قياس الاستخدام والحصص وشفافية التكلفة

Shared technical environments run into trouble when nobody can see what was used, by whom and on whose account, or when budget pressure starts to shape which results are kept. This page sets out how metering error and cost pressure develop and spread into scientific and institutional decisions, how use is designed to be metered in declared service units against quotas and credits, and the rule that no charge applies unless it was disclosed in writing first.

02السؤال

Usage metering, quotas and cost transparency: how the risk develops.

Service units, credits, quotas and tenant charges. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

الآلية

Misattribution

Shared services, untagged resources and long-running jobs make it hard to tell which project used what. Costs land on the wrong account, and the project that caused them receives no signal to change.

الآلية

Cost shapes science

When budgets are tight, ensembles shrink, validation runs are skipped and failed results go unreproduced. Metering kept independent of scientific state, and review decisions kept independent of cost, protect results from that pressure.

الآلية

Quota cliffs

A hard limit reached mid-run can kill work in progress or force a rushed restart. Pausing new workloads instead of stopping running ones, with warnings before the limit, keeps quotas from destroying evidence.

الآلية

Contributed and paid capacity blur

Capacity offered by one institution and capacity paid for by another can be mixed on a statement. Once blurred, nobody can show who funded a result, which matters for audit, ownership and conflicts of interest.

03الأساليب والأدلة

How usage metering, quotas and cost transparency is modelled, measured and tested.

النموذج وافتراضاته وبياناته وعدم اليقين فيه، بالصورة التي يفحصها بها عالم أو مهندس. وتتبع البنى أساليب منشورة. والقيم المرسومة توضيحية، وليست نتائج.

النموذج والمعادلات والافتراضات

The model structure used for usage metering, quotas and cost transparency, the assumptions it makes and how each is tested.

مخاطر العنصر iRi = f(Hi, Ei, Vi, Ci)الخطر والتعرّض وقابلية التأثر والقدرة على المواجهة
الخسارة السنوية المتوقعةEAL = ∑k pk · Lkعلى الأحداث k ذات الاحتمال السنوي p⁨k⁩
النظم المقترنةxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error
افتراضلماذا أُعدّكيف يُختبر
الخطر والتعرّض مستقلان داخل الحدث الواحديُبقي تكامل الخسارة قابلًا للحسابقارن بمطابقة دالة ربط (⁨copula⁩) على السجلات المشتركة
تكون الروابط خطية قرب نقطة التشغيليسمح بانتشار الصدمات عبر ⁨A⁩ادفع خارج النطاق الخطي وقارن
منحنيات الهشاشة قابلة للنقل بين الأماكننادرًا ما تتوافر المنحنيات المحليةالتحقق مقابل الخسائر المرصودة حيثما وُجدت
المدخلات
مجموعات بيانات ذات إصدارات ومزودة ببيان المصدر
المخرجات
توزيعات، لا أرقام منفردة أبدا
الرمز
يُصدر مع بطاقة النموذج والاختبارات
إعادة الإنتاج
البيانات نفسها والشيفرة نفسها والبيئة نفسها والبذرة نفسها
صيغ معيارية للمخاطر وفضاء الحالة؛ والافتراضات المدرجة نموذجية للأسلوب ومعلنة للمراجعة، وليست نتائج.
مبادئ FAIR التوجيهية · GO FAIR وFORCE11⁨W3C PROV⁩ · اتحاد الشبكة العالميةإرشادات بشأن المعالجة المتسقة لأوجه عدم اليقين · الهيئة الحكومية الدولية المعنية بتغير المناخبيانات CEOS الجاهزة للتحليل · لجنة سواتل رصد الأرض
04في المجالات الخمسة

Usage records are designed to show what each domain’s work consumed.

Usage reporting is designed for the Foundry Build and Readiness series. No fee is stated on these pages; any charge requires an issuer, currency, effective date and schedule on record, and the Global Centre for Risk and Innovation (GCRI Canada) operates the service on a not-for-profit basis.

  • Questions about usage records.
  • Proposals for transparent reporting.
05المؤشرات الفرعية

ما الذي يُقاس، ومدى جودة قياسه.

يحمل كل مؤشر وحدته ووتيرته ونوع المصدر الذي يستند إليه ووسم الأدلة الذي ستحمله القيمة. ولا تُعرض أي قيم: فالبرنامج يقدّمها بموجب سلطته الخاصة.

المؤشرالوحدةوتيرة الإصدارنوع المصدرالوسم
Metered use attributed to a projectproportion of total useشهريMetering recordsمرصود
Use by service unitdeclared service unitsيوميMetering recordsمرصود
Quota consumptionproportion of allocationيوميQuota serviceمرصود
Workloads paused at quotaالعددلكل فترةScheduler recordsمرصود
Statement discrepancies raisedcount per statementper billing periodDispute recordsمُبلَّغ عنه
Charges with prior written disclosureproportion of chargesper billing periodAgreements and fee schedulesالإحصاءات المنشورة
Credits issued and consumedservice unitsشهريCredit ledgerالإحصاءات المنشورة
06المصادر

من أين تأتي الأدلة.

مجموعات بيانات عامة مسمّاة وسجلات مؤسسية، لكلٍّ منها فئة ترخيصها. ولا تُستخدم المصادر المتاحة بموجب اتفاق إلا وفق شروطها، ولا يُعاد نشرها أبدًا.

المصدرما يقدّمهفئة الترخيص
FinOps Open Cost and Usage Specification (FOCUS)A common schema for cloud cost and usage data across providersOpen specification
Public cloud price lists and billing exportsPublished unit prices and detailed usage records from providersProvider terms
Software Carbon Intensity specification (ISO/IEC 21031)A method for rating the carbon intensity of software per functional unitPublished standard, purchase from ISO
بيانات الكهرباء من EmberCarbon intensity of grid electricity by country for emissions attribution⁨CC BY 4.0⁩
Institutional agreements and fee schedulesUnits, quotas, credits and any fees agreed in writingBy agreement with each institution
Scheduler accounting recordsPer-job resource use by person, project and queueOperator records, shared with project owners
07القرارات

من يقرر، وما الذي تخدمه الأدلة.

تُعِدّ Foundry الأدلة. وتتخذ القرارات المبينة أدناه السلطات المسماة، وفق قواعدها الخاصة، ولا تتخذها المنصة أبدًا.

من يقررالسؤالالأدلة التي تخدمها هذه الصفحة
Finance officers of contracting institutionsWhether a statement matches the agreement and the metered useMetering by project against declared units and disclosed fees
مالكو المشاريعHow to spend an allocation across production runs, validation and storageQuota consumption, forecast use, workloads paused
Programme owners and fundersWhether a programme’s compute budget is adequate to validate its models properlyUse by activity; validation runs skipped or deferred
Audit and oversight bodiesWhether charges were disclosed and attributed correctlyDisclosure records, dispute outcomes, contributed capacity kept separate

المخرجات التي يُنتجها هذا الموضوع

  • Service unit definitions agreed before work starts
  • Statements of metered use against agreed units, by programme and project
  • Quota and credit ledgers kept apart from contributed capacity
  • Dispute records reviewed by someone outside the contested decision
08الأسئلة الجوهرية

What project owners and finance teams ask.

  • Which units are we charged in, and how are they measured?
  • Can we see use attributed to each project and workload?
  • How are quotas set, and what happens when one is reached?
  • Can cost considerations ever change a scientific result?
  • How is capacity contributed by one institution kept distinct from capacity another has paid for?
09الآليات

Metering, quotas and separation.

Use is designed to be recorded and attributed to the programme and project that incurred it. Compute, storage and system use are measured in service units defined in the institutional agreement before work starts, and quotas set per project limit consumption to what was agreed. Credits, where an agreement provides for them, are an accounting allocation against those units, not money and not a right to restricted data.

Usage is metered independently of scientific state. Budget pressure must not change whether a result is reproduced or accepted, so a reviewer’s decision on a result never depends on its cost, and reaching a quota pauses new workloads rather than deleting work in progress. Statements are designed to show metered use against the agreed units, so that a project owner can check them against the agreement without relying on the operator’s summary.

10Service boundary

What is and is not part of the service.

  1. 01

    الاتفاق

    Use is governed by an institutional agreement with the contracting party, GCRI Canada, or as that agreement provides.

  2. 02

    الإفصاح

    Any fee appears only with the issuer, currency, effective date and applicable schedule recorded in writing.

  3. 03

    القدرة المساهَم بها

    Infrastructure offered by others never appears on a statement as if it were consumed or paid for.

  4. 04

    المسارات

    NXS-RLS (participants, agreements and handoffs) records instructions and receipts between institutions; it never moves funds itself.

  5. 05

    Disputes

    A question about a charge is reviewed by someone not responsible for the contested decision.

Ordinary participation in working groups and learning carries no fee, and correction and integrity routes are never paywalled.

11الأساليب

كيف يُدرس، وما لا تستطيع المناهج قوله.

  1. هندسة النظمالجرد المرجعي للنظم · الواجهات القائمة على العقود أولًا · المتطلبات المتتبَّعة حتى الأدلةمُطبَّق هنا
  2. الحوسبة عالية الأداء والسحابية والطرفيةجدولة مجموعات المحاكاة عبر المستويات · التنفيذ الموحد بجوار البياناتمُطبَّق هنا
  3. هندسة البيانات وقابلية التشغيل البيني والإشراف على البياناتالتحقق عند حدود الاستيعاب · مقاطع بيانات مجمّدة للمنتجات القابلة لإعادة الإنتاجمُطبَّق هنا
  4. هندسة البرمجيات والنظم الحرجة من حيث السلامةبوابات سياسات تُغلق عند الإخفاق · بيان المصدر لعمليات البناء وقوائم المواد · حالات الضمانمُطبَّق هنا
12Where this page’s references

Where this page’s references lead.

الهيئات والوثائق التي تُقرأ هذه الصفحة في ضوئها. وتتغير الحالات والإصدارات؛ ويقود كل رابط إلى الهيئة المُصدِرة.

13أسئلة

أسئلة وأجوبة.

How much does Foundry cost?
No prices are published. Units, quotas and any fees are set in a written institutional agreement with the contracting party before any use is charged.
What is a service unit?
A declared unit of compute, storage or system use, defined in the agreement, so that use can be metered consistently across cloud, private and edge tiers and checked by the project owner.
Can cost ever change a scientific result?
It must not. Metering is kept independent of scientific state, and a reviewer’s decision on a result never depends on its cost. Reaching a quota pauses new work rather than deleting work in progress.
Are credits money?
No. Credits, where an agreement provides for them, are an accounting allocation against service units. They are not money, not transferable value and not a right to restricted data.
Can I see my project’s usage?
The design reports metered use to the project owner against the agreed units, attributed to programme and project.
Who do I ask about terms?
راسل استمارة الشراكة. يتضمن الإقرار بالاستلام رقمًا مرجعيًا ويسمّي الخطوة التالية.
التقاريرساهم

ساهم بأدلة من هذه الصفحة.

Reports هي المطبوعة الفصلية للاتحاد. ويمكن لما تعرفه عن هذا الموضوع أن يصبح دليلًا أو حالة أو تصويبًا في الإصدار التالي، يُنسب إليك ويُنشر بموجب CC BY 4.0 حيثما كان من عملك الخاص.

GCRI⁨Foundry⁩البناء والجاهزية في Foundry
⁨Foundry⁩

قدّم منهجية أو مجموعة بيانات أو سؤالا.

المعلومات والاستفسارات متاحة اليوم. ويحصل الاستفسار على رقم مرجعي ويحدد الخطوة التالية؛ ولا تُفتح الطلبات والمدفوعات وتخصيصات الحوسبة والتسجيلات إلا حين يتوافر فريقها وشروطها وقدرة المراجعة.

The Global Centre for Risk and Innovation (GCRI Canada) is a Canadian not-for-profit organisation, not a registered charity, with its registered office in Ontario.