Reports · GCRI · Country profile
Senegal 2026
Senegal
Senegal (République du Sénégal) enters 2027 with 18.1 million residents at the 2023 census, 54.7% of them urban and 39.1% under 15. The economy grew 6.7% in 2025 as oil production began, while non-hydrocarbon growth was 2.2% and the IMF describes fiscal and debt vulnerabilities as elevated.
- Bevindinge
- 12
- each with its status and source
- Sectors with findings
- 5 of 6
- Infrastructure not assessed
- Risk objects
- 4
- order carries no rank
- Bronne
- 55
- Evidence close 30 September 2026
01 · Readings
Senegal in six readings.
Six readings that frame the Senegal baseline, and the eight questions this edition answers, each with its status and source.
02 · Sectors
Six sectors, one hexagon.
Water first, then Energy, Infrastructure, Food, Health and Biodiversity. Each count is the findings of this edition in that sector: coverage of the evidence, never a score. Infrastructure is not assessed: the edition holds no Infrastructure finding and its coupling matrix does not assess it.
- WATWater2 findings
27.2% People using safely managed drinking water, 2024. □Reported
Basic drinking water 88.0%, safely managed 27.2%; basic sanitation 62.5%.
- ENEEnergie2 findings
82.9% Access to electricity, 2024. □Reported
Access 82.9%; 85% of generation non-renewable; oil and gas now produced offshore.
- INFInfrastruktuurnot assessed
Drainage, roads and pipes cut by floods; grid losses of 16.5%.
- FOOVoedsel1 finding
0.84 million People in Crisis or worse, projected June to August 2026, 2026. □Reported
Cereal harvest above average in 2024; 836,786 people projected in Crisis or worse.
- HLTGesondheid1 finding
358 cases Confirmed Rift Valley fever cases, 20 Sep to 30 Oct, 2025. □Reported
Rift Valley fever outbreak with 28 deaths; life expectancy 68.9 years.
- BIOBiodiversiteit1 finding
45.0 % of land Forest area, 2024. □Reported
Forest 45.0% of land; protected land 27.5%, protected waters 3.1%.
Outside the six sectors: Climate forcing 3, Finance 1, Systemic 1.
03 · Hazard exposure
The hazards this edition reads.
The edition’s own risk objects, in its order, each read across driver, exposure, vulnerability, capacity, cascade and horizon. The hexagon marks the sectors the cascade reaches; the domain beside each is an editorial reading of its hazard words.
RSK-SEN-CLI-001
Heavy-rain flooding in a dense urban area
□ReportedEQL 3
- Driver
- intense rainfall over low-lying, built-up land
- Exposure
- Touba: 70,000 people exposed; Lac Rose area: 20,000 vulnerable [24]
- Vulnerability
- schools, roads and homes flooded in 2025; 296 schools affected [25]
- Capacity
- national flood committee since 2019; regional emergency plans [25]
- Cascade
- CLI → INF, WAT, HLT
- Horizon
- annual
RSK-SEN-HLT-002
Rift Valley fever in the river valley
□ReportedEQL 3
- Driver
- mosquito-borne spread among livestock and people
- Exposure
- Saint-Louis region held 78% of cases [22]
- Vulnerability
- 358 confirmed cases and 28 deaths by 30 Oct 2025 [22]
- Capacity
- joint WHO, FAO and WOAH assessment; national response not bound
- Cascade
- HLT → FOO, FIN
- Horizon
- 1–5 years
No domain reading
RSK-SEN-ENE-003
Fuel and supply exposure of the power system
□ReportedEQL 3
- Driver
- fuel-oil dependence and import exposure
- Exposure
- households, water works, clinics, industry
- Cascade
- ENE → WAT, HLT, FIN
- Horizon
- 1–5 years
No domain reading
RSK-SEN-CLI-004
Coastal erosion and sea-level rise
□ReportedEQL 3
- Driver
- sea-level rise and storm waves on a low coast
- Exposure
- half of people and two-thirds of GDP in coastal zones [19]
- Vulnerability
- 75% of coastline at risk; losses 3.3% of GDP [19]
- Capacity
- coastal resilience projects exist; scope not bound [52]
- Cascade
- CLI → INF, WAT, FOO
- Horizon
- 5–30 years
Scenario · SCN-SEN-FLD-01
Urban flood with a water, power and clinic interruption
Under this scenario, results describe a conditional season under stated assumptions. It is not a forecast, and no intervention described here has been carried out.
2 of 12 findings name a hazard in their text. Show them
- 1CLI → INFheavy rain exceeds drainage; roads and schools are flooded
- 2INF → ENEflooded substations and access roads interrupt supply
- 3ENE → WATpumping and treatment lose power; unsafe sources are used
- 4WAT → HLTunsafe water and standing water raise exposure to disease
- 5INF → FOOcut roads delay food distribution to affected districts
- 6ENE → FINrepair and relief costs fall on the budget
04 · Couplings
How the sectors carry risk into each other.
The Senegal matrix types the twenty couplings between the five core stelsels. Strengths are Nexus estimates from the cited evidence and analogue events; they set the starting graph that the Q1 2027 Foundry cut will test.
| From | WAT | ENE | FOO | HLT | BIO |
|---|---|---|---|---|---|
| WAT | · | Strong | Strong | Moderate | Strong |
| ENE | Moderate | · | Strong | Strong | Moderate |
| FOO | Moderate | Weak | · | Strong | Strong |
| HLT | Weak | Weak | Moderate | · | Weak |
| BIO | Strong | Moderate | Strong | Moderate | · |
Water: 4 couplings out, 4 in; Energy: 4 couplings out, 4 in; Food: 4 couplings out, 4 in; Health: 4 couplings out, 4 in; Biodiversity: 4 couplings out, 4 in. Infrastructure is not in the coupling matrix: none of the edition matrices types it, so it carries no value.
Cascade paths, in the edition’s order
- CLI → INF → WATheavy rain overwhelms drainage and floods homes, roads and water points□Reported
- CLI → HLTriver and rain conditions favour outbreaks of vector-borne disease in the valley▲Inferred
- ENE → FINoil and gas output lifts growth, while fuel imports and subsidies weigh on the budget□Reported
- CLI → FOOrain deficits and floods cut crops in parts of the north and east□Reported
- ENE → WAT → HLTa power cut stops pumping and treatment, and clinics lose supply▲Inferred
05 · Findings
Every finding of Senegal.
Search, filter by sector, system or status, and sort. The address bar keeps the view, so a filtered list can be shared. Every row opens the finding at its source.
All 12 findings
| ID | Edition | Sector or system | Status | Statement |
|---|---|---|---|---|
| CLI-001 | Senegal | CLI Climate forcing | □ Reported | Greenhouse-gas emissions were about 31.7 Mt CO₂e in 2024 excluding land use: carbon dioxide 14.2 Mt, methane 12.3 Mt and nitrous oxide 3.7 Mt; agriculture supplied 9.4 Mt of the methane. Land use was a net carbon-dioxide sink of 13 Mt in 2023. |
| CLI-002 | Senegal | CLI Climate forcing | □ Reported | The 2020 contribution targets a 2030 cut of 7% unconditional and 29.5% conditional below business as usual. A third contribution was validated nationally on 5 April 2026 with a reported range of 13 to 17%; its submission was not confirmed at evidence close. |
| ENE-003 | Senegal | ENE Energie | □ Reported | Access to electricity was 82.9% in 2024, up from 67.9% in 2022, with 95.7% in urban and 67.1% in rural areas; transmission and distribution losses were 16.5% of output. |
| ENE-004 | Senegal | ENE Energie | □ Reported | Installed capacity was 1,901 MW in 2024, of which 481 MW was renewable; 85% of 2023 generation was non-renewable, and imports were 70% of primary energy supply in 2022. Sangomar produced 36.1 million barrels of oil in 2025 and Grand Tortue Ahmeyim began LNG production in February 2025. |
| WAT-005 | Senegal | WAT Water | □ Reported | In 2024, 88.0% of people used at least basic drinking water but 27.2% used safely managed water, 13.2% in rural areas; 62.5% used basic sanitation and 30.1% safely managed sanitation. |
| WAT-006 | Senegal | WAT Water | □ Reported | Freshwater withdrawals were 11.9% of internal resources in 2022 and renewable internal water was 1,462 m³ per person; the World Bank projects withdrawals to grow 30% to 60% by 2035, with 81% for irrigation. |
| FOO-007 | Senegal | FOO Voedsel | □ Reported | The 2024 cereal harvest was forecast at 3.8 million tonnes, 8% above the five-year average. The March 2026 Cadre Harmonisé projected 836,786 people in Crisis or worse for June to August 2026, and 27.7% of people faced moderate or severe food insecurity in 2024. |
| HLT-008 | Senegal | HLT Gesondheid | □ Reported | WHO counted 358 confirmed human cases and 28 deaths of Rift Valley fever in Senegal between 20 September and 30 October 2025, 78% of them in the Saint-Louis region; life expectancy at birth was 68.9 years in 2024. |
| BIO-009 | Senegal | BIO Biodiversiteit | □ Reported | Forest covered 45.0% of land in 2024, down from 45.4% in 2019; 27.5% of land and 3.1% of territorial waters were protected in 2025. Mangrove extent and ecosystem threat status are not bound. |
| FIN-010 | Senegal | FIN Finansies | □ Reported | Real GDP grew 6.7% in 2025 while non-hydrocarbon growth was 2.2%; the fiscal deficit narrowed from 13.4% to 6.4% of GDP, and the IMF DataMapper series puts gross debt at 127.7% of GDP. |
| CLI-011 | Senegal | CLI Climate forcing | □ Reported | The 2025 rainy season killed 20 people, affected 8,336 and destroyed 946 ha of farmland. The World Bank estimates a drought year costs US$500 million, annual flood damage about US$100 million, and coastal erosion 3.3% of GDP. |
| SYS-012 | Senegal | SYS Systemic | ◎ Expert input | The leading compound pathway for 2027 testing is a heavy-rain flood in a dense urban area that interrupts water, power and clinics at the same time. |
06 · Editions and calendar
The desks’ editions for Senegal.
| Desk | Edition | State | Identifier |
|---|---|---|---|
| GCRI Systems Evidence | Senegal 2026 | Drafted, in stewardship review | NR-COUNTRY-SEN-2026-BASELINE-v1.0.0 |
| GRF Public Deliberation | Public Deliberation: Senegal 2026 | In preparation | |
| GRA Capital Readiness | Capital Readiness: Senegal 2026 | In preparation | |
| Standards Progress | No edition in the 2026 Baseline cycle | Not in this cycle | |
| Academy Capability | No edition in the 2026 Baseline cycle | Not in this cycle | |
| Index Measurement | Measurement: Senegal 2026 | In preparation |
Calendar · 2026 Baseline
- 01Call opensset by the editor
- 02Contribution closeset by the editor
- 03Evidence close30 September 2026
- 04Desk review and releaseset by the editor
- 05Collection compilationset by the editor
- 06Collection releaseset by the editor
- 07Regstellingsafter release, as needed
Evidence cut NQ-SEN-2026-Q0-1. Next cycles: Q1 2027, Q2 2027, Q3 2027, Q4 2027; their dates are set by the editor.
07 · Take part
Read it, improve it, cite it.
- ReadThe edition, chapter by chapter, with every source.
- Dra bySend evidence, a source or a method before the next cut.
- ReviewJoin the stewardship review of this edition.
- CiteAPA, Chicago, BibTeX, RIS and the house style, as a draft.
- PDFThe signed PDF is issued at release; print the complete edition today.
Corrections log
| Version | Date | State | Change | Notice |
|---|---|---|---|---|
| NR-COUNTRY-SEN-2026-BASELINE-v1.0.0 | October 2026 | DRAFT | Baseline Edition 2026, inaugural annual edition, | none |
Data gaps3What the repository does not hold yet, and the source proposed for each
| Gap | Shown here as | Proposed source |
|---|---|---|
| Exposure values per hazard (people, assets, hectares) | the edition’s own risk objects, without values | the Index country profile once the Index releases values, risksindex.com/sen/ |
| The NHS-1 hazard types and their assignment to this edition’s risk objects | an editorial reading of the hazard words | the NHS-1 type assignment through the Registry |
| Infrastructure in the coupling matrix | Infrastructure marked not assessed | an Infrastructure row and column in the edition matrix at the next cut |
Send evidence or a correction on Senegal.
Verslae is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Stelsels Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.
- E-posGateway GW-GCRIStuur dit vanaf hierdie bladsyGetuienis, 'n regstelling, 'n geval, 'n metode, 'n beoordeling, 'n vertaling of profielinset. Dit kom aan gemerk met hierdie bladsy, sodat die redakteur wat dit besit dit ontvang.
- ZenodoOop deponeringDeponeer dit en dien dit in by die gemeenskapPubliseer u eie rekord op Zenodo met u ORCID iD, en dien dit dan daar in by die Reports-gemeenskap. Kurators beoordeel dit; die DOI bly joune.
- VerslaeGCRISee which desk takes what you haveThe routing table opens the contribution page: what you have, the desk that takes it, how each contribution is reviewed and credited, and the licence.
Stuur nooit persoonlike data, sensitiewe infrastruktuurbesonderhede of enigiets wat u geen reg het om te deel nie. 'n Bydrae word voor gebruik beoordeel; die stuur daarvan verleen geen outeurskap of redaksionele regte nie, en borgskap koop nooit 'n bevinding nie.
CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.