- Senegal 2026
- Chapter 5
Urban flood with a water, power and clinic interruption
A conditional statement under stated assumptions, never a prediction.
Contents
- ·Edition home
- ·Executive summary
- 1Senegal’s risk runs through its rivers, its coast and its fuel
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Urban flood with a water, power and clinic interruption
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
5.1Assumptions
Scenario SCN-SEN-FLD-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- a rainfall event over Dakar or Touba that exceeds drainage, with a power interruption of several days
- Analogues
- the 2025 rainy season2425; Senegal River floods of October 20242038
- Interventions
- none modelled; the specification describes the unmitigated case
- Run state
- narrative specification; quantified Foundry run scheduled for Q1 2027
5.2The cascade, step by step
- 1
CLI → INF
heavy rain exceeds drainage; roads and schools are flooded
- 2
INF → ENE
flooded substations and access roads interrupt supply
loss series6
- 3
ENE → WAT
pumping and treatment lose power; unsafe sources are used
service series5
- 4
WAT → HLT
unsafe water and standing water raise exposure to disease
outbreak record22
- 5
INF → FOO
cut roads delay food distribution to affected districts
GIEWS brief20
- 6
ENE → FIN
repair and relief costs fall on the budget
fiscal series12
5.3The scenario as a table of steps
How the shock in scenario SCN-SEN-FLD-01 would travel through Senegal’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 Climate to infrastructure | Heavy rain exceeds drainage; roads and schools are flooded. Analogue or source: 2025 evidence [24] [25]. | Edition SEN, scenario SCN-SEN-FLD-01, step 1 |
| 02 Infrastructure to energy | Flooded substations and access roads interrupt supply. Analogue or source: loss series [6]. | Edition SEN, scenario SCN-SEN-FLD-01, step 2 |
| 03 Energy to water | Pumping and treatment lose power; unsafe sources are used. Analogue or source: service series [5]. | Edition SEN, scenario SCN-SEN-FLD-01, step 3 |
| 04 Water to health | Unsafe water and standing water raise exposure to disease. Analogue or source: outbreak record [22]. | Edition SEN, scenario SCN-SEN-FLD-01, step 4 |
| 05 Infrastructure to food | Cut roads delay food distribution to affected districts. Analogue or source: GIEWS brief [20]. | Edition SEN, scenario SCN-SEN-FLD-01, step 5 |
| 06 Energy to finance | Repair and relief costs fall on the budget. Analogue or source: fiscal series [12]. | Edition SEN, scenario SCN-SEN-FLD-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Senegal 2026, scenario SCN-SEN-FLD-01 (2026); Senegal 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 24Ministry of Hydraulics and Sanitation (ed.), national evaluation workshop on the 2025 rainy season, 16 December 2025, as reported by allAfrica, “Inondations: plus de 10 millions de m³ d’eau pompés en 2025” (observation year 2025). Press report, accessed 2026-11-03.back
- 25Sud Quotidien (ed.), report on the 2025 rainy-season evaluation, 17 December 2025, distributed by allAfrica (observation year 2025). Press report, accessed 2026-11-03.back
- 20Food and Agriculture Organization (ed.), GIEWS Country Brief: The Republic of Senegal, reference date 3 December 2024 (observation year 2024). FAO, Rome. Latest version served at access, 2026-11-03.back
- 38UNVERIFIED, not opened: Agence de Presse Africaine (ed.), report of 55,600 people affected by the October 2024 Senegal River floods, citing the government. APA News, 2024. Search-result snippet only; the page was not opened.back
- 6World Bank (ed.), World Development Indicators: access to electricity, electric power consumption and transmission losses, Senegal (observation years 2022–2024). World Bank, Washington DC. Accessed 2026-11-03.back
- 5World Bank (ed.), World Development Indicators: drinking-water, sanitation and freshwater series, Senegal (observation years 2022–2024), drawn from the WHO and UNICEF Joint Monitoring Programme and FAO. World Bank, Washington DC. Accessed 2026-11-03.back
- 22World Health Organization (ed.), “Rift Valley fever: Mauritania and Senegal,” Disease Outbreak News 2025-DON584, 5 November 2025 (observation period 20 September to 30 October 2025). WHO, Geneva. Accessed 2026-11-03.back
- 12International Monetary Fund (ed.), “IMF Staff Concludes Visit to Senegal,” Press Release No. 26/216, 22 June 2026 (observation year 2025). IMF, Washington DC. Accessed 2026-11-03.back