- United Arab Emirates 2026
- Annex A
Methodology
How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.
Contents
- ·Edition home
- ·Executive summary
- 1The United Arab Emirates’ risk is heat, water and supply at once
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Humid summer heat peak with grid and desalination stress
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
A.1Methods
The baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.
| No. | Derivation | Calculation | Result |
|---|---|---|---|
| (1) | Fall in the gas share of generation, 2019 to 2025 | 97.357 − 68.039 | ≈ 29.3 points |
| (2) | Growth in total generation, 2019 to 2025 | 184.411 ÷ 138.454 − 1 | ≈ 33.2% |
| (3) | Gap between the 2022 net inventory and the 2035 aim | 195.185 − 103.5 | ≈ 91.7 Mt |
| (4) | Growth in residents, 2023 to 2024 | 11,294,243 ÷ 10,678,556 − 1 | ≈ 5.8% |
| Strength | Definition |
|---|---|
| STRONG | a disruption in the source system has historically changed the target system’s service or output within one season |
| MODERATE | an effect is documented but buffered or slower |
| WEAK | an effect is plausible but not documented at national scale |
| Label | Rule |
|---|---|
| Reported | value as issued by its source, with year |
| Inferred | reasoned from cited evidence; never a measurement |
| Estimated | Nexus analytical value with stated method |
| Scenario | conditional on stated assumptions |
| Expert input | structured editorial judgement awaiting evidence |
A.2Model card, National Model v0
- Model ID
- MDL-ARE-NATIONAL · v0.1
- Purpose
- represent the United Arab Emirates as coupled water, energy, food, health and biodiversity systems with forcing and transmission layers
- Family
- graph-based system of systems
- Inputs
- the cited sources of this edition; no proprietary data
- Method
- expert-specified coupling strengths (STRONG · MODERATE · WEAK) from evidence and analogue events
- Validation
- none yet, first validation against Q1 2027 Foundry evidence
- Uncertainty
- qualitative; strengths are hypotheses, not measurements
- Domain of validity
- national scale; not for emirate or asset-level use
- Reproducibility
- strength table and sources published in this edition
typed in v0
documented within one season
documented, buffered
plausible, undocumented
A.3The baseline evidence cut
Every Nexus edition is published from a frozen evidence cut. The baseline cut is documentary: it pins the exact edition of every source cited. Model runs begin with the first Foundry cut in Q1 2027.
- Cut ID
- NQ-ARE-2026-Q0-1
- Type
- baseline documentary cut
- Resolution policy
- pinned · as of 30 September 2026
- Sources pinned
- 46 cited sources, each at the edition and retrieval date in the references
- Model runs
- none at baseline, analytical values are stated with their method
- Digest
- computed at freeze and recorded in the publication record
- Supersedes
- nothing, first cut of the series
- Superseded by
- NQ-ARE-2027-Q1-1 at the Q1 2027 close
Lineage
- 01
source edition
- 02
pinned citation
- 03
finding
- 04
page
- 05
publication record
| Element | Baseline 2026 | Q1 2027 |
|---|---|---|
| Sources | cited publications, pinned by edition | qualified source bindings with versions |
| Analysis | stated methods and editorial estimates | typed analysis specifications |
| Models | National Model v0 specification | model runs with receipts |
| Findings | twelve baseline findings | findings re-bound to the cut |
| Review | five passes scheduled | five passes on the exact digest |
A.4Evidence age and coverage
A 2026 edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.
| Indicator | Observed | Released | Cadence | Next release |
|---|---|---|---|---|
| GHG emissions | 2022 | Nov 2025 | biennial | second report |
| Population | 2024 | not stated | annual | annual |
| Electricity mix | 2025 | Apr 2026 | annual | annual |
| Renewable capacity | 2025 | 2026 via press | annual | 2027 |
| Groundwater policy | 2022 | Dec 2022 | policy | not scheduled |
| Economic outlook | 2025–2026 | Dec 2025 | annual | 2026 consultation |
| Extreme rain | 2024 | Apr 2024 | per event | per event |
| Heat reading | 2025 | Jun 2025 via press | per event | per event |
| Protected areas | 2025 | 2025 | periodic | periodic |
| System | Coverage | Thinnest dimension |
|---|---|---|
| Climate forcing | PARTIAL | annual anomaly; heat-illness link |
| Energy | GOOD | fuel burned for power and desalination |
| Water | PARTIAL | desalination share and capacity in use |
| Food | THIN | import share by commodity; reserves |
| Health | THIN | heat deaths and illness series |
| Biodiversity | THIN | condition outside reserves |
| Finance | PARTIAL | insurance cover |
| Digital | THIN | dependency mapping |
A.5Evidence cards, two anchor sources
Issued by the Ministry of Climate Change and Environment to the UNFCCC, November 2024. Periodic. Role: binds the 2035 aim, the 2019 base of 196.3 Mt, the sector pathways and several water and capacity statements, each as a national statement.
EVD-ARE-001
Third NDC1
Issued by Ember. Annual. Role: binds the 2019–2025 generation mix by source. The data file was read from the issuer’s public release, not through a press report.
EVD-ARE-002
Ember yearly electricity data17
| Dimension | EVD-ARE-001 | EVD-ARE-002 |
|---|---|---|
| Completeness | economy-wide, all domestic sectors | national, by source |
| Timeliness | submitted November 2024 | 2025 data released in 2026 |
| Revision | periodic; the 2019 base moved from 225 to 196.3 Mt2 | annual back-revision |
| Method transparency | inventory method described; report text and tables differ in places3 | method published by the issuer |
| External validation | independent assessment exists30 | not bound |
Evidence cards to follow in Q1 2027
A.6Publication acceptance record
Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.
| Group | Area | Items | Pass | N/A | Pending |
|---|---|---|---|---|---|
| D1 | Identity and scope | 8 | 8 | 0 | 0 |
| D2 | Source and data | 12 | 9 | 1 | 2 |
| D3 | Analysis and models | 12 | 3 | 8 | 1 |
| D4 | Findings and claims | 9 | 8 | 0 | 1 |
| D5 | Figures, tables, maps | 10 | 6 | 2 | 2 |
| D6 | Editorial and citations | 10 | 8 | 0 | 2 |
| D7 | Review and approval | 13 | 0 | 0 | 13 |
| D8 | Artefact and design | 12 | 7 | 0 | 5 |
| D9 | Registry and release | 9 | 0 | 0 | 9 |
Publication gate
- Conditions met
- 14 of 23 at evidence close
- Blocking problems
- none recorded
- Open conditions
- reviews, approval of the exact digest, deposit, registry pointer
Not applicable at baseline
- Model runs
- first runs in Q1 2027
- Maps
- plates in Q2 2027
- Waivers
- none
A.7Status words
| Status | What it means |
|---|---|
| Observed | Measured directly and published by the source. |
| Reported | Published statistics of an official or institutional source. |
| Declared | Stated by the body concerned; not independently measured. |
| Estimated | A Nexus estimate from cited evidence, with its method in Annex A. |
| Modelled | Produced by a stated model from cited inputs. |
| Inferred | Reasoned from cited evidence; not measured. |
| Forecast | A projection by the cited source. |
| Simulated | A simulation result under stated assumptions. |
| Scenario | A conditional statement under stated assumptions; never a prediction. |
| Expert input | Expert judgement, recorded with its basis. |
| Candidate | Proposed for a later edition; not yet evidence. |
| Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject. | |
A.8How the edition is made, released and corrected
Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.
| Step | What happens | Source |
|---|---|---|
| 01 Evidence arrives from the pillars | Foundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s. | |
| 02 The cut is sealed | On the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on. | |
| 03 The edition is assembled | The edition is drafted from its template and content pack. Agents may draft; they never publish and never decide. | |
| 04 The keys turn | At the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward. | |
| 05 The gate opens | A named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit. | |
| 06 Signed and deposited | The PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI. | |
| 07 Published on its desk’s site | Only then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part. | |
| 08 Corrections go to Standards | Method and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut. |
A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).
Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.
A.9Glossary and abbreviations
| Term | Meaning |
|---|---|
| Baseline Edition | the inaugural annual edition that fixes the reference state for the series |
| WEFH+B | water, energy, food, health and biodiversity, the national nexus core |
| Coupling | a typed dependency through which one system transmits to another |
| Protection gap | the share of losses not covered by insurance |
| Capability ladder | LISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED |
| EQL | evidence-quality level, 1–5 |
| Evidence cut | a frozen resolution of exact sources and versions |
| NNC · NLC · NWG | National Nexus Consortium · National Leadership Council · National Working Groups |
| Abbreviation | Expansion |
|---|---|
| BTR | Biennial Transparency Report |
| DEWA | Dubai Electricity and Water Authority |
| EAD | Environment Agency Abu Dhabi |
| FAO | Food and Agriculture Organization of the United Nations |
| FCSC | Federal Competitiveness and Statistics Centre |
| IMF | International Monetary Fund |
| IRENA | International Renewable Energy Agency |
| LULUCF | land use, land-use change and forestry |
| MOCCAE | Ministry of Climate Change and Environment |
| MoHRE | Ministry of Human Resources and Emiratisation |
| NCEMA | National Emergency Crisis and Disaster Management Authority |
| NCM | National Centre of Meteorology |
| NDC | nationally determined contribution |
| WDPA | World Database on Protected Areas |
A.10Technical annex
| Item | Annex | Contents | Status |
|---|---|---|---|
| A.1 | Indicator definitions | the baseline indicator set, with units and sources | IN THIS EDITION |
| A.2 | Coupling strengths | the twenty-cell matrix and its rationale | IN THIS EDITION |
| A.3 | Scenario specification | SCN-ARE-HTW-01 assumptions and signposts | IN THIS EDITION |
| A.4 | Capability placements | rung evidence for fifteen functions | IN THIS EDITION |
| A.5 | Model diagnostics | first runs and validation | Q1 2027 |
| A.6 | Sensitivity analyses | influence of coupling strengths | Q2 2027 |
| A.7 | Emirate notes | atlas cards for every emirate | Q2 2027 |
| A.8 | Review statements | pass-by-pass review record | AT RELEASE |
A.1 · indicator definition, gas share of electricity generation
- Construct
- gas-fired generation divided by total electricity generation
- Unit
- per cent
- Scope
- calendar year, national, including net imports
- Source
- Ember yearly electricity data17
- Revision
- annual back-revision by the data issuer
- Known limits
- Ember’s country page rounds differently from the dataset18; 2026 not bound
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1Ministry of Climate Change and Environment (ed.), The United Arab Emirates’ Third Nationally Determined Contribution (NDC 3.0): Accelerating Action Towards Mission 1.5C. Submission to the UNFCCC, Abu Dhabi, November 2024. Observation years 2019–2035. https://unfccc.int/sites/default/files/2024-11/UAE-NDC3.0.pdf, accessed 2026-11-03.back
- 17Ember (ed.), Yearly electricity data: generation by country and source (release_generation_yearly_global), United Arab Emirates 2019–2025. Ember, London, 2026. Observation year 2025. https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv, accessed 2026-11-03.back
- 2Ministry of Climate Change and Environment (ed.), Third Update of Second Nationally Determined Contribution for the UAE. Submission to the UNFCCC, Abu Dhabi, 2023. Observation years 2019–2030. https://unfccc.int/sites/default/files/NDC/2023-07/Third%20Update%20of%20Second%20NDC%20for%20the%20UAE_v15.pdf, accessed 2026-11-03.back
- 3Ministry of Climate Change and Environment (ed.), United Arab Emirates’ First Biennial Transparency Report 2024. Submission to the UNFCCC, Abu Dhabi, submitted 6 November 2025. Observation years 2019–2022. https://unfccc.int/sites/default/files/resource/UAE’s%20First%20BTR%20-%20Submission%20Document.pdf, accessed 2026-11-03. The text (195,065 Gg) and Table 1 (195,185 Gg) differ for 2022; Table 1 is used.back
- 30Climate Action Tracker (ed.), UAE: country assessment, assessment dated 15 November 2024. Climate Analytics and NewClimate Institute, Berlin, 2024. Observation year 2024. The page rates the 2030 target of the 2023 update; a separate 2035 analysis is not read. https://climateactiontracker.org/countries/uae/, accessed 2026-11-03.back
- 10DATA VINTAGE AFTER CLOSE: World Bank (ed.), World Development Indicators: ER.H2O.INTR.PC, ER.H2O.INTR.K3, ER.H2O.FWTL.ZS, ER.H2O.FWAG.ZS, ER.H2O.FWDM.ZS and ER.H2O.FWIN.ZS for the United Arab Emirates, from FAO AQUASTAT. World Bank, Washington DC, database updated 8 October 2026. Observation year 2022. https://api.worldbank.org/v2/country/ARE/indicator/ER.H2O.INTR.PC, accessed 2026-11-03.back
- 5International Monetary Fund (ed.), United Arab Emirates: 2025 Article IV Consultation, Press Release, Staff Report and Statement by the Executive Director, IMF Country Report No. 25/327. IMF, Washington DC, December 2025. Observation years 2024–2026. https://www.imf.org/-/media/files/publications/cr/2025/english/1areea2025001-source-pdf.pdf, accessed 2026-11-03.back
- 18Ember (ed.), United Arab Emirates: country page (32% low-carbon, 68% fossil), last updated 22 April 2026. Ember, London, 2026. Observation year not stated on the page. https://ember-energy.org/countries-and-regions/united-arab-emirates/, accessed 2026-11-03.back
