Skip to content

GCRI · Foundry

پێوانی بەکارهێنان، کۆتا و ڕوونیی تێچوو

Shared technical environments run into trouble when nobody can see what was used, by whom and on whose account, or when budget pressure starts to shape which results are kept. This page sets out how metering error and cost pressure develop and spread into scientific and institutional decisions, how use is designed to be metered in declared service units against quotas and credits, and the rule that no charge applies unless it was disclosed in writing first.

01تۆمارکردن

Usage metering, quotas and cost transparency on the record.

02پرسیارەکە

Usage metering, quotas and cost transparency: how the risk develops.

Service units, credits, quotas and tenant charges. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

میکانیزم

Misattribution

Shared services, untagged resources and long-running jobs make it hard to tell which project used what. Costs land on the wrong account, and the project that caused them receives no signal to change.

میکانیزم

Cost shapes science

When budgets are tight, ensembles shrink, validation runs are skipped and failed results go unreproduced. Metering kept independent of scientific state, and review decisions kept independent of cost, protect results from that pressure.

میکانیزم

Quota cliffs

A hard limit reached mid-run can kill work in progress or force a rushed restart. Pausing new workloads instead of stopping running ones, with warnings before the limit, keeps quotas from destroying evidence.

میکانیزم

Contributed and paid capacity blur

Capacity offered by one institution and capacity paid for by another can be mixed on a statement. Once blurred, nobody can show who funded a result, which matters for audit, ownership and conflicts of interest.

03ڕێگا و بەڵگە

How usage metering, quotas and cost transparency is modelled, measured and tested.

مۆدێلەکە، گریمانەکانی، داتاکانی و نادڵنیاییەکەی، بەو شێوەیەی زانا یان ئەندازیارێک دەیپشکنێت. پێکهاتەکان ڕێگا بڵاوکراوەکان دەگرنەبەر. بەهاکانی کێشراو نموونەییە، نەک دۆزینەوە.

مۆدێل، هاوکێشەکان و گریمانەکان

The model structure used for usage metering, quotas and cost transparency, the assumptions it makes and how each is tested.

مەترسیی توخمی iRi = f(Hi, Ei, Vi, Ci)مەترسیدەر، ڕووبەڕووبوون، لاوازی و توانای مامەڵەکردن
زیانی ساڵانەی چاوەڕوانکراوEAL = ∑k pk · Lkover events k with annual probability pk
سیستەمە هاوبەستەکانxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error
گریمانەبۆچی دروست دەکرێتچۆن تاقی دەکرێتەوە
مەترسیدەر و ڕووبەڕووبوون لە ناو پێشهاتێکدا سەربەخۆنئینتێگراڵی زیان بە ئاسانی دەهێڵێتەوەبەراورد بکە لەگەڵ گونجاندنی کۆپیولا لەسەر تۆمارە هاوبەشەکان
هاوبەستییەکان لە نزیک خاڵی کارکردن هێڵینڕێگە دەدات شۆکەکان بڵاو ببنەوە لە Aلە دەرەوەی مەودای هێڵیی شڵەژێنە و بەراورد بکە
چەمکەکانی لاوازی لە شوێنێکەوە بۆ شوێنێکی تر دەگوازرێنەوەچەمکی ناوخۆیی بە دەگمەن بەردەستەلەگەڵ زیانە چاودێریکراوەکان پشتڕاستی بکەرەوە کە هەن
تێکردنەکان
کۆمەڵە داتای وەشانکراو لەگەڵ ڕەسەنایەتی
دەرچووەکان
دابەشبوون، نەک یەک ژمارە
کۆد
بڵاوکراوەتەوە لەگەڵ کارتی مۆدێل و تاقیکردنەوەکان
بەرهەمهێنانەوە
هەمان داتا، کۆد، ژینگە و تۆو
فۆرمۆلەکردنی مەترسی و دۆخ-بۆشایی ستاندارد؛ ئەو گریمانانەی لیست کراون ئاسایین بۆ ڕێگاکە، بۆ پێداچوونەوە ڕاگەیەندراون، نەک ئەنجام.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
04In the five domains

Usage records are designed to show what each domain’s work consumed.

Usage reporting is designed for the Foundry Build and Readiness series. No fee is stated on these pages; any charge requires an issuer, currency, effective date and schedule on record, and the Global Centre for Risk and Innovation (GCRI Canada) operates the service on a not-for-profit basis.

  • Questions about usage records.
  • Proposals for transparent reporting.
05نیشاندەرەکان

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

نیشاندەریەکەڕیتمSource typeناونیشان
Metered use attributed to a projectproportion of total useمانگانەMetering recordsچاودێریکراو
Use by service unitdeclared service unitsdailyMetering recordsچاودێریکراو
Quota consumptionproportion of allocationdailyQuota serviceچاودێریکراو
Workloads paused at quotacountper periodScheduler recordsچاودێریکراو
Statement discrepancies raisedcount per statementper billing periodDispute recordsڕاپۆرتکراو
Charges with prior written disclosureproportion of chargesper billing periodAgreements and fee schedulesئامارە بڵاوکراوەکان
Credits issued and consumedservice unitsمانگانەCredit ledgerئامارە بڵاوکراوەکان
06سەرچاوەکان

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

سەرچاوەWhat it givesLicence class
FinOps Open Cost and Usage Specification (FOCUS)A common schema for cloud cost and usage data across providersOpen specification
Public cloud price lists and billing exportsPublished unit prices and detailed usage records from providersProvider terms
Software Carbon Intensity specification (ISO/IEC 21031)A method for rating the carbon intensity of software per functional unitPublished standard, purchase from ISO
Ember electricity dataCarbon intensity of grid electricity by country for emissions attributionCC BY 4.0
Institutional agreements and fee schedulesUnits, quotas, credits and any fees agreed in writingBy agreement with each institution
Scheduler accounting recordsPer-job resource use by person, project and queueOperator records, shared with project owners
07بڕیارەکان

Who decides, and what the evidence serves.

Foundry prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

کێ بڕیار دەداتپرسیارەکەEvidence this page serves
Finance officers of contracting institutionsWhether a statement matches the agreement and the metered useMetering by project against declared units and disclosed fees
Project ownersHow to spend an allocation across production runs, validation and storageQuota consumption, forecast use, workloads paused
Programme owners and fundersWhether a programme’s compute budget is adequate to validate its models properlyUse by activity; validation runs skipped or deferred
Audit and oversight bodiesWhether charges were disclosed and attributed correctlyDisclosure records, dispute outcomes, contributed capacity kept separate

Outputs this topic produces

  • Service unit definitions agreed before work starts
  • Statements of metered use against agreed units, by programme and project
  • Quota and credit ledgers kept apart from contributed capacity
  • Dispute records reviewed by someone outside the contested decision
08Core questions

What project owners and finance teams ask.

  • Which units are we charged in, and how are they measured?
  • Can we see use attributed to each project and workload?
  • How are quotas set, and what happens when one is reached?
  • Can cost considerations ever change a scientific result?
  • How is capacity contributed by one institution kept distinct from capacity another has paid for?
09Mechanisms

Metering, quotas and separation.

Use is designed to be recorded and attributed to the programme and project that incurred it. Compute, storage and system use are measured in service units defined in the institutional agreement before work starts, and quotas set per project limit consumption to what was agreed. Credits, where an agreement provides for them, are an accounting allocation against those units, not money and not a right to restricted data.

Usage is metered independently of scientific state. Budget pressure must not change whether a result is reproduced or accepted, so a reviewer’s decision on a result never depends on its cost, and reaching a quota pauses new workloads rather than deleting work in progress. Statements are designed to show metered use against the agreed units, so that a project owner can check them against the agreement without relying on the operator’s summary.

10Service boundary

What is and is not part of the service.

  1. 01

    ڕێکەوتن

    Use is governed by an institutional agreement with the contracting party, GCRI Canada, or as that agreement provides.

  2. 02

    Disclosure

    Any fee appears only with the issuer, currency, effective date and applicable schedule recorded in writing.

  3. 03

    توانای بەشداربووی

    Infrastructure offered by others never appears on a statement as if it were consumed or paid for.

  4. 04

    هێڵی ئاسنین

    NXS-RLS (participants, agreements and handoffs) records instructions and receipts between institutions; it never moves funds itself.

  5. 05

    Disputes

    A question about a charge is reviewed by someone not responsible for the contested decision.

Ordinary participation in working groups and learning carries no fee, and correction and integrity routes are never paywalled.

11میتۆدەکان

How it is studied, and what the methods cannot say.

12Where this page’s references

Where this page’s references lead.

ئەو لەش و بەڵگەنامانەی ئەم لاپەڕەیەیان لەگەڵ دەخوێنرێتەوە. دۆخ و وەشانەکان دەگۆڕێن؛ هەر بەستەرێک دەچێتە لای لەشی دەرکەر.

13پرسیارەکان

پرسیار و وەڵام.

How much does Foundry cost?
No prices are published. Units, quotas and any fees are set in a written institutional agreement with the contracting party before any use is charged.
What is a service unit?
A declared unit of compute, storage or system use, defined in the agreement, so that use can be metered consistently across cloud, private and edge tiers and checked by the project owner.
Can cost ever change a scientific result?
It must not. Metering is kept independent of scientific state, and a reviewer’s decision on a result never depends on its cost. Reaching a quota pauses new work rather than deleting work in progress.
Are credits money?
No. Credits, where an agreement provides for them, are an accounting allocation against service units. They are not money, not transferable value and not a right to restricted data.
Can I see my project’s usage?
The design reports metered use to the project owner against the agreed units, attributed to programme and project.
Who do I ask about terms?
Write to the partnership form. The acknowledgement gives a reference and names the next step.
ڕاپۆرتەکانبەشداربە

لەم لاپەڕەیەوە بەڵگە پێشکەش بکە.

Reports بڵاوکراوەی وەرزیی کۆنسۆرتیۆم ـە. ئەوەی تۆ لەسەر ئەم بابەتە دەیزانیت دەتوانێت لە وەشانی داهاتوودا ببێتە بەڵگە، کەیس یان ڕاستکردنەوە، بە ناوی خۆتەوە و لەژێر CC BY 4.0 بڵاو دەکرێتەوە کاتێک کاری خۆتە.

GCRIFoundryFoundry Build and Readiness
Foundry

ڕێگایەک، کۆمەڵە داتایەک یان پرسیارێک بهێنە.

زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.

The Global Centre for Risk and Innovation (GCRI Canada) is a Canadian not-for-profit organisation, not a registered charity, with its registered office in Ontario.