The 2027 agenda
Eight bounded questions open the 2027 advanced nuclear agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 advanced nuclear edition.
Contents
- ·Edition home
- ·Executive summary
- 1Advanced nuclear is firm infrastructure and a delivery test
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Fuel supply gap while first-of-a-kind units are delayed
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- Q-01
How much enrichment and HALEU capacity will exist each year to 2030, and where are the chokepoints?
INI-XT15-FUE-01 · fuel supply; first output: fuel supply map.
- Q-02
How do announced schedules compare with delivered first-of-a-kind units?
INI-XT15-DLV-02 · schedule against delivery; first output: schedule-against-delivery table.
- Q-03
How do waste and spent-fuel volumes of advanced designs compare on a common basis?
INI-XT15-WST-03 · waste on a common basis; first output: waste comparison table.
- Q-04
What do first-of-a-kind and later units cost on a common basis, and what was assumed?
INI-XT15-CST-04 · cost on a common basis; first output: cost table.
- Q-05
How long do licensing reviews take under Part 53 and in other jurisdictions?
INI-XT15-LIC-05 · licensing pace; first output: review-time table.
- Q-06
Which national fuel-cycle and uranium supply data can be bound from primary sources?
To be admitted in 2027; first output: data gap register.
- Q-07
What workforce and fabrication capacity exists for reactor construction and fuel production?
To be admitted in 2027; first output: scoping note.
- Q-08
Which readiness capabilities have been tested in real projects, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 advanced nuclear portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT15-FUE-01 | Fuel supply | Initiative | Q-01 | PROPOSED |
| INI-XT15-DLV-02 | Schedule against delivery | Initiative | Q-02 | PROPOSED |
| INI-XT15-WST-03 | Waste on a common basis | Initiative | Q-03 | PROPOSED |
| INI-XT15-CST-04 | Cost on a common basis | Initiative | Q-04 | PROPOSED |
| INI-XT15-LIC-05 | Licensing pace | Initiative | Q-05 | PROPOSED |
| MSN-XT15-2027-01 | Fuel and delivery Universe mission | Mission | Q-01 | Candidate |
7.3The pathway
The advanced nuclear edition reads national readiness chapters, the coupled sector reports on energy, minerals and supply chains, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
nuclear programme and fuel readiness in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-02 energy · SR-04 minerals · SR-03 supply chains
GS-02 DRAFTED · sector baselines
- 03
Technology system model
reactors, fuel cycle, siting, waste, licensing
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-02 lifeline systems · SR-13 strategic technology
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-15 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the advanced nuclear candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT15-2027-01 · Fuel and delivery Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| INF-001 · fleet | INI-XT15-DLV-02 | schedule against delivery | PUBLIC |
| INF-003 · Natrium permit | INI-XT15-DLV-02 | schedule against delivery | PUBLIC |
| GOV-004 · Part 53 | INI-XT15-LIC-05 | licensing pace | PUBLIC |
| MIN-006 · HALEU | INI-XT15-FUE-01 | fuel supply | PUBLIC |
| TRD-007 · enrichment | INI-XT15-FUE-01 | fuel supply | PUBLIC |
| FIN-008 · large-unit cost | INI-XT15-CST-04 | cost on a common basis | PUBLIC |
| WAS-010 · waste volumes | INI-XT15-WST-03 | waste on a common basis | PUBLIC |
| SYS-012 · compound pathway | MSN-XT15-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| NRC and DOE news pages on advanced reactors | regulator and agency | per release | INF-003 |
| Reactor Pilot Program updates | DOE and companies | per event | INF-002 |
| World nuclear fleet and country pages | industry association | continuous | INF-001 |
| HALEU and enrichment notices | DOE and operators | per event | MIN-006 |
| Enrichment capacity data | industry association | annual | TRD-007 |
| Country cost and schedule records | owners and national audit bodies | per event | FIN-008 |
| Repository licensing notices | national regulators | per event | WAS-010 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT15-001 | Four DOE-authorized test reactors reached criticality by 4 July 20267 | CORROBORATED | INF | research question Q-02 |
| SIG-XT15-002 | NRC construction permit for a sodium-cooled power reactor in March 20268 | CORROBORATED | INF · GOV | research question Q-05 |
| SIG-XT15-003 | Operating licence for Finnish used-fuel disposal in October 202621 | PARTIAL | WAS · GOV | initiative Q-03 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back