Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
Contents
- ·Edition home
- ·Executive summary
- 1Advanced nuclear is firm infrastructure and a delivery test
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Fuel supply gap while first-of-a-kind units are delayed
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
B.1The indicator set
| Indicator | Value | Unit | Year | State | Source |
|---|---|---|---|---|---|
| Operable reactors, world | 443 | reactors | 2025 | Reported | 1 |
| Net capacity of operable reactors | 405,667 | MWe | 2025 | Reported | 1 |
| Share of world electricity | ≈9 | % | 2025 | Reported | 1 |
| Reactors under construction | 80 | reactors | 2025 | Reported | 1 |
| Test reactors critical under the DOE pilot program | 4 | reactors | 2026 | Reported | 7 |
| Natrium base output | 345 | MWe | 2026 | Reported | 8 |
| Natrium output with storage | 500 | MW | 2026 | Reported | 8 |
| NRC review time for the Natrium permit | 18 | months | 2026 | Reported | 9 |
| HALEU enrichment range | 5 to <20 | % U-235 | 2024 | Reported | 11 |
| DOE estimate of US HALEU demand in 2035 | 50 | tonnes a year | 2024 | Reported | 11 |
| World enrichment capacity | 68.076 | million SWU a year | 2025 | Reported | 12 |
| Rosatom enrichment capacity | 29.133 | million SWU a year | 2025 | Reported | 12 |
| Vogtle 3 and 4 total cost estimate, May 2022 | 30.34 | USD billion | 2022 | Reported | 15 |
| Hinkley Point C cost estimate, February 2026 | 35 | GBP billion, 2015 prices | 2026 | Reported | 17 |
| EPR2 programme cost estimate, six units | 72.8 | EUR billion | 2025 | Reported | 20 |
| Darlington four-unit cost estimate | 20.9 | CAD billion | 2026 | Reported | 14 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- INF
- MIN
- FIN
- TRD
- ENE
- CLI
- GOV
- WAT
- HLT
- FOO
| Source | Category | Coverage | Period | Cadence | Role |
|---|---|---|---|---|---|
| WNA world nuclear power page1 | industry association | global | 2025 | continuous | fleet |
| IAEA projections2 | intergovernmental agency | global | 2025 | annual | 2050 cases |
| White House orders345 | head of government | US | 2025 | one-off | goals |
| ANS and DOE pilot program reports67 | professional society and agency | US | 2026 | per event | test reactors |
| DOE and trade reports on Natrium89 | agency and trade press | US | 2026 | per event | permit |
| NRC Part 53 page10 | national regulator | US | 2026 | periodic | licensing |
| DOE HALEU page11 | agency | US | 2024 | periodic | fuel |
| WNA enrichment page12 | industry association | global | 2025 | annual | capacity |
| WNA country pages14 to21 | industry association | eight countries | 2025 to 2026 | continuous | projects and cost |
| Steigerwald et al. and Krall et al.252627 | peer-reviewed journals | method | 2022 to 2023 | one-off | cost and waste |
B.3Regional reading, advanced nuclear across ten clusters
Regional plates follow with the regional editions. This page gives the regional reading of advanced nuclear infrastructure and fuel exposure in table form and orders no region.
| Region | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| North America | NRC permits and DOE test reactors; Canadian small reactor under construction | licensing, fuel | DOE78; WNA1415 |
| South America | national programmes | none bound | regional evidence (not bound) |
| Europe | UK small reactor contract; French EPR2 programme; Finnish repository licence (post-close, context only21) | cost, waste | WNA1720 |
| Eurasia | sodium-cooled and lead-cooled reactors; floating units | delivery, fuel | WNA1623 |
| Middle East and North Africa | four APR1400 units in operation at Barakah | export delivery | WNA19 |
| Africa | national programmes | none bound | regional evidence (not bound) |
| South Asia | national programmes | none bound | regional evidence (not bound) |
| East Asia | Chinese fleet and gas-cooled reactor; Korean small reactor design review | delivery, enrichment | WNA181912 |
| ASEAN | Indonesia agreement for floating small units, October 2026 | export delivery | WNA16 |
| Oceania-Pacific | national programmes | none bound | regional evidence (not bound) |
B.4Cluster card: enrichment and HALEU supply chain
- fuel supply
- enrichment
- HALEU
- single point
- Systems in view
- enrichment plants, deconversion, fuel fabrication, reactor developers
- Defining events
- US ban on Russian low-enriched uranium imports from August 202412
- Couplings
- MIN → ENE fuel; TRD → MIN restrictions
- Capability evidence
- Piketon centrifuge cascade and recovery of existing material reported by DOE11
- Gaps
- HALEU output by year; reserves; fabrication capacity
- Agenda items
- Q-01 · Q-04
Four operators hold nearly all world enrichment capacity, and one holds about 43% of the 2025 total [12].
SUPPLY
Concentrated capacity
DOE estimates US HALEU demand could reach 50 tonnes a year by 2035, while Piketon had enriched more than 100 kg by late 2024 [11].
DEMAND
HALEU against supply
The US prohibits imports of Russian low-enriched uranium from August 2024, with waivers to the start of 2028 [12].
POLICY
Import limits
B.5How countries appear in the advanced nuclear edition
Countries enter the advanced nuclear edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ordered.
| Card field | What it shows | Source |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| Couplings | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| Wave | Countries and unions | State |
|---|---|---|
| W0 | Canada | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6Licences
| Material | Licence |
|---|---|
| Text | CC BY 4.0 |
| Data | on the licence of each source; Nexus tables CC BY 4.0 |
| Figures | Nexus figures CC BY 4.0; third-party as credited |
| Maps | boundary source and licence printed on each plate |
| Metadata | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| Format | Kind | State | What it is | Identifier |
|---|---|---|---|---|
| Web edition | HTML | On this site | Draft in stewardship review; every value resolves to its source. | NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-XTECH-FISSION-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | On this site | 16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-XTECH-FISSION-GLOBAL-2026-BASELINE data release v1 |
| Figures | SVG · PNG | On this site | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-XTECH-FISSION-GLOBAL-2026-BASELINE-* |
| Slides | Not recorded | No slide deck is recorded for this edition. | ||
| Evidence brief | HTML · PDF | Not recorded | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
Provenance
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Evidence cut
- DC-XTECH-FISSION-GLOBAL-2026-B0, closed 30 September 2026
- Reproducibility
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- Review
- five passes scheduled before release (in Annex C)
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium
- Corrections
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1World Nuclear Association (ed.), Nuclear Power in the World Today (information library page; 443 operable reactors, 405,667 MWe net, about 9% of world electricity, 80 under construction with 87,813 MWe gross; electricity data for 2025). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 7US Department of Energy (ed.), Department of Energy Celebrates Fourth Criticality Ahead of July 4th Goal (press release, 6 July 2026; Aalo-X, Mark-0, Ward 250 and Unity; zero-power fueled criticality; agency announcement). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 8US Department of Energy, Office of Nuclear Energy (ed.), NRC Issues Construction Permit for TerraPower’s Natrium Advanced Reactor (article, 9 March 2026; 345 MWe sodium-cooled fast reactor, storage lifts output to 500 MW; Kemmerer Unit 1, Wyoming; operating licence separate). US Department of Energy, Washington. Observation year 2026. Accessed 2026-11-03.back
- 9World Nuclear News (ed.), NRC issues construction permit for first Natrium plant (news report, 5 March 2026; 18-month review against 27 months initially; completion expected 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 11US Department of Energy, Office of Nuclear Energy (ed.), What is high-assay low-enriched uranium (HALEU)? (article of 3 December 2024; enrichment 5% to less than 20% U-235; demand could reach 50 metric tons a year by 2035; Piketon more than 100 kg enriched). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 12World Nuclear Association (ed.), Uranium Enrichment (information library page; capacity table from the WNA Nuclear Fuel Report 2025: 68.076 million SWU in 2025, Rosatom 29.133, Urenco 17.300, CNNC 13.789 estimated, Orano 7.500; US ban on Russian low-enriched uranium from August 2024). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 15World Nuclear Association (ed.), Nuclear Power in the USA (country profile; 94 operable reactors, 96,952 MWe; Vogtle 3 and 4 cost estimates; Kemmerer permit March 2026; Clinch River construction licence September 2026; Palisades and Crane restart status; page states three reactors critical by July 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 17World Nuclear Association (ed.), Nuclear Power in the United Kingdom (country profile, first 100,000 characters read; Rolls-Royce SMR delivery contract April 2026 for three Wylfa units with up to GBP 599 million loan financing; Hinkley Point C GBP 35 billion in 2015 prices, February 2026; Sizewell C). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 20World Nuclear Association (ed.), Nuclear Power in France (country profile, first 100,000 characters read; 57 operable reactors; EPR2 six units, EUR 72.8 billion estimate of December 2025; Flamanville 3 grid connection December 2024, EUR 13.2 billion estimate of December 2022). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 14World Nuclear Association (ed.), Nuclear Power in Canada (country profile; Darlington BWRX-300, construction licence April 2025, first nuclear concrete 26 June 2026, operation expected 2030, CAD 20.9 billion for four units; page lists 316 MWe gross and describes 300 MWe). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 2UNVERIFIED, not opened: IAEA (ed.), Energy, Electricity and Nuclear Power Estimates for the Period up to 2050, 2025 edition (377 GW at end of 2024; high case 992 GW and low case 561 GW in 2050), taken from search-result summaries of trade reports; the IAEA page was not retrieved. International Atomic Energy Agency, Vienna. Observation year 2025. Accessed 2026-11-03.back
- 3The White House (ed.), Ordering the Reform of the Nuclear Regulatory Commission, Executive Order 14300, 23 May 2025 (goal of 400 GW by 2050 from about 100 GW in 2024; 18-month limit for new reactor decisions; 1-year limit for continued operation). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 4The White House (ed.), Reinvigorating the Nuclear Industrial Base, Executive Order 14302, 23 May 2025 (5 GW of uprates; 10 new large reactors with complete designs under construction by 2030; fuel, enrichment and spent fuel directions). The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 5UNVERIFIED, not opened: The White House (ed.), Reforming Nuclear Reactor Testing at the Department of Energy, Executive Order 14301, 23 May 2025, the page address returned not found; the goal of three reactors achieving criticality by 4 July 2026 is taken from the American Nuclear Society report. The White House, Washington. Observation year 2025. Accessed 2026-11-03.back
- 6American Nuclear Society (ed.), The deadline arrives: checking in on the Reactor Pilot Program (news article, 2 July 2026; criticality by Antares 4 June, Valar 18 June, Deployable Energy 1 July; ten companies selected in August 2025; status of the remaining participants). American Nuclear Society, La Grange Park. Observation year 2026. Accessed 2026-11-03.back
- 10US Nuclear Regulatory Commission (ed.), 10 CFR Part 53 rulemaking page (final rule 91 FR 15696; risk-informed, performance-based, technology-inclusive framework; background in NEIMA and the ADVANCE Act). US Nuclear Regulatory Commission, Rockville. Observation year 2026. Accessed 2026-11-03.back
- 21POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Finland (country profile; Olkiluoto 3 contract of EUR 3.2 billion for mid-2009, regular production April 2023; Onkalo operating licence granted October 2026 valid to the end of 2070, after the 30 September evidence close). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 25Steigerwald, B., Weibezahn, J., Slowik, M. and von Hirschhausen, C., Uncertainties in estimating production costs of future nuclear technologies: a model-based analysis of small modular reactors, Energy 281, 128204, 2023 (abstract page read). Elsevier, Amsterdam. Observation year 2023. Accessed 2026-11-03.back
- 26Steigerwald, B. et al., Future nuclear fission reactors: uncertainties, the effect of parameter choice and an application to small modular reactor concepts, Safety of Nuclear Waste Disposal 2, 217, 2023 (abstract page read; 15 concepts; none competes with existing renewables on its assumptions). Copernicus Publications, Gottingen. Observation year 2023. Accessed 2026-11-03.back
- 27Krall, L.M., Macfarlane, A.M. and Ewing, R.C., Nuclear waste from small modular reactors, Proceedings of the National Academy of Sciences 119(23), e2111833119, 2022 (open-access full text, abstract and conclusions read; waste volume factors of 2 to 30; three designs). National Academy of Sciences, Washington. Observation year 2022. Accessed 2026-11-03.back
- 16POST-CLOSE, context only: World Nuclear Association (ed.), Nuclear Power in Russia (country profile, first 100,000 characters read; 34 operable reactors, 27,969 MWe; BREST-OD-300 under construction since June 2021; Akademik Lomonosov 2 x 32 MWe, grid connection December 2019; Indonesia agreement October 2026). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 23World Nuclear Association (ed.), Advanced Nuclear Power Reactors (information library page, updated November 2025; Generation IV forum set up in 2001 with six concepts; sodium-cooled and lead-cooled fast reactors; molten salt reactors not covered). World Nuclear Association, London. Observation year 2025. Accessed 2026-11-03.back
- 19World Nuclear Association (ed.), Nuclear Power in South Korea (country profile; 26 operable units, 25,609 MWe; i-SMR 170 MWe design, standard design approval application February 2026, approval targeted 2028; Barakah units in operation, last in September 2024). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back
- 18World Nuclear Association (ed.), Nuclear Power in China (country profile, first 100,000 characters read; 65 reactors, 65,085 MWe operable; 39 under construction; HTR-PM commercial operation December 2023; Linglong One commissioning expected during 2026; 110 GWe target by 2030). World Nuclear Association, London. Observation year 2026. Accessed 2026-11-03.back