Skip to content

GCRI · 信任与问责

科学与编辑诚信

Everything The Global Centre for Risk and Innovation (GCRI) publishes is reviewed on method, labelled by evidence type, open to criticism and corrected in the open. The standards for GCRI pages, papers and reports are below: review, method disclosure, criticism and corrections. Institutional influence cannot decide a scientific conclusion. Part of trust and accountability.

02标准

所有发布内容适用四项标准。

The standards apply equally to a web page, a technical paper and a flagship report.

审核

Accepted on method

具备资质、利益冲突已得到管理的审查人员和出版方,依据方法而非资助方或托管方来接受工作成果。

方法

已披露且可核查

每项发现均链接到其来源、方法和审查,并说明其不确定性。

Criticism

已欢迎并已记录

异议和不利发现均予保留,被驳回的建议将获得说明理由的处理决定。

03证据标签

每项结果都会说明其证据类型。

  • 观测
  • 已发布统计
  • Institution-reported
  • 估计值
  • 模型生成
  • 预报
  • 情景
  • 专家判断
  • 未知

Published statistics names a source type, not an endorsement. Missing data is shown as missing, never as zero.

04流程

流程如何运行。

Process explorer · Process

更正如何推进

12 steps5 stages

流程

更正如何推进

任何人无需成为成员即可要求更正;被接受的更正成为新版本,较早的版本连同理由保留在记录中。

  1. 01 报告人

    1. 01任何人都可以要求更正行动方 · 任何人任何人都可以要求更正,无需成为成员。报告危害或更正公共信息不需要成员资格或账户。
  2. 02 分派与确认

    1. 02按关切类型分派步骤科学更正或诚信关切提交给责任编辑或来源所有者。
    2. 03确认回执记录任何提出问题、分享地方知识或报告关切的人都会收到确认回执与问题处置结果。
  3. 03 审查

    1. 04由编辑或来源所有者审查步骤 · 责任编辑或来源所有者已申报利益冲突的审查人绝不签署相关的接受文件。
    2. 05对决定的投诉步骤 · 不对该决定负责的审查人计划或决策投诉由不对所争议决定负责的人员审查。
    3. 06隐私、安全与保护队列步骤隐私与权利请求提交至隐私官队列,安全报告提交至安全披露队列。
  4. 04 结果

    1. 07被接受的更正成为新版本记录被接受的更正会创建一个新的记录版本。
    2. 08已记录问题处置记录报告人会获得问题处置结果,并在适当情况下获得救济或转介。文件未规定被驳回更正的申诉途径。
  5. 05 纳入记录

    1. 09受影响的分析已使用更正后的输入重新运行步骤 · Foundry 支柱受影响的分析使用更正后的输入重新运行。
    2. 10Change proposal to the standardsRecord · Nexus StandardsMethod and correction findings go to Nexus Standards as change proposals (F06). It records the correction as a change to the evidence.
    3. 11已更新讲授该发现的课程步骤 · Risk AcademyRisk Academy 会更新讲授过被更正发现的任何课程。
    4. 12附更正及理由的新版本记录 · 报告Reports 发布附带更正及其理由的新版本。较早的版本连同更正历史保留在记录中。

Status and service levels · Reports · The programme yearDesigned process, not a record of any case: no cycle has run and every programme is at service level R0, information and enquiries. A gate is a programme decision, never a public-authority approval, a certification or a deployment authorisation. The competent authority decides.

05编辑规则

GCRI 页面会说明和不会说明的内容。

  1. 01

    通俗说明现状

    Present tense only for what operates now; planned services are described as designed, as recorded in the claims and readiness register.

  2. 02

    没有未记录的主张

    没有记录,就没有合作伙伴、成员、办事处、数量、费用或结果。

  3. 03

    No superlatives

    No rankings of institutions, no prestige lists and no promotional language.

  4. 04

    Release follows review

    不是宣传性截止日期。计划中的报告绝不会显示为已发布。

07问题

问题与解答。

Who is the publisher of a GCRI page?
由 GCRI 通过页面上所标明的机构发布,即 GCRI Canada 或 GCRI US。专业平台会标明其法定发布方。
Can a reviewer block publication?
Reviewers can find that work does not meet the standard. The publisher then decides with the record of review, and disagreements are preserved.
How are AI-generated drafts handled?
A draft prepared with AI tools is not reviewed work. It is checked by qualified people before publication, and authors and editors remain responsible.
我如何对 GCRI 的出版物提出批评?
发送至 诚信关切表单提交。实质性批评将被审查并记录,被接受的意见将带来更正或公开回应。
GCRI 的页面是否使用宣传性语言?
No. Pages avoid superlatives, prestige lists and claims without records. If you find one, report it to the integrity address and it will be corrected.
全球风险与创新中心(The Global Centre for Risk and Innovation)

带来一种方法、一个数据集或一个问题。

信息和咨询现已开放。每项咨询都会获得一个编号,并告知下一步;申请、付款、算力分配和注册只有在相应团队、条款和审查能力就绪时才会开放。