- Senegal 2026
- Chapter 7
The 2027 agenda
Eight bounded questions open the 2027 National Agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due at the Q1 2027 cut.
Contents
- ·Edition home
- ·Executive summary
- 1Senegal’s risk runs through its rivers, its coast and its fuel
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Urban flood with a water, power and clinic interruption
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- A-01
How would a heavy-rain flood in Dakar or Touba interrupt water, power and health services, and how long would recovery take?
INI-SEN-SYS-01 · urban flood continuity; first output: dependency graph for two cities.
- A-02
Where are people without safely managed water and sanitation, and which regions carry the gap?
INI-SEN-WAT-02 · safely managed services gap; first output: regional gap table.
- A-03
How will oil and gas output and domestic gas reshape the power system, emissions and the budget?
INI-SEN-ENE-03 · gas-to-power and emissions; first output: power-mix and emissions table.
- A-04
How exposed are cereal and rice supply to rainfall, price and import shocks?
INI-SEN-FOO-04 · food supply exposure; first output: commodity dependence table.
- A-05
How do Senegal River floods, Rift Valley fever and irrigated rice link as one health risk?
INI-SEN-HLT-05 · river valley one health; first output: case-and-flood timeline.
- A-06
How fast is the coast eroding at Saint-Louis and the Petite Côte, and who is exposed?
INI-SEN-CLI-06 · workstream; first output: coastal exposure note.
- A-07
What is the condition of mangroves and forests, and how is it changing?
To be admitted in Q1 2027; first output: scoping note against national forest records.
- A-08
Which capabilities have been tested in real events, and which are only planned?
National capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for admission at the Q1 2027 alignment. They are programme objects, no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-SEN-SYS-01 | Urban flood continuity | Initiative | A-01 | PROPOSED |
| INI-SEN-WAT-02 | Safely managed services gap | Initiative | A-02 | PROPOSED |
| INI-SEN-ENE-03 | Gas-to-power and emissions | Initiative | A-03 | PROPOSED |
| INI-SEN-FOO-04 | Food supply exposure | Initiative | A-04 | PROPOSED |
| INI-SEN-HLT-05 | River valley one health | Initiative | A-05 | PROPOSED |
| PRJ-SEN-SYS-01a | Two-city flood dependency graph (Dakar and Touba) | Project | A-01 | PROPOSED |
| MSN-SEN-2027-01 | Urban flood and river valley Universe mission | Mission | A-01 | Candidate |
7.3The pathway
Senegal is the national pathway through which the Nexus operating system will run in Senegal from 2027. At baseline the pathway is designed and its records are prepared; its councils and working groups are constituted from Q1 2027. This page states what exists today and what comes next, nothing more.
- 01
One National Agenda
bounded national questions for the year
DRAFT 2027 · agenda review at the Q1 alignment
- 02
National Desk
coordination, records, routing and continuity
DESIGNED · constituted in Q1 2027
- 03
National Model
the country as a system of systems
v0 SPECIFIED · v1 with the first Foundry cut
- 04
National Portfolio
risks, capabilities, initiatives, projects, missions
7 PROPOSED · admission at the Q1 alignment
- 05
Foundry
continuous computational environment
PREPARED · first sealed cut NQ-SEN-2027-Q1
- 06
quarterly and annual publication
BASELINE ISSUED · Q1 2027 · State & Agenda
- 07
Universe
annual proving environment
CANDIDATE MISSION · mandate set in 2027
- 08
Evidence and correction
after-action, correction and renewal
OPEN · first correction cycle in Q2 2027
7.4Universe 2027, evidence pack for the candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | Q4 2027 annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-SEN-2027-01 · Urban flood and river valley Universe mission
- Role spine
- Leadership sponsor (NLC) · Institutional anchor (NNC) · Mission lead (NWG)
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| CLI-001 · emissions | public record | reference for the 2027 series | PUBLIC |
| ENE-003 · electricity access | INI-SEN-ENE-03 | gas-to-power and emissions | PUBLIC |
| WAT-005 · safely managed water | INI-SEN-WAT-02 | services gap | PUBLIC |
| WAT-006 · water pressure | INI-SEN-WAT-02 | withdrawal path | PUBLIC |
| FOO-007 · food | INI-SEN-FOO-04 | food supply exposure | PUBLIC |
| CLI-011 · floods | INI-SEN-SYS-01 · key F review | urban flood continuity | PUBLIC |
| HLT-008 · health | INI-SEN-HLT-05 | river valley one health | PUBLIC |
| SYS-012 · compound pathway | MSN-SEN-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the national pathway | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Rainfall and weather warnings | ANACIM, national meteorological agency | real time | CLI findings |
| Senegal River levels and releases | OMVS and the Ministry of Hydraulics and Sanitation50 | daily in season | RSK-SEN-CLI-001 |
| Cadre Harmonisé analyses | CILSS, AGRHYMET and national bodies | twice a year | FOO-007 |
| Crop monitoring brief | FAO GIEWS | periodic | FOO-007 |
| Oil and gas production reports | Ministry of Energy, Petroleum and Mines | monthly | ENE-004 |
| Disease outbreak notices | WHO and the Ministry of Health | per event | HLT-008 |
| Population and poverty statistics | ANSD | per release | profile |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- quarterly publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-SEN-001 | Rift Valley fever deaths in the river valley22 | CORROBORATED | HLT · CLI | research question A-05 |
| SIG-SEN-002 | Oil output of 36.1 million barrels in 202526 | CORROBORATED | ENE · FIN | initiative A-03 |
| SIG-SEN-003 | Floods with ministry tolls in 2024 and 20252425 | CORROBORATED | CLI · INF | research question A-01 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 50UNVERIFIED, not opened: Organisation pour la mise en valeur du fleuve Sénégal (OMVS), Manantali and Diama dams and the Senegal River basin. OMVS, Dakar. Cited from search-result descriptions only; no figure is taken from it.back
- 22World Health Organization (ed.), “Rift Valley fever: Mauritania and Senegal,” Disease Outbreak News 2025-DON584, 5 November 2025 (observation period 20 September to 30 October 2025). WHO, Geneva. Accessed 2026-11-03.back
- 26Africanews (ed.), “Senegal’s 2025 oil output exceeds predictions to reach 36.1 million barrels,” 8 January 2026, reporting the Ministry of Energy, Oil and Mines (observation year 2025). Press report, accessed 2026-11-03.back
- 24Ministry of Hydraulics and Sanitation (ed.), national evaluation workshop on the 2025 rainy season, 16 December 2025, as reported by allAfrica, “Inondations: plus de 10 millions de m³ d’eau pompés en 2025” (observation year 2025). Press report, accessed 2026-11-03.back
- 25Sud Quotidien (ed.), report on the 2025 rainy-season evaluation, 17 December 2025, distributed by allAfrica (observation year 2025). Press report, accessed 2026-11-03.back
