Skip to content

GCRI · 信任与问责

独立性与利益冲突

全球风险与创新中心(Global Centre for Risk and Innovation,GCRI)的价值取决于其中立性。资助方、赞助方、成员、东道方和技术提供方都有所贡献,但没有任何一方可以购买某项结论、排名、任命、同意、采购优势或隐蔽的限制。下文说明如何管理赞助方中立性、提供方独立性和角色冲突。本页属于 信任与问责.

02三项规则

Neutral by design.

这些规则适用于各种形式的支持,无论是资金、数据、基础设施、托管还是专业知识。

赞助方

支持换不来任何回报

任何支持都不能买到研究结论、排名、任命、同意、采购优势或对局限性的隐瞒。

披露

披露资金来源

每份出版物都会披露资金来源和评审情况,赞助方对检验结果没有任何发言权。

冲突

已声明的利益

评审人和负责人申报其利益。已申报利益冲突的评审人不签署与之相关的接受决定。

03提供方独立性

技术提供方以证据竞争。

  1. 01

    依据书面标准遴选

    Testbed participants are selected through documented decisions, not by level of contribution.

  2. 02

    No exclusivity by default

    Contributing technology or capacity does not make a provider the programme’s supplier.

  3. 03

    测试不等于背书

    测试结果只说明被测对象的情况,不等同于认可、认证或购买建议。

  4. 04

    竞争保障措施

    Precompetitive work is designed so that competitors’ confidential information is not exchanged.

04流程

流程如何运行。

Process explorer · Process

更正如何推进

12 steps5 stages

流程

更正如何推进

任何人无需成为成员即可要求更正;被接受的更正成为新版本,较早的版本连同理由保留在记录中。

  1. 01 报告人

    1. 01任何人都可以要求更正行动方 · 任何人任何人都可以要求更正,无需成为成员。报告危害或更正公共信息不需要成员资格或账户。
  2. 02 分派与确认

    1. 02按关切类型分派步骤科学更正或诚信关切提交给责任编辑或来源所有者。
    2. 03确认回执记录任何提出问题、分享地方知识或报告关切的人都会收到确认回执与问题处置结果。
  3. 03 审查

    1. 04由编辑或来源所有者审查步骤 · 责任编辑或来源所有者已申报利益冲突的审查人绝不签署相关的接受文件。
    2. 05对决定的投诉步骤 · 不对该决定负责的审查人计划或决策投诉由不对所争议决定负责的人员审查。
    3. 06隐私、安全与保护队列步骤隐私与权利请求提交至隐私官队列,安全报告提交至安全披露队列。
  4. 04 结果

    1. 07被接受的更正成为新版本记录被接受的更正会创建一个新的记录版本。
    2. 08已记录问题处置记录报告人会获得问题处置结果,并在适当情况下获得救济或转介。文件未规定被驳回更正的申诉途径。
  5. 05 纳入记录

    1. 09受影响的分析已使用更正后的输入重新运行步骤 · Foundry 支柱受影响的分析使用更正后的输入重新运行。
    2. 10Change proposal to the standardsRecord · Nexus StandardsMethod and correction findings go to Nexus Standards as change proposals (F06). It records the correction as a change to the evidence.
    3. 11已更新讲授该发现的课程步骤 · Risk AcademyRisk Academy 会更新讲授过被更正发现的任何课程。
    4. 12附更正及理由的新版本记录 · 报告Reports 发布附带更正及其理由的新版本。较早的版本连同更正历史保留在记录中。

Status and service levels · Reports · The programme yearDesigned process, not a record of any case: no cycle has run and every programme is at service level R0, information and enquiries. A gate is a programme decision, never a public-authority approval, a certification or a deployment authorisation. The competent authority decides.

05角色冲突

When one person or organisation holds more than one role.

One person may be a researcher, a reviewer and a council member at different times. Where roles meet on the same matter, the conflict is declared and the person steps back. Institutional influence cannot decide a scientific conclusion. Review practice is under scientific and editorial integrity and research integrity.

The Global Risks Alliance (GRA) publishes its own rules at GRA conflicts, sponsors and neutrality.

06问题

问题与解答。

资助方可以在发布前审阅报告吗?
A sponsor may be asked to check factual statements about itself. It cannot approve, change or delay a finding, and any such check is disclosed.
贡献更多是否意味着影响力更大?
否。出资水平不影响调查结果、评估对象的遴选、任命或受限数据的访问权限。
如何处理 GCRI 工作人员的利益冲突?
Staff declare relevant interests. A declared conflict on a matter means stepping back from decisions on it, and the record shows who decided.
如何报告可疑的利益冲突?
发送至 诚信关切表单 提交相关事项及您可提供的事实。确认回执会给出一个编号,该关切将由未参与此事的人员审查。
Do GCRI’s statuses and memberships create conflicts?
它们以确切措辞公开声明,仅属于 GCRI。不延及 GRF、GRA 或参与机构,也不表示所列机构对联合体项目的背书。
全球风险与创新中心(The Global Centre for Risk and Innovation)

带来一种方法、一个数据集或一个问题。

信息和咨询现已开放。每项咨询都会获得一个编号,并告知下一步;申请、付款、算力分配和注册只有在相应团队、条款和审查能力就绪时才会开放。