Nexus Universe is the annual operating, integration, exercise and learning programme of Nexus Consortiums. The Global Risk Forum (GRF) governs it and publishes it at universe.nexus. The Global Centre for Risk and Innovation (GCRI) runs the technical office: mission scoping, data and method qualification, the Core build, exercise control support and evidence capture. Governance, editions and participation belong to GRF. Part of GCRI programmes.

01Workspace

The working screen for Nexus Universe technical office.

Workstream tracker

Nexus Universe technical… · Programme year 3 · Example interface, not a record

Two milestones at riskGCRI · GCRI

Workstreams

owner · stage · status

Evidence label auditIndependent reviewerTestM3 · week 20At risk
National Model buildIndependent reviewerTestM3 · week 31On track
Annual mission designIndependent reviewerReviewM7 · week 31Blocked
Report edition planningCompetent authorityTestM4 · week 20On track
Methods review cycleNational DeskScopingM6 · week 38On track

Effort against plan

person-weeks

Evidence label audit37 pw of 22 pw requiredNational Model build43 pw of 24 pw requiredAnnual mission design20 pw of 34 pw requiredReport edition…34 pw of 30 pw required

Milestones

  1. W3M1Evidence label audit: scoping note signed
  2. W16M2Inputs qualified at the gate
  3. W25M3National Model build: build review
  4. W29M4Controlled test with observers
  5. W38M5Publication and decision record

GCRI · Workstream trackerWorkstream tracker, in outline: domain structure with placeholder names and illustrative values, not a record.

02Contribution

What the technical office does.

The technical office works through the year, not only in the week of exercises. Its outputs are records that the programme's governance, evaluators and reviewers can inspect.

WorkWhat it produces
Mission scopingA mission scope with objectives, data, methods and evaluation questions
QualificationQualification records for data, methods and contributed resources
Core buildBuild evidence, measured readiness and known defects for the temporary Core
Exercise supportSupport to exercise controllers and independent evaluators
Evidence captureRun, decision and observation records sealed for review
CloseoutA technical closeout and an improvement backlog
03Canvas

Scoping to review.

Canvas · scoping to reviewDesign, not a record
Nexus Universe technical office: the policy cycleA problem reaches the agenda, options are formulated and appraised, consultation tests them, the mandate holder decides, implementation and monitoring follow, and evaluation feeds the next agenda. Design of the process, not a record of a run.

Fig.A programme from scoping to the owner's decision. Design, not a record.

04Who it serves

Mission teams, contributors and hosts.

Missions

Mission teams

Qualified teams bringing a mission admitted at gate G1.

Resources

Contributors

Computing and network contributors with a resource offer. See Network and Core.

Hosts

Hosts

Hosts and venues, whose readiness is evidenced before any event is presented as confirmed.

05Geography

Hazards and exposure worldwide.

Flood water, population density, active fires and true-colour imagery across the world, from NASA GIBS. Each layer carries its own date.

The interactive map needs JavaScript; the layer list and sources are below.

Layers 4

Hazards and exposure, for this page

Latest available

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth

Loading the latest NASA imagery.

Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.

Hazards and exposure, framed on World. Layers as NASA publishes them, each with its own date.Satellite and model products as NASA publishes them, each with its own date; indicators, not assessments of any place; claim ceiling INTEGRATED.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · U.S. Geological Survey · NASA HLS S30Sources and licences

  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • NASA Fire Information for Resource Management System (FIRMS), VIIRS 375 m active fire product, NASA LANCE; vector tiles via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Made with Natural Earth. Free vector and raster map data @ naturalearthdata.com. Public domain
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Context on the globe and flat map: coastlines, boundaries, roads and place names from NASA GIBS reference layers (OpenStreetMap data, ODbL, © OpenStreetMap contributors); Blue Marble imagery as an optional base; 3D terrain and the elevation read-out from the ASTER GDEM elevation colour index (5 m to 200 m classes, exaggerated for legibility). Boundaries are drawn as published and imply no position on any territory.
  • Globe: MapLibre GL JS 6.9.1, BSD-3-Clause, © MapLibre contributors.
  • Live: NASA EONET Events are indicative, not authority warnings.
  • Live: U.S. Geological Survey Events are indicative, not authority warnings.
  • Observed (EO): NASA HLS S30 (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).
  • NASA GIBS: We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).
  • River discharge forecast, 30 days with range (GloFAS via Open-Meteo): Contains modified Copernicus Emergency Management Service information 2026; not a flood warning.
  • Weather data by Open-Meteo.com (https://open-meteo.com/), licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/).
  • Optional layers (11 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Layers and dates

  • Flood water, 3-day composite: VIIRS Global Flood Product, NASA LANCE · 14 Oct 2026
  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Active fires and thermal anomalies, last day: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 Oct 2026
  • Land surface temperature, day, 8-day composite: VIIRS NOAA-20 Level 3, 8-day, NASA LANCE · 14 Sep 2026
  • True colour: VIIRS NOAA-20 corrected reflectance, NASA LANCE · 13 Oct 2026
  • Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024

06Boundaries

Where the technical office stops.

  • GRF governs the programme; the technical office has no governance role.
  • Neither membership nor sponsorship secures a compute allocation, and an offer is not an allocation.
  • The final stage is a planned stand-down; review, reconciliation and corrections continue afterwards.
  • No edition, date or host is shown until its record exists.
07Twin and cascade simulator

Model Nexus Universe technical office as a system. Run the cascade.

Assembled from the Nexus Standards area profile Global and systemic risk: the hazards it names, the systems and sectors that carry the loss, the controls that dampen it and the data that observe it. Choose the components, pick an initiating hazard and step through the cascade. The Map view places the run on an example geography with open data. Every coupling weight is a stated assumption you can change. A teaching model, not a forecast, an assessment or a certification.

Hazards

  • Dam failure
  • Financial contagion
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Mass displacement (set off downstream)
  • Widespread power outage (set off downstream)
  • Water supply shortfall (set off downstream)
  • Sovereign debt crisis (set off downstream)
  • Currency crisis (set off downstream)

Controls

  • NS-0 Constitution and principles
  • NS-3 Risk record UNIs (grammar, legacy crosswalk, allocation authority)
  • NS-9 Contextual UNIs (deployments, instances, programme instances)
  • NS-10 Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
  • NS-11 Verification and monitoring (evidence, attestations, zero-trust conformance observation)
  • NS-14 Conformance and crosswalk to external standards
  • NRS-H120 Hazard family: Structural fragility of interconnected systems (NHS-1 sys.fragility)
  • NRS-C6 Systemic and cascading risk
  • NRS-H61 Hazard family: Cascading failure (NHS-1 sys.cascade)
  • NRS-H62 Hazard family: Compound and multi-hazard events (NHS-1 sys.compound)
  • NRS-H94 Hazard family: Systemic cyber events (NHS-1 cyber.systemic-cyber)
  • NRS-H60 Hazard family: Supply-chain and flow disruption (NHS-1 sys.supply-chain)

Observation

  • INFORM Risk Index (listed for reference)
  • World Bank Open Data and World Development Indicators API (listed for reference)
  • IMF data services (WEO, IFS, FSI via SDMX) (listed for reference)
  • Direct economic loss attributed to disasters in relation to global GDP
  • Macroeconomic Dashboard

Example geography

  • Bangladesh: 134 H3 hexagons at resolution 4
  • Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
  • Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Rain rate, last half hour (IMERG), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
09Questions

Questions and answers.

Who runs Nexus Universe?
GRF governs the programme within its instruments. GCRI provides the technical office, and GRA leads the finance-readiness track.
How does a mission get into Universe?
Missions are scoped during the year and admitted at gate G1 by the annual programme. Technical qualification follows at G2.
Can my organization contribute computing to Universe?
Contributors can make a resource offer with its owner, constraints and availability window. The offer receives a disposition and, if suitable, a qualification record; allocation is a separate approved step.
Is Universe a conference?
No. It is an annual operating, integration, exercise and learning programme, not a single event, trade show or funding platform.
NRNexus Reports gateway · GW-GCRI

Contribute to Nexus Reports from this page.

Nexus Reports is the Consortium's quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRI
The Global Centre for Risk and Innovation

Bring a method, a dataset or a question.

The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

Legal

Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.