09后续跟进路径和记录记录每个论坛都有后续跟进渠道。记录会说明已得出的结论(如有)以及尚未解决的事项。

Councils · The Global Risks Forum · The global levelDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No council is constituted.

07下一步

然后:更新。

08来源

Where this page’s references lead.

阅读本页时所对照的机构和文件。状态和版本会变化;每个链接都指向发布机构。

全球风险与创新中心(The Global Centre for Risk and Innovation)

带来一种方法、一个数据集或一个问题。

信息和咨询现已开放。每项咨询都会获得一个编号,并告知下一步;申请、付款、算力分配和注册只有在相应团队、条款和审查能力就绪时才会开放。