Skip to content

GCRI · Como o Nexus funciona

Decidir

The decision belongs to the competent authority or institution, under its own rules. GCRI’s part ends at handing over evidence, options and their limits in a form the decision-holder can use and others can audit.

01Seis pilares

This step sits outside the programme.

The decision is taken by the competent authority under its own rules; the six pillars, led by the Nexus Consortium, supply evidence and options and do not decide.

Selecione pilares · passe o cursor sobre as linhas18 / 18 transferências

Rota

O programa na íntegra

Every pillar hands its work to another; together they close the year’s feedback loops.

L · F · U · S · R · A

Pilares
6 de 6
Transferências
18 de 18
Laços
17 fechado

Transferências em jogo

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

e mais 14

F01 a F14 são as transferências registradas do ano do programa, cada uma com o artefato que se move e a sua fase; R1, R2, R3 e R4 levam o trabalho ao redor do anel. Um ciclo conta quando todos os pilares nele estão selecionados. Cada pilar é liderado pelo Nexus Consortium.
  1. LaboratóriosOnde as perguntas se tornam experimentos e protótipos: novos métodos, dados e ferramentas são testados abertamente, com seus limites registrados, antes que o Foundry os construa, sob o Nexus Consortium.Labs no GCRI: Labs
  2. FoundryWhere methods, data and models become reproducible builds, each run with its inputs, version and limits on record.Foundry at GCRI: Foundry
  3. UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Universe at GCRI: Universe technical officeuniverse.nexus
  4. Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Nexus Standards
  5. RelatóriosOnde os resultados são publicados com seu método, incerteza e classe de evidência, e corrigidos como novas versões.Reports no GCRI: PublicarRelatórios
  6. Risk AcademyWhere methods and systems are taught on real data and real places, by working the case, on Risk Academy.Risk Academy
02The handover

O que um tomador de decisão recebe.

ItemPor que isso importa
A questão tal como formulada, com seus critériosSo the decision-holder can see whether it was the right question
Opções com consequências e incertezaDecision analysis compares options, it does not choose among them
Rótulos de evidências e limitesSo a modelled result is not acted on as an observation
What would change the answerTriggers for revisiting the decision as monitoring data arrive

Under the Sendai Framework, disaster risk governance is a national responsibility shared with local government and other stakeholders. Evidence from the cycle feeds that governance; it does not substitute for it.

03Espaço de trabalho

The workspace for the decide step.

Semana de ação

Universe · the Global Centre for Risk and Innovation (GCRI) · Week 27 · Example interface, not a record

Week plannedGCRI · GCRI

Trilhas

sessões controladas

MonTueWedThuFri0910111213141516Programme formation clinicAnnual mission planningEvidence label auditNational Model reviewStand-down and hot washObserver briefing

Notas dos observadores

  1. O-1Escalation path unclear between cellsTrack 14 h
  2. O-2Data hand-off worked as designedTrack 21 h
  3. O-3Public message drafted before verificationTrack 34 h
Semana de ação.Interface ilustrativa; não são dados ao vivo.

GCRI · Action week. Action week: example names and illustrative values, not a record.

04Decisões registadas

NXS-RLS records who decided what.

Where a competent body chooses to record a decision taken on cycle evidence, the record names the body, the mandate, the date and the evidence version it relied on. That record is what makes the renew step possible: when the evidence is corrected, the decisions that relied on it can be found. Authenticated is not authorised, and an analyst’s access to a build gives no decision right.

05Processo

Como decorre o processo.

Process explorer · Process

Decidir: da deliberação à decisão

9 steps4 stages

Processo

Decidir: da deliberação à decisão

Uma questão de diálogo recebe um responsável designado, evidências e leituras financeiras; a deliberação é registrada com as divergências, e quem responde pela decisão decide.

  1. 01 Pergunta e evidências

    1. 01Formule a questão com um responsável designadoRegistro · The Global Risks ForumO GRF formula as questões de diálogo, com consulta ao GCRI e à Global Risks Alliance (GRA) quando há finanças envolvidas. A nota da questão indica um responsável.
    2. 02Nota de evidênciasRegistro · GCRIO GCRI prepara uma nota de evidências com rótulos, fontes e limites. O GRF e a GRA são informados.
    3. 03Leitura financeira, quando há finanças envolvidasRegistro · The Global Risks AllianceQuando um registro tem implicações financeiras, a GRA fornece uma leitura financeira na forma de nota de opções. Nunca é uma transação nem uma aprovação.
  2. 02 Diálogo

    1. 04Quem participa e com que autoridadeComponenteO desenho do fórum pergunta quem é o público, quem deve participar, quem não deve e que autoridade, se houver, os palestrantes detêm.
    2. 05Diálogo e deliberaçãoExercício · O Global Risks Forum; conselhosOs conselhos decidem por consenso em ata, com as divergências registradas. Produtores de evidências, deliberadores e financiadores permanecem distinguíveis.
    3. 06Opções e recomendaçãoRegistro · O responsável pela decisãoA sala Decisions mantém como registros o caso de decisão, as opções, os critérios, a execução da avaliação e a recomendação.
  3. 03 Registro

    1. 07Deliberation recorded before findings move onRecord · The councilCouncil deliberation on exercise findings is recorded before findings go to Reports. Approved minutes are published, with dissent.
  4. 04 Decisão

    1. 08O decisor responsável decideDecisão · O decisor responsávelOs conselhos fazem recomendações dentro de um escopo publicado e não tomam decisões de autoridade pública. Cada decisão tem um único decisor responsável.
    2. 09Via de acompanhamento e registroRegistroTodo fórum tem um caminho de acompanhamento. Os registros indicam o que foi concluído, se algo foi, e o que permanece sem solução.

Councils · The Global Risks Forum · The global levelDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No council is constituted.

08Fontes

Where this page’s references lead.

Os organismos e documentos à luz dos quais esta página é lida. O estado e as edições mudam; cada ligação leva ao organismo emissor.

O Global Centre for Risk and Innovation

Traga um método, um conjunto de dados ou uma pergunta.

A informação e os pedidos estão abertos hoje. Um pedido recebe uma referência e indica o próximo passo; candidaturas, pagamentos, alocações de computação e registros só abrem quando existem a equipa, os termos e a capacidade de revisão.