Local grid constraint that overlaps a chip or mineral supply constraint
A conditional statement under stated assumptions, never a prediction.
Contents
- ·Edition home
- ·Executive summary
- 1Technology rests on a few physical inputs
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Local grid constraint that overlaps a chip or mineral supply constraint
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
5.1Assumptions
Scenario SCN-SR13-GRID-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- a regional grid constraint during peak demand, coinciding with a shortage of a refined mineral or a chip class
- Analogues
- clustered load in Ireland and the United States, 2024 to 2025; refining concentration, 20251223
- Interventions
- none modelled: the specification describes the unmitigated case
- Run state
- narrative specification; quantified run scheduled for 2027
5.2The cascade, step by step
- 1
AIC → ENE
large new loads queue for connection and tighten the local grid
2025
- 2
MIN → TRD
a refined input is short and chip lead times lengthen
2025
- 3
TRD → AIC
new server and grid equipment is delayed
2025
- 4
AIC → DAT
capacity for cloud and AI services grows slower than demand
2025
- 5
DAT → INF
services that share a provider are exposed together
2025
- 6
INF → FIN
investment is re-timed and costs reach budgets
2025
5.3The scenario as a table of steps
How the shock in scenario SCN-SR13-GRID-01 would travel through Strategic Technology Infrastructure and Sovereign Readiness’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 AI compute to energy | Large new loads queue for connection and tighten the local grid. Analogue or source: 2025. | Edition SR-13, scenario SCN-SR13-GRID-01, step 1 |
| 02 Minerals to trade | A refined input is short and chip lead times lengthen. Analogue or source: 2025. | Edition SR-13, scenario SCN-SR13-GRID-01, step 2 |
| 03 Trade to ai compute | New server and grid equipment is delayed. Analogue or source: 2025. | Edition SR-13, scenario SCN-SR13-GRID-01, step 3 |
| 04 AI compute to dat | Capacity for cloud and AI services grows slower than demand. Analogue or source: 2025. | Edition SR-13, scenario SCN-SR13-GRID-01, step 4 |
| 05 DAT to infrastructure | Services that share a provider are exposed together. Analogue or source: 2025. | Edition SR-13, scenario SCN-SR13-GRID-01, step 5 |
| 06 Infrastructure to finance | Investment is re-timed and costs reach budgets. Analogue or source: 2025. | Edition SR-13, scenario SCN-SR13-GRID-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Strategic Technology Infrastructure and Sovereign Readiness 2026, scenario SCN-SR13-GRID-01 (2026); Strategic Technology Infrastructure and Sovereign Readiness 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 12Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023, 5% in 2015). CSO, Cork. Observation year 2024. Accessed 2026-11-03.back
- 2IEA (ed.), Global Energy Review 2026 (revised version, May 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back