Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1Technology rests on a few physical inputs
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Local grid constraint that overlaps a chip or mineral supply constraint
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- A.1 Methods
- A.2 Model card, Technology Infrastructure Model v0
- A.3 The baseline evidence cut
- A.4 Evidence age and coverage
- A.5 Evidence cards, two anchor sources
- A.6 Publication acceptance record
- A.7 Status words
- A.8 How the edition is made, released and corrected
- A.9 Glossary and abbreviations
- A.10 Technical annex
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Methods
The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | IEA Base Case 2030 against 2024 use | 945 ÷ 415 | ≈ 2.3 times |
| (2) | Rise in global chip sales, 2024 to 2025 (SIA series) | 791.7 − 630.5 | = USD 161.2 billion |
| (3) | EU chip share gap to target in 2030 | 20 − 11.7 | = 8.3 percentage points |
| (4) | Combined share of data-centre use, US, China, Europe | 45 + 25 + 15 | ≈ 85% |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season, in more than one region |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at global scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, Technology Infrastructure Model v0
- Model ID
- MDL-SR13-STRATTECH · v0.1
- Purpose
- represent strategic technology infrastructure as a dependent stack and the mechanisms by which strain spreads between compute, chips, power, minerals and connectivity
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
- Validation
- none yet, first validation against federation evidence in 2027
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- global scale; not for asset-, site- or country-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.
- Cut ID
- DC-STRATEGIC-STRATTECH-GLOBAL-2026-B0
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 43 cited sources, each at the edition and access date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- the 2027 strategic technology infrastructure annual cut
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | 2027 global annual |
|---|---|---|
| Sources | cited global publications, pinned by edition | national, regional and sector cuts through one graph |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | Technology Infrastructure Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to federation evidence |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| Data centre load | 2024 | Apr 2025 | one-off | next IEA update |
| US electricity growth | 2025 | May 2026 | annual | next review |
| Refining concentration | 2025 | Jul 2026 | annual | next outlook |
| Chip sales | 2025 | Feb to Mar 2026 | quarterly | next forecast |
| EU chip target | 2022 to 2030 | Apr 2025 | one-off | mid-term review |
| US chip funding | 2022 | 2026 | rolling | next award notice |
| Enterprise cloud and AI use | 2025 | 2025 | annual | 2026 survey |
| Irish data centre load | 2024 | Jun 2025 | annual | next CSO release |
| Private AI investment | 2025 | 2026 | annual | next AI Index |
| Connectivity | 2026 | Nov 2026 | annual | next ITU release |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Compute load | GOOD | load by site and region |
| Power | PARTIAL | connection waiting times |
| Chips | PARTIAL | capacity by region |
| Minerals | PARTIAL | rare earth and heavy-mineral shares |
| Cloud | THIN | provider concentration |
| Connectivity | PARTIAL | quality and resilience of links |
| Policy and finance | PARTIAL | delivery against targets |
| Orbital infrastructure | THIN | satellite and timing dependence |
| Field | Source that would fill it | Blocker |
|---|---|---|
| Chip manufacturing capacity by region on a common basis | industry associations and national statistics | no consolidated series opened; sales are bound, capacity is not |
| Cloud market concentration by region | market analysts26 | the analyst page returned not found; no provider shares are used |
| Grid connection waiting times for large loads | system operators and regulators | not retrieved; no comparable series |
| AI compute by country beyond tracked sites | Epoch AI data centre tracker14 | the tracker estimates it covers about 45% of deployed AI compute, with a wide interval |
| Sovereign cloud and local hosting adoption | national statistics and market analysts | no common definition found |
| Rare earth mine and refining shares from the primary tables | USGS Mineral Commodity Summaries 202624 | the report returned an access error; the IEA outlook excludes rare earths from its 72% average |
| US data-centre electricity use in the national laboratory report | Lawrence Berkeley National Laboratory23 | the report page returned an access error |
| Orbital infrastructure counts and debris | ESA Space Environment Report25 | the report page returned an access error |
| EU investment amounts for AI Factories and gigafactories | EuroHPC Joint Undertaking15 | the page read gives no amounts and lists 18 or 19 AI Factories |
| Data centre definition used by national statistics | national statistics offices12 | the release page read gives no definition |
| Effect of export measures on chip and mineral supply | agencies and independent studies28 | the rule page was not opened; no outcome data found |
| Status of national NIS2 transposition | European Commission, Member States19 | the status page was not opened |
A.5Evidence cards, two anchor sources
Issued by the International Energy Agency. One-off special report. Role: binds AIC-001 and AIC-002. Coverage: global with US, China and Europe splits. The full report was read.
EVD-SR13-001
IEA Energy and AI1
Issued by the International Energy Agency. Annual. Role: binds MIN-005. Coverage: energy and strategic minerals. The full report was read; it gives 2020 and 2023 as the earlier base for the same 72% figure.
EVD-SR13-002
IEA Global Critical Minerals Outlook 20263
| Dimension | EVD-SR13-001 | EVD-SR13-002 |
|---|---|---|
| Completeness | projection cases published; site-level data limited | refining shares for many minerals; rare earths excluded from the average |
| Timeliness | about 12 months before evidence close | about 3 months before evidence close |
| Revision | special report; later outlooks update it | revised version of July 2026 |
| Method transparency | cases and assumptions stated | country shares by mineral shown |
| External validation | industry expectations for server shipments | IEA data and expert review |
Evidence cards to follow in 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| AI | artificial intelligence |
| CER | Critical Entities Resilience |
| CRA | Cyber Resilience Act |
| CSF | Cybersecurity Framework |
| ECA | European Court of Auditors |
| GW | gigawatt |
| IEA | International Energy Agency |
| ITU | International Telecommunication Union |
| NIS2 | second Network and Information Security Directive |
| SIA | Semiconductor Industry Association |
| TWh | terawatt hour |
| WSTS | World Semiconductor Trade Statistics |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the global indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-SR13-GRID-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | 2027 |
| A.7 | Regional notes | regional technology infrastructure cards | WITH REGIONAL EDITIONS |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition: data centre electricity use
- Construct
- electricity consumed by facilities that house servers, storage and network equipment
- Unit
- terawatt hours per year
- Method
- IEA estimate built on server shipments and efficiency assumptions; national statistics use meter data
- Source
- IEA Energy and AI1; CSO Ireland12
- Uncertainty
- definitions of a data centre differ between sources
- Known limits
- does not record the service delivered or the site’s grid constraint
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 26UNVERIFIED, not opened: Synergy Research Group (ed.), cloud infrastructure market share series, cited as the intended source of provider shares; the article address returned not found and no figure is used. Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 14POST-CLOSE, context only: Epoch AI (ed.), Frontier data centres (tracker page updated 1 November 2026; 96 sites, 15.1 GW of IT power; estimated coverage of about 45% of deployed AI compute). Epoch AI. Observation year 2026. Accessed 2026-11-03.back
- 24UNVERIFIED, not opened: USGS (ed.), Mineral Commodity Summaries 2026, rare earths chapter, cited as the primary table for mine and refining shares; the file returned an access error and no figure is used. US Geological Survey, Reston. Observation year 2025. Accessed 2026-11-03.back
- 23UNVERIFIED, not opened: Lawrence Berkeley National Laboratory (ed.), 2024 United States Data Center Energy Usage Report, December 2024, cited from memory; no figure used; the page returned an access error. Observation year 2023. Accessed 2026-11-03.back
- 25UNVERIFIED, not opened: ESA (ed.), ESA Space Environment Report 2025, cited for orbital infrastructure context; the page returned an access error and no figure is used. European Space Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 15EuroHPC Joint Undertaking (ed.), AI Factories (programme page; states 19 AI Factories and 13 antennas while the listing shows 18 entries; no amounts). EuroHPC Joint Undertaking, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 12Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023, 5% in 2015). CSO, Cork. Observation year 2024. Accessed 2026-11-03.back
- 28UNVERIFIED, not opened: US Department of Commerce, Bureau of Industry and Security, rescission of the 2025 AI diffusion export measure, May 2025, cited from memory; the Federal Register page redirected to an access gate. Observation year 2025. Accessed 2026-11-03.back
- 19European Commission (ed.), NIS2 Directive (policy page; Directive (EU) 2022/2555; transposition deadline 17 October 2024). European Commission, Brussels. Observation year 2024. Accessed 2026-11-03.back
- 1IEA (ed.), Energy and AI (World Energy Outlook Special Report). International Energy Agency, Paris, April 2025. Observation year 2024. Accessed 2026-11-03.back
- 3IEA (ed.), Global Critical Minerals Outlook 2026 (revised version, July 2026). International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 4WSTS (ed.), Global Semiconductor Market grows 26% in 2025 to USD 796 billion (release page; sales of USD 795.6 billion, up 26.2%). World Semiconductor Trade Statistics, Dec 2025 data, release dated March 2026 by file name. Observation year 2025. Accessed 2026-11-03.back
- 9Eurostat (ed.), Cloud computing: statistics on the use by enterprises (Statistics Explained; 52.74% of EU enterprises with 10 or more persons used paid cloud services in 2025). Eurostat, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 10Eurostat (ed.), Use of artificial intelligence in enterprises (Statistics Explained; 19.95% of EU enterprises with 10 or more persons in 2025; large enterprises 55.03%). Eurostat, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
