HPC is power, cooling and policy before it is speed
Part I describes systems and their couplings. It ranks no country or operator and assesses no authority.
Contents
- ·Edition home
- ·Executive summary
- 1HPC is power, cooling and policy before it is speed
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Power and siting limits meet fast-growing demand
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
1.1The questions this part answers
Key questions
- Where is HPC risk concentrated?
- Which couplings carry HPC shocks into other systems?
- Which HPC capabilities hold under compound stress?
- What must 2027 evidence measure first?
In this part
- Narrative
- Headline finding
- Lead figure
- Five footprint and governance chapters
- Twelve-domain reading
- Sector screens
- Dependency matrix
- Risk objects
- Capability ladder
- Scenario
- Three lenses
- Portfolio
1.2The argument
High-performance computing is usually discussed as a speed race. The 2026 evidence reads it as infrastructure: millions of cores and accelerators that draw tens of megawatts, sit in purpose-built halls and depend on chips, funding and export rules1913.
The system evidence is strong. LineShine reached 2.198 exaflops on Linpack at about 42.2 megawatts, and four other systems reached one exaflop or more14. The combined list rose to 18.73 exaflops, and 276 of 500 systems use accelerators5. Lists show submitted systems only.
Efficiency and demand tell a different story. The Green500 leader is a 46 kilowatt system at 73.282 gigaflops per watt, and El Capitan reached 60.9435. Outside the lists, US data centres used 4.4% of national electricity in 2023 and a 2028 range of 6.7% to 12% is reported12.
The policy base is moving. BIS extended a timeline to the end of 2026 and issued guidance in May 202613. EuroHPC reports a budget of at least EUR 8.2 billion for 2021 to 202711. Cooling water, chip supply and workforce are the least measured parts.
Mixed-precision results are several times larger than Linpack results for the same machines. El Capitan reached 16.7 exaflops against 1.809 on Linpack. The two benchmarks measure different work, and the table is not a measure of useful output45.
| Item | Bar, scaled to the largest value | Value |
|---|---|---|
| El Capitan | 16.7 | |
| Aurora | 11.6 | |
| Frontier | 11.4 | |
| LineShine | 7.92 | |
| JUPITER Booster | 7.92 |
Source: as cited in the note to this figure. Year 2026.
Figure ID FIG-XTECH-HPC-GLOBAL-2026-BASELINE-01-003
1.3Twenty couplings between five systems
The HPC-centred matrix types the twenty couplings between the five core systems, read for their HPC content. Strengths are Nexus estimates (ESTIMATED) from the cited evidence and analogue events; they set the graph that 2027 evidence will test.
Each line is one coupling from one system to another, drawn by the strength the edition assigns. Strengths are Nexus estimates from the cited evidence and analogue events.
- Strong
- Moderate
- Weak
Source: this edition’s coupling matrix (Table 1.1); status Estimated.
| From, to | WAT | ENE | FOO | HLT | BIO |
|---|---|---|---|---|---|
| WAT Water | · | WEAK facility cooling | WEAK no documented link | WEAK no documented link | WEAK no documented link |
| ENE Energy | WEAK cooling load, not bound | · | WEAK no documented link | WEAK no documented link | WEAK no documented link |
| FOO Food | WEAK no documented link | WEAK no documented link | · | WEAK no documented link | WEAK no documented link |
| HLT Health | WEAK no documented link | WEAK no documented link | WEAK no documented link | · | WEAK no documented link |
| BIO Biodiversity | WEAK no documented link | WEAK no documented link | WEAK no documented link | WEAK no documented link | · |
| Strength: strong, moderate or weak; a Nexus estimate (status Estimated) from cited evidence and analogue events. The scale is defined in Annex A. | |||||
Transmission paths
- 01
ENE → INF
Facility power and cooling limit siting and scale.
Reported power of the five largest systems1
- 02
TRD → INF
Licence rules shape access to advanced computing items.
Reported BIS timeline and guidance13
- 03
FIN → INF
Public programmes fund systems and software.
- 04
INF → ENE
Accelerated systems add load to data centres.
- 05
GOV → ENE
Reporting rules make facility energy visible.
Inferred EU delegated regulation34
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: European Commission, Commission Delegated Regulation (EU) 2024/1364 of 14 March 2024 on the first phase of the establishment of a common Union rating scheme for data centres (500 kW threshold, annual reporting by 15 May), taken from law firm summaries; EUR-Lex returned no content. Observation year 2024. Accessed 2026-11-03.back