GCRI · 与 GCRI 合作
基础设施与产业
Utilities, infrastructure and essential-service operators, manufacturers and industry associations can work with The Global Centre for Risk and Innovation (GCRI) on dependency and resilience evidence, research and development, and safe trials. Work starts from an operational mission and ends with a handoff. The operator keeps its assets and decisions. No membership grants access to production systems. Part of Work with GCRI.
Infrastructure and industry in four parts.
Evidence, R&D and safe trials.
每项工作都围绕运营方自身负责的运营问题界定范围。
应用研究
与运营方共同开发的方法和工具,权利在一开始即约定。
受控测试
Test designs with stop rules, run in controlled settings before anything touches live operations.
Two starting points.
| 执行方 | 第一步 | 首个成果 |
|---|---|---|
| Utilities, infrastructure and essential-service operators | 提交一项基于运营实际的使命 | 依赖性研究、受控测试设计、方案与局限,以及向运营方的移交 |
| 企业、制造商和行业协会 | 探索行业项目 | A work scope, permitted data exchange, evaluation terms and an operational output |
流程如何运行。
Process explorer · Process
基础设施与产业:工作组,自章程起至终止
9 steps·4 stages·1 gate
流程
基础设施与产业:工作组,自章程起至终止
工作组依记录在固定时限内颁发章程,交付有边界的任务,负责起草和提出建议,若不续期则解散;它不负责采纳。
01 Form
- 01NLC 提议该小组决定 · 国家领导理事会NLC 提议设立工作组,并从其领导人才库中提名主席、编辑与专家。它不负责颁发章程。
- 02依记录的章程决定 · 国家标准理事会工作组依记录颁发章程,时限最长二十四个月。章程规定其范围、角色与决策规则。
- 03成员按能力加入步骤 · 成员专家、从业者、学生与志愿者按能力加入。成员申报利益,并在存在冲突时回避。
02 Work
- 04Workplan from the national agendaStepAssignments come from the national agenda and the year’s missions. Each states the competence it needs and how the work will be reviewed.
- 05草稿与交付物,每月交付记录小组每月交付成果。就标准而言,它们起草国家规范与偏差登记册,并开展国家公众意见征询与试点。
03 审查
- 06贡献记录与审查关口每项贡献都会被记录和审查。工作组负责起草和提出建议,但不负责采纳。
- 07认可以记录为依据记录贡献记录会被保存,使认可以记录为依据。
- 08国家层面的采纳在别处决定决定 · 国家标准理事会国家标准理事会决定采纳方式与国家规范。工作组负责提议,从不作出决定。
04 结束
- 09Dissolved by default, or renewed by recordDecision · National Standards CouncilA group is dissolved by default at the end of the timebox. The National Standards Council renews or closes it, on the NLC’s proposal.
National Working Groups · National Standards Council · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No working group is constituted. The charter rules belong to the proposed Nexus Standards working model.
您将获得、贡献和可期待的内容。
| 问题 | 答案 |
|---|---|
| 您将获得的内容 | 一项依赖关系研究、一份受控测试设计、附有局限说明的各项方案以及一份交接文件 |
| 您的贡献 | An operational question, permitted data under agreed terms and operator time |
| 费用 | Determined in the written terms for each scope, stated with issuer, currency, effective date and scope before any commitment |
| 负责方 | 条款中所指明的 GCRI 机构,GCRI Canada 或 GCRI US |
| 如何退出或提出关切 | 可依据约定条款随时退出;如有关切,请提交至 诚信关切表单 |
GCRI 不做什么。
- GCRI does not operate, inspect or certify infrastructure
- Membership never permits production access, and public previews never reveal restricted topology
- Precompetitive work is designed so that competitors’ confidential information is not exchanged
- 经过测试的方案并不等于授权部署,该决定属于运营方
有关基础设施的融资问题由全球风险联盟(Global Risks Alliance,GRA)在 基础设施准备度下审查。信息与咨询目前已开放:每项咨询都会获得一个参考编号,确认回执会写明下一步。
问题与解答。
我们是否必须共享敏感的运营数据?
成果归谁所有?
是否收取会员费?
如何开始?
法律文件。
本网站上的地图、数据和图表仅作为背景和一般信息展示。它们不是建议、预测或预警;信息的局限见免责声明和数据说明。