Shared technical environments run into trouble when nobody can see what was used, by whom and on whose account, or when budget pressure starts to shape which results are kept. This page sets out how metering error and cost pressure develop and spread into scientific and institutional decisions, how use is designed to be metered in declared service units against quotas and credits, and the rule that no charge applies unless it was disclosed in writing first.

01Register

Usage metering, quotas and cost transparency on the record.

02The question

Usage metering, quotas and cost transparency: how the risk develops.

Service units, credits, quotas and tenant charges. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Misattribution

Shared services, untagged resources and long-running jobs make it hard to tell which project used what. Costs land on the wrong account, and the project that caused them receives no signal to change.

Mechanism

Cost shapes science

When budgets are tight, ensembles shrink, validation runs are skipped and failed results go unreproduced. Metering kept independent of scientific state, and review decisions kept independent of cost, protect results from that pressure.

Mechanism

Quota cliffs

A hard limit reached mid-run can kill work in progress or force a rushed restart. Pausing new workloads instead of stopping running ones, with warnings before the limit, keeps quotas from destroying evidence.

Mechanism

Contributed and paid capacity blur

Capacity offered by one institution and capacity paid for by another can be mixed on a statement. Once blurred, nobody can show who funded a result, which matters for audit, ownership and conflicts of interest.

03Methods and evidence

How usage metering, quotas and cost transparency is modelled, measured and tested.

The model, its assumptions, its data and its uncertainty, in the form a scientist or engineer would check. Structures follow published methods. The values drawn are illustrative, not findings.

Model, equations and assumptions

The model structure used for usage metering, quotas and cost transparency, the assumptions it makes and how each is tested.

Risk of element iRi = f(Hi, Ei, Vi, Ci)hazard, exposure, vulnerability and coping capacity
Expected annual lossEAL = ∑k pk · Lkover events k with annual probability pk
Coupled systemsxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error
AssumptionWhy it is madeHow it is tested
Hazard and exposure are independent within an eventKeeps the loss integral tractableCompare with a copula fit on joint records
Couplings are linear near the operating pointLets shocks propagate through APerturb beyond the linear range and compare
Vulnerability curves transfer between placesLocal curves are rarely availableValidate against observed losses where they exist
Inputs
versioned datasets with provenance
Outputs
distributions, never single numbers
Code
released with the model card and tests
Reproduction
same data, code, environment and seed
Standard risk and state-space formulations; the assumptions listed are typical of the method, stated for review, not results.
FAIR guiding principles · GO FAIR and FORCE11W3C PROV · World Wide Web ConsortiumGuidance on consistent treatment of uncertainties · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
04In the five domains

Usage records are designed to show what each domain’s work consumed.

Usage reporting is designed for the Foundry Build and Readiness series. No fee is stated on these pages; any charge requires an issuer, currency, effective date and schedule on record, and the Global Centre for Risk and Innovation (GCRI Canada) operates the service on a not-for-profit basis.

  • Questions about usage records.
  • Proposals for transparent reporting.
05Indicators

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
Metered use attributed to a projectproportion of total usemonthlyMetering recordsOBSERVED
Use by service unitdeclared service unitsdailyMetering recordsOBSERVED
Quota consumptionproportion of allocationdailyQuota serviceOBSERVED
Workloads paused at quotacountper periodScheduler recordsOBSERVED
Statement discrepancies raisedcount per statementper billing periodDispute recordsREPORTED
Charges with prior written disclosureproportion of chargesper billing periodAgreements and fee schedulesPublished statistics
Credits issued and consumedservice unitsmonthlyCredit ledgerPublished statistics
06Sources

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

SourceWhat it givesLicence class
FinOps Open Cost and Usage Specification (FOCUS)A common schema for cloud cost and usage data across providersOpen specification
Public cloud price lists and billing exportsPublished unit prices and detailed usage records from providersProvider terms
Software Carbon Intensity specification (ISO/IEC 21031)A method for rating the carbon intensity of software per functional unitPublished standard, purchase from ISO
Ember electricity dataCarbon intensity of grid electricity by country for emissions attributionCC BY 4.0
Institutional agreements and fee schedulesUnits, quotas, credits and any fees agreed in writingBy agreement with each institution
Scheduler accounting recordsPer-job resource use by person, project and queueOperator records, shared with project owners
07Decisions

Who decides, and what the evidence serves.

Foundry prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Who decidesThe questionEvidence this page serves
Finance officers of contracting institutionsWhether a statement matches the agreement and the metered useMetering by project against declared units and disclosed fees
Project ownersHow to spend an allocation across production runs, validation and storageQuota consumption, forecast use, workloads paused
Programme owners and fundersWhether a programme’s compute budget is adequate to validate its models properlyUse by activity; validation runs skipped or deferred
Audit and oversight bodiesWhether charges were disclosed and attributed correctlyDisclosure records, dispute outcomes, contributed capacity kept separate

Outputs this topic produces

  • Service unit definitions agreed before work starts
  • Statements of metered use against agreed units, by programme and project
  • Quota and credit ledgers kept apart from contributed capacity
  • Dispute records reviewed by someone outside the contested decision
08Core questions

What project owners and finance teams ask.

  • Which units are we charged in, and how are they measured?
  • Can we see use attributed to each project and workload?
  • How are quotas set, and what happens when one is reached?
  • Can cost considerations ever change a scientific result?
  • How is capacity contributed by one institution kept distinct from capacity another has paid for?
09Mechanisms

Metering, quotas and separation.

Use is designed to be recorded and attributed to the programme and project that incurred it. Compute, storage and system use are measured in service units defined in the institutional agreement before work starts, and quotas set per project limit consumption to what was agreed. Credits, where an agreement provides for them, are an accounting allocation against those units, not money and not a right to restricted data.

Usage is metered independently of scientific state. Budget pressure must not change whether a result is reproduced or accepted, so a reviewer’s decision on a result never depends on its cost, and reaching a quota pauses new workloads rather than deleting work in progress. Statements are designed to show metered use against the agreed units, so that a project owner can check them against the agreement without relying on the operator’s summary.

10Service boundary

What is and is not part of the service.

  1. 01

    Agreement

    Use is governed by an institutional agreement with the contracting party, GCRI Canada, or as that agreement provides.

  2. 02

    Disclosure

    Any fee appears only with the issuer, currency, effective date and applicable schedule recorded in writing.

  3. 03

    Contributed capacity

    Infrastructure offered by others never appears on a statement as if it were consumed or paid for.

  4. 04

    Rails

    NXS-RLS (participants, agreements and handoffs) records instructions and receipts between institutions; it never moves funds itself.

  5. 05

    Disputes

    A question about a charge is reviewed by someone not responsible for the contested decision.

Ordinary participation in working groups and learning carries no fee, and correction and integrity routes are never paywalled.

11Methods

How it is studied, and what the methods cannot say.

12Where this page’s references

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

13Questions

Questions and answers.

How much does Foundry cost?
No prices are published. Units, quotas and any fees are set in a written institutional agreement with the contracting party before any use is charged.
What is a service unit?
A declared unit of compute, storage or system use, defined in the agreement, so that use can be metered consistently across cloud, private and edge tiers and checked by the project owner.
Can cost ever change a scientific result?
It must not. Metering is kept independent of scientific state, and a reviewer’s decision on a result never depends on its cost. Reaching a quota pauses new work rather than deleting work in progress.
Are credits money?
No. Credits, where an agreement provides for them, are an accounting allocation against service units. They are not money, not transferable value and not a right to restricted data.
Can I see my project’s usage?
The design reports metered use to the project owner against the agreed units, attributed to programme and project.
Who do I ask about terms?
Write to the partnership form. The acknowledgement gives a reference and names the next step.
ReportsContribute

Contribute evidence from this page.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIFoundryFoundry Build and Readiness
Foundry

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.