The 2027 agenda
Eight bounded questions open the 2027 Earth observation agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 Earth observation edition.
Contents
- ·Edition home
- ·Executive summary
- 1Earth observation is infrastructure and evidence
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Continuity gap in public Earth observation data
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- O-01
How continuous are the free public data streams if a mission fails or funding changes, and which users depend on a single stream?
INI-XT19-CON-01 · continuity of public data; first output: continuity register.
- O-02
How much do navigation interference and spoofing affect timing, location and tasking of observation services?
INI-XT19-NAV-02 · navigation interference; first output: interference overlay.
- O-03
How can commercial fleet counts, revisit and resolution be compared on a common basis?
INI-XT19-COM-03 · claims on a common basis; first output: comparison table.
- O-04
What do ground segments, archives and processing need in power, cooling and water?
INI-XT19-FPR-04 · footprint; first output: footprint estimates.
- O-05
How large are archives, and who can reach them at what cost?
INI-XT19-ARC-05 · archives and access; first output: access map.
- O-06
Which national policies set data terms, licensing and procurement for observation?
To be admitted in 2027; first output: policy overlay.
- O-07
What workforce exists for sensor engineering, analysis and geospatial services?
To be admitted in 2027; first output: scoping note.
- O-08
Which readiness capabilities have been tested in real continuity events, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 Earth observation portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT19-CON-01 | Continuity of public data | Initiative | O-01 | PROPOSED |
| INI-XT19-NAV-02 | Navigation interference | Initiative | O-02 | PROPOSED |
| INI-XT19-COM-03 | Claims on a common basis | Initiative | O-03 | PROPOSED |
| INI-XT19-FPR-04 | Ground-segment footprint | Initiative | O-04 | PROPOSED |
| INI-XT19-ARC-05 | Archives and access | Initiative | O-05 | PROPOSED |
| MSN-XT19-2027-01 | Continuity gap Universe mission | Mission | O-01 | Candidate |
7.3The pathway
The Earth observation edition reads national readiness chapters, the coupled sector reports on climate, disaster and infrastructure, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
observation and geospatial readiness in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-12 Earth observation · GS-07 climate · GS-08 disaster
GS-12 DRAFTED · sector baselines
- 03
Technology system model
satellites, data, navigation, funding, governance
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-02 lifeline systems · SR-13 strategic technology
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-19 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the Earth observation candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT19-2027-01 · Continuity gap Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| INF-001 · land imaging | INI-XT19-CON-01 | continuity of public data | PUBLIC |
| INF-002 · radar | INI-XT19-CON-01 | continuity of public data | PUBLIC |
| INF-005 · commercial counts | INI-XT19-COM-03 | claims on a common basis | PUBLIC |
| GOV-010 · navigation | INI-XT19-NAV-02 | navigation interference | PUBLIC |
| DAT-007 · open data | INI-XT19-ARC-05 | archives and access | PUBLIC |
| INF-004 · orbits | INI-XT19-FPR-04 · key F review | ground-segment footprint | PUBLIC |
| FIN-011 · funding | regional consortia | funding overlay | PUBLIC |
| SYS-012 · compound pathway | MSN-XT19-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| USGS and NASA mission pages | agencies | per event | INF-001 |
| ESA Sentinel pages | agency | per event | INF-003 |
| Orbit tracking and ESA reports | agency | annual | INF-004 |
| Vendor announcements | companies | per event | INF-005 |
| Annual tree cover loss release | WRI and university | annual | CLI-009 |
| Appropriations and budget requests | legislature and agencies | annual | FIN-011 |
| Aviation interference reporting | EASA and IATA | per release | GOV-010 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT19-001 | Tropical primary forest loss reached 6.7 million hectares in 202412 | CORROBORATED | CLI · INF | research question O-01 |
| SIG-XT19-002 | Navigation signal loss events rose 220% from 2021 to 202423 | PARTIAL | GOV · INF | initiative O-02 |
| SIG-XT19-003 | Vendor fleet counts differ across sources2021 | PARTIAL | INF | research question O-03 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 12WRI (ed.), Global Forest Loss Shatters Records in 2024, Fueled by Massive Fires (release of 21 May 2025; 6.7 million hectares of tropical primary forest lost; nearly 50% from fire; Brazil 42%; data from the University of Maryland GLAD Lab at about 30 m). World Resources Institute, Washington. Observation year 2024. Accessed 2026-11-03.back
- 23EASA (ed.), EASA and IATA publish comprehensive plan to mitigate GNSS interference (release of 18 June 2025; four workstreams; workshop of over 120 experts in May 2025; IATA reports 220% rise in GPS signal loss events from 2021 to 2024). European Union Aviation Safety Agency, Cologne. Observation year 2025. Accessed 2026-11-03.back
- 20ESA (ed.), ICEYE, Earth Online third party mission page (82 X-band SAR satellites launched for the ICEYE constellation as of 2026; constellation mean revisit at the equator 20 hours; access by accepted project proposal). European Space Agency, Frascati. Observation year 2026. Accessed 2026-11-03.back
- 21ICEYE (ed.), ICEYE launches four new satellites aboard Transporter-17 (release; launch 7 July 2026; 76 satellites launched in total; up to 16 cm resolution claimed; vendor announcement, weak evidence). ICEYE, Espoo. Observation year 2026. Accessed 2026-11-03.back
