Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Risks and capability

Four risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.

4 min read0 figures1 table12 notesNR-COUNTRY-CHN-2026-BASELINE

Contents
  1. ·Edition home
  2. ·Executive summary
  3. 1China’s risk is climatic, seismic and demographic at continental scale
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
    1. 4.1 Risk objects
    2. 4.2 Capability ladder
  7. 5Extreme rain on a dense plain in a hot summer
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

4.1Risk objects

Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.

  1. EstimatedEQL 4RSK-CHN-CLI-001

    Record heat and hot-day extremes

    Driver
    warming and persistent heat processes
    Exposure
    central and eastern provinces; 11 units had record annual temperature3
    Vulnerability
    older population (15.9% aged 65 or over)1
    Capacity
    not bound: heat alert and cooling-shelter records
    Cascade
    CLI → HLT → ENE peak
    Horizon
    seasonal
  2. ReportedEQL 4RSK-CHN-CLI-002

    Extreme rain and river flooding

    Driver
    more intense rainfall and long rainy seasons3
    Exposure
    dense plains, reservoirs and underground spaces14
    Vulnerability
    drainage and reservoir condition not bound
    Capacity
    red rainstorm warnings issued in 202114
    Cascade
    CLI → WAT → INF, HLT
    Horizon
    annual
  3. ReportedEQL 3RSK-CHN-SEI-003

    Strong earthquakes on the plateau and in basins

    Driver
    continental collision tectonics
    Exposure
    Dingri 2025: 126 deaths by the evening of the event15
    Vulnerability
    building condition by province not bound
    Capacity
    not bound: seismic code and response records
    Cascade
    SEI → INF, HLT
    Horizon
    30 years
  4. EstimatedEQL 3RSK-CHN-ENE-004

    Coal-led power under rising demand and import exposure

    Driver
    demand growth and heat peaks
    Exposure
    power, industry, households
    Vulnerability
    coal 54.8% of electricity; net energy imports 24.0% of energy use410
    Capacity
    1,842 GW of wind and solar installed1
    Cascade
    ENE → WAT, HLT, FOO
    Horizon
    1 to 5 years

4.2Capability ladder

Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence at baseline.

Table 4.1Capabilities on the ladder of evidence: listed, exists, demonstrated, tested
FunctionRungLevelStrongest public evidence at baseline
Prevention and mitigationNOT BOUNDsource: building, flood-control and land-use registers · blocker: not retrieved by evidence close
Monitoring and observationEXISTSnational climate monitoring and an annual climate bulletin are published3
Early warningEXISTSred rainstorm warnings were issued before the Zhengzhou rain; the investigation found response gaps14
Preparedness and planningLISTEDthe Emergency Response Law was revised in 2025; use in practice not bound26
Redundancy and reservesNOT BOUNDsource: grain and water reserve data · blocker: not published in bound form
ResponseNOT BOUNDsource: Ministry of Emergency Management response records · blocker: not retrieved
Continuity of critical servicesNOT BOUNDsource: utility restoration records · blocker: not retrieved
RecoveryNOT BOUNDsource: provincial reconstruction records after the 2021 flood · blocker: not retrieved
AdaptationLISTEDthe National Climate Change Adaptation Strategy 2035 exists; delivery not bound29
Social protectionNOT BOUNDsource: social-insurance registers · blocker: not reviewed
Finance and insuranceNOT BOUNDsource: National Financial Regulatory Administration insurance statistics · blocker: not retrieved
Institutional coordinationEXISTSmonthly national natural disaster releases are published by the Ministry of Emergency Management16
Technical infrastructureEXISTSabout 3,891 GW of installed power capacity, 1,842 GW of it wind and solar1
WorkforceNOT BOUNDsource: emergency and health workforce statistics · blocker: not reviewed
Research capacityLISTEDpeer-reviewed national climate, heat and water studies exist313235
A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline.

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 3National Climate Center, China Meteorological Administration (ed.), China Climate Bulletin (2025). CMA, Beijing, 12 February 2026. Observation year 2025.back
  2. 1National Bureau of Statistics of China (ed.), Statistical Communiqué of the People’s Republic of China on the 2025 National Economic and Social Development. NBS, Beijing, 28 February 2026. Observation year 2025.back
  3. 14Disaster Investigation Team of the State Council (ed.), Investigation Report on the “7·20” Extraordinarily Heavy Rainstorm Disaster in Zhengzhou, Henan. Ministry of Emergency Management, Beijing, January 2022. Observation year 2021.back
  4. 15Science and Technology Daily (ed.), “Dingri County earthquake has killed 126 people and injured 188 (西藏定日县地震已致126人遇难、188人受伤).” Beijing, 7 January 2025. Observation year 2025.back
  5. 4Ember (ed.), Yearly Electricity Data: China, generation, capacity and emissions intensity. Ember, London, retrieved 3 November 2026. Observation year 2025.back
  6. 10World Bank (ed.), World Development Indicators: Energy imports, net (EG.IMP.CONS.ZS), Food imports (TM.VAL.FOOD.ZS.UN) and PM2.5 air pollution, mean annual exposure (EN.ATM.PM25.MC.M3). World Bank, Washington DC, retrieved 3 November 2026. Observation years 2024, 2025 and 2023.back
  7. 26Standing Committee of the National People’s Congress (ed.), Emergency Response Law of the People’s Republic of China, revised 2025. Beijing, 2025.back
  8. 29Ministry of Ecology and Environment and partner departments (eds.), National Climate Change Adaptation Strategy 2035. Beijing, 2022.back
  9. 16Ministry of Emergency Management of China (ed.), national natural disaster releases (全国自然灾害情况), monthly and annual. MEM, Beijing, retrieved 3 November 2026. Observation year latest available.back
  10. 31S. Piao, P. Ciais, Y. Huang et al., “The impacts of climate change on water resources and agriculture in China,” Nature, vol. 467, pp. 43–51, 2010.back
  11. 32Y. Sun, X. Zhang, F. W. Zwiers et al., “Rapid increase in the risk of extreme summer heat in Eastern China,” Nature Climate Change, vol. 4, pp. 1082–1085, 2014.back
  12. 35J. Liu, H. Yang, S. N. Gosling et al., “Water scarcity assessments in the past, present, and future,” Earth’s Future, vol. 5, pp. 545–559, 2017.back

Cite this chapter

Valadbaygi, S. (Ed.). (2026). Chapter 4: Risks and capability. In China Systems Risk and Resilience Report 2026: The State of China’s Interdependent Systems (Baseline Edition 2026, Report No. NR-COUNTRY-CHN-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ReportsContribute

Send evidence or a correction on China.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskCountry Systems Risk and Resilience

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.