- Argentina 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.
Contents
- ·Edition home
- ·Executive summary
- 1Argentina’s risk is hydrological and fiscal at once
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Multi-year drought with low Paraná flows
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- A-01
How would a multi-year drought with low Paraná flows cut harvests, river exports, hydropower and public revenue together?
INI-ARG-WAT-01 · drought–river–revenue test; first output: dependency graph for the Paraná basin.
- A-02
How does the gas and hydro balance hold in a dry, cold year as oil and gas output grow?
INI-ARG-ENE-02 · power in dry years; first output: generation-mix and storage register.
- A-03
How exposed are grain exports to river logistics and weather together?
INI-ARG-FOO-03 · export exposure; first output: commodity and route dependence table.
- A-04
How much surge capacity do health services hold for heat and vector-borne disease?
INI-ARG-HLT-04 · heat and vectors; first output: surge baseline for five provinces.
- A-05
Where do flash floods and storms fall on uninsured households and public budgets?
INI-ARG-FIN-05 · protection gap; first output: peril-by-province loss table.
- A-06
How do fire and drought interact in the Paraná delta and the north-east?
INI-ARG-BIO-01 · fire and wetlands; first output: fire-season exposure note.
- A-07
How would a changed forest or glacier law alter basin risk?
To be admitted in Q1 2027; first output: scoping note.
- A-08
Which capabilities have been tested in real events, and which are only listed?
National capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-ARG-WAT-01 | Drought, river and revenue test for the Paraná basin | Initiative | A-01 | PROPOSED |
| INI-ARG-ENE-02 | Power balance in dry years | Initiative | A-02 | PROPOSED |
| INI-ARG-FOO-03 | Grain export exposure to weather and river logistics | Initiative | A-03 | PROPOSED |
| INI-ARG-HLT-04 | Heat and vector-borne disease surge baseline | Initiative | A-04 | PROPOSED |
| INI-ARG-FIN-05 | Flash flood and storm protection gap | Initiative | A-05 | PROPOSED |
| PRJ-ARG-WAT-01a | Paraná basin dependency graph | Project | A-01 | PROPOSED |
| MSN-ARG-2027-01 | Drought–river–revenue Universe mission | Mission | A-01 | Candidate |
7.3The pathway
Argentina is the national pathway through which the Nexus operating system will run in Argentina from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.
- 01
One National Agenda
bounded national questions for the year
DRAFT 2027 · agenda review at the Q1 alignment
- 02
National Desk
coordination, records, routing and continuity
DESIGNED · constituted in Q1 2027
- 03
National Model
the country as a system of systems
v0 SPECIFIED · v1 with the first Foundry cut
- 04
National Portfolio
risks, capabilities, initiatives, projects, missions
7 PROPOSED · admission at the Q1 alignment
- 05
Foundry
continuous computational environment
PREPARED · first sealed cut NQ-ARG-2027-Q1
- 06
quarterly and annual publication
BASELINE ISSUED · Q1 2027 · State & Agenda
- 07
Universe
annual proving environment
CANDIDATE MISSION · mandate set in 2027
- 08
Evidence and correction
after-action, correction and renewal
OPEN · first correction cycle in Q2 2027
7.4Universe 2027, evidence pack for the candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | Q4 2027 annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-ARG-2027-01 · Drought–river–revenue Universe mission
- Role spine
- Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| CLI-001 · emissions | public record | reference for the 2027 series | PUBLIC |
| WAT-005 · Paraná flows | INI-ARG-WAT-01 | drought–river–revenue test | PUBLIC |
| ENE-003 · power mix | INI-ARG-ENE-02 | dry-year balance | PUBLIC |
| FOO-006 · drought | INI-ARG-FOO-03 | export exposure | PUBLIC |
| HLT-009 · vector-borne disease | INI-ARG-HLT-04 | heat and vectors | PUBLIC |
| CLI-007 · Bahía Blanca | INI-ARG-FIN-05 · key F review | protection gap | PUBLIC |
| BIO-011 · protected land | INI-ARG-BIO-01 | fire and wetlands | PUBLIC |
| SYS-012 · compound pathway | MSN-ARG-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the national pathway | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Weather and rainfall alerts | Servicio Meteorológico Nacional | real time | CLI findings |
| River level and hydrological reports | Instituto Nacional del Agua | periodic | WAT-005 |
| Electricity demand and supply | CAMMESA | daily | ENE findings |
| Crude oil and gas output | Secretaría de Energía | monthly | ENE-004 |
| Harvest and planting estimates | Bolsa de Cereales de Buenos Aires | weekly in season | FOO-006 |
| Fire and burned-area reports | Servicio Nacional de Manejo del Fuego | seasonal | CLI-008 |
| Epidemiological bulletin | Ministerio de Salud | weekly | HLT-009 |
| Poverty and price series | INDEC | half-yearly and monthly | FIN-010 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- quarterly publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-ARG-001 | Record rain at Bahía Blanca on 7 March 202514 | CORROBORATED | CLI · WAT · INF | risk object RSK-ARG-CLI-002 |
| SIG-ARG-002 | Record crude oil output in 202610 | CORROBORATED | ENE · FIN | initiative A-02 |
| SIG-ARG-003 | Poverty rise in the first half of 20263 | CORROBORATED | FIN · HLT | initiative A-05 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 14Servicio Meteorológico Nacional (ed.), Report on the storm of 7 March 2025 at Bahía Blanca (about 290 mm in twelve hours; previous record 167.6 mm in 1933), as cited by BAE Negocios, 14 March 2025. SMN, Buenos Aires, 2025. Observation year 2025.back
- 10Secretaría de Energía (ed.), Crude oil production, July 2026 (916,200 barrels a day; +17.2% year on year to June), as reported by Infobae, 9 August 2026. Government of Argentina, Buenos Aires, 2026. Observation year 2026. https://www.infobae.com/economia/2026/08/09/los-records-de-vaca-muerta-acercan-a-la-argentina-al-1-de-la-produccion-petrolera-mundial/, accessed 2026-11-03.back
- 3INDEC (ed.), Incidencia de la pobreza y la indigencia en 31 aglomerados urbanos, primer semestre de 2026 (EPH). INDEC, Buenos Aires, 24 September 2026. Observation year 2026. Figures read via press summaries of the release, 2026-11-03.back
