Data appendix
The indicator set with its sources, the source registers, the licences of every kind of material and the formats of the edition.
Contents
- ·Edition home
- ·Executive summary
- 1HPC is power, cooling and policy before it is speed
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Power and siting limits meet fast-growing demand
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
B.1The indicator set
| Indicator | Value | Unit | Year | State | Source |
|---|---|---|---|---|---|
| LineShine Linpack result | 2.198 | exaflops | 2026 | Reported | 1 |
| LineShine power | 42.2 | MW | 2026 | Reported | 1 |
| LineShine efficiency | 52.07 | GFlops per watt | 2026 | Reported | 4 |
| El Capitan Linpack result | 1.809 | exaflops | 2026 | Reported | 1 |
| El Capitan efficiency | 60.94 | GFlops per watt | 2026 | Reported | 5 |
| El Capitan HPL-MxP result | 16.7 | exaflops | 2026 | Reported | 5 |
| LineShine HPCG result | 22.00 | petaflops | 2026 | Reported | 5 |
| Combined list performance | 18.73 | exaflops | 2026 | Reported | 5 |
| Systems with accelerators | 276 | of 500 | 2026 | Reported | 5 |
| Green500 leader efficiency | 73.282 | GFlops per watt | 2026 | Reported | 3 |
| US data centre electricity use | 176 | TWh | 2023 | Reported | 12 |
| US data centre electricity share | 4.4 | % | 2023 | Reported | 12 |
| Exascale Computing Project budget | 1.8 | USD billion | 2024 | Reported | 17 |
| CHIPS and Science Act funding to Commerce | 50 | USD billion | 2022 | Reported | 43 |
| EuroHPC budget 2021 to 2027 | 8.2 | EUR billion | 2026 | Reported | 11 |
| JUPITER GH200 superchips | 24,000 | about | 2025 | Reported | 9 |
B.2Global source register
The governed source set behind this edition. Each source keeps its authority, coverage, cadence and role; categories describe origin, not truth.
Domains bound by the register
- INF
- ENE
- FIN
- TRD
- AIC
- MIN
- CLI
- WAT
- DAT
- HLT
| Source | Category | Coverage | Period | Cadence | Role |
|---|---|---|---|---|---|
| TOP500 list pages12 | benchmark project | global | 2025 to 2026 | twice a year | systems |
| Green500 list3 | benchmark project | global | 2026 | twice a year | efficiency |
| TOP500 release and highlights45 | benchmark project | global | 2026 | twice a year | totals and benchmarks |
| EuroHPC pages91011 | EU body | EU | 2025 to 2026 | continuous | systems and budget |
| DOE news item12 | national agency | US | 2024 | one-off | data centre energy |
| BIS homepage13 | national agency | US | 2025 to 2026 | continuous | export rules |
| RIKEN page14 | national institute | Japan | 2025 | one-off | roadmap |
| MPI and OpenMP pages1516 | standards forums | global | 2024 to 2026 | periodic | software standards |
| ECP page and CHIPS and Science Act1743 | national programme and statute | US | 2022 to 2024 | one-off | funding |
| UK action plan23 | national government | UK | 2025 | one-off | compute plan |
B.3Regional reading, HPC across ten clusters
Regional plates follow with the regional editions. This page gives the regional reading of HPC infrastructure in table form and ranks no region.
| Region | Principal hazards | Systems most exposed | Baseline evidence |
|---|---|---|---|
| North America | three exascale systems at DOE laboratories; chips funding | systems, finance, energy | TOP5001; CHIPS and Science Act43; DOE12 |
| South America | regional evidence not bound | not bound | regional evidence (not bound) |
| Europe | JUPITER; EuroHPC budget; AI Factories; rules for data centres | systems, governance | EuroHPC91011 |
| Eurasia | regional evidence not bound | not bound | regional evidence (not bound) |
| Middle East and North Africa | regional evidence not bound | not bound | regional evidence (not bound) |
| Africa | regional evidence not bound | not bound | regional evidence (not bound) |
| South Asia | regional evidence not bound | not bound | regional evidence (not bound) |
| East Asia | LineShine in China; Fugaku and FugakuNEXT plan in Japan | systems, roadmaps | TOP50014; RIKEN14 |
| ASEAN | regional evidence not bound | not bound | regional evidence (not bound) |
| Oceania-Pacific | regional evidence not bound | not bound | regional evidence (not bound) |
B.4Cluster card: exascale systems on the June 2026 list
- systems
- power
- efficiency
- public lists
- Systems in view
- LineShine, El Capitan, Frontier, Aurora, JUPITER Booster
- Defining events
- LineShine entry at first place; JUPITER inauguration19
- Couplings
- ENE → INF facility power; TRD → INF licence rules
- Capability evidence
- warm-water cooling and heat reuse at one system9
- Gaps
- cooling water; newest system power from primary pages; supply
- Agenda items
- H-01 · H-04
The five largest systems draw from 15.8 to 42.2 megawatts, as the list reports [1].
POWER
Tens of megawatts
The Green500 leader draws 46 kilowatts and reaches 73.282 gigaflops per watt [3] [5].
EFFICIENCY
Small systems lead
JUPITER uses warm-water cooling and sends heat to a campus network. No other system is documented here [9].
RESPONSE
Heat reuse
B.5How countries appear in the HPC edition
Countries enter the HPC edition through the readiness chapters of their own national editions, on one card grammar. They are read against peer distributions and thresholds, never ranked.
| Card field | What it shows | Source |
|---|---|---|
| WEFH+B state | each core system against peer distribution bands | national edition |
| Couplings | the national dependency matrix | national edition |
| Risk objects | the national risk portfolio | national edition |
| Capability rungs | the national capability ladder | national edition |
| Evidence age | oldest and newest source dates | national source register |
Editions in the 2026 Baseline programme
countries and unions
clusters
flagship and sector
technology reports
How to read a country card
- Each system is shown against the distribution of its peers, with thresholds where they exist
- Couplings and risk objects come from the country’s own national edition
- Capability rungs record evidence, not a judgement of institutions
- Evidence age is printed, so older national data are visible as such
| Wave | Countries and unions | State |
|---|---|---|
| W0 | Canada | ISSUED |
| W1 | United States, United Kingdom, France, Germany, Italy, Japan, European Union, Switzerland | PLANNED |
| W2 | Mexico, Brazil, Argentina, Türkiye, Russian Federation, Saudi Arabia, United Arab Emirates, South Africa, Senegal, Kenya, African Union, India, China, Republic of Korea, Indonesia, Singapore, Australia | PLANNED |
B.6Licences
| Material | Licence |
|---|---|
| Text | CC BY 4.0 |
| Data | on the licence of each source; Nexus tables CC BY 4.0 |
| Figures | Nexus figures CC BY 4.0; third-party as credited |
| Maps | boundary source and licence printed on each plate |
| Metadata | CC0 1.0, as Zenodo publishes it |
| Third-party data, figures and text | The source’s own licence, credited where it is used; never relicensed |
| Nexus-authored text, tables and figures: CC BY 4.0 (SPDX CC-BY-4.0). Map plates print their boundary source and licence. | |
B.7Formats and provenance
| Format | Kind | State | What it is | Identifier |
|---|---|---|---|---|
| Web edition | HTML | On this site | Draft in stewardship review; every value resolves to its source. | NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0 |
| Print edition | At release | A4 portrait · screen, print and archival PDF, signed with the web edition at release. | NR-XTECH-HPC-GLOBAL-2026-BASELINE-v1.0.0 | |
| Indicator data | CSV · JSON | On this site | 16 indicators with unit, year, status and source; the machine-readable copy ships with the evidence bundle at release. | NR-XTECH-HPC-GLOBAL-2026-BASELINE data release v1 |
| Figures | SVG · PNG | On this site | 4 on the web edition: headline figure, figure 1.3, coupling instrument, capability ladder. | FIG-XTECH-HPC-GLOBAL-2026-BASELINE-* |
| Slides | Not recorded | No slide deck is recorded for this edition. | ||
| Evidence brief | HTML · PDF | Not recorded | No evidence brief is recorded for this edition. | |
| Dataset with DOI | DataCite | At release | Concept and version DOI are minted at deposit; none is recorded yet. |
Provenance
- Edition pack
- The edition’s content pack (JSON), from which the print and web editions are built
- Evidence cut
- DC-XTECH-HPC-GLOBAL-2026-B0, closed 30 September 2026
- Reproducibility
- sourced values cited; analytical values reproducible from stated parameters
- Self-check
- 14 of 23 at evidence close; a fail on any item blocks release
- Review
- five passes scheduled before release (in Annex C)
- Publisher of record
- The Global Centre for Risk and Innovation (GCRI) for the Nexus Consortium
- Corrections
- Registry correction pathway; upheld corrections are published as notices with a new version
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1TOP500 (ed.), TOP500 list, June 2026, 67th edition (list page; top systems, Rmax, Rpeak, cores and power). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 4TOP500 (ed.), LineShine Debuts at No. 1 as the TOP500 Enters a New Global Exascale Era (news release, 23 June 2026; LineShine, HPCG, HPL-MxP, Green500 values). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 5TOP500 (ed.), Highlights, June 2026 (list totals, accelerator and processor shares, HPCG and HPL-MxP tables; the page gives some figures that differ from the list page). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 3TOP500 (ed.), Green500 list, June 2026 (list page; top five by gigaflops per watt). TOP500 project, Hamburg. Observation year 2026. Accessed 2026-11-03.back
- 12US Department of Energy (ed.), DOE releases new report evaluating increase in electricity demand from data centres (news item, 20 December 2024; 176 TWh in 2023, 4.4% of US electricity; 6.7% to 12% projected for 2028). US Department of Energy, Washington. Observation year 2023. Accessed 2026-11-03.back
- 17Exascale Computing Project (ed.), project site (2016 to 2024; USD 1.8 billion; about 2,800 collaborators; concluded). US Department of Energy, Oak Ridge. Observation year 2024. Accessed 2026-11-03.back
- 43US Congress (ed.), CHIPS and Science Act, Public Law 117-167, Division A, section 102 (statute text, enacted 9 August 2022; CHIPS for America Fund appropriations for fiscal years 2022 to 2026 sum to USD 50 billion, of which USD 39 billion for incentives and USD 11 billion for research). Government Publishing Office, Washington. Observation year 2022. Accessed 2026-11-03.back
- 11EuroHPC Joint Undertaking (ed.), Discover EuroHPC JU (about page; budget of at least EUR 8.2 billion for 2021 to 2027; Council Regulations 2021/1173, 2024/1732 and 2026/150). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 9EuroHPC Joint Undertaking (ed.), JUPITER launching Europe’s exascale era (news item, 5 September 2025; about 24,000 GH200 superchips; warm-water cooling; funding shares; power and budget not stated). EuroHPC JU, Luxembourg. Observation year 2025. Accessed 2026-11-03.back
- 2TOP500 (ed.), TOP500 list, November 2025, 66th edition (list page; top systems, Rmax, Rpeak, power). TOP500 project, Hamburg. Observation year 2025. Accessed 2026-11-03.back
- 10EuroHPC Joint Undertaking (ed.), AI Factories (programme page; 19 AI Factories and 13 antennas stated; the page lists 18 sites and 15 antennas). EuroHPC JU, Luxembourg. Observation year 2026. Accessed 2026-11-03.back
- 13US Department of Commerce Bureau of Industry and Security (ed.), BIS homepage (notice of 16 January 2025 on advanced computing integrated circuits; extension of 7 April 2026 to 31 December 2026; guidance of May 2026 on Country Group D:5 and Macau; full texts not opened). BIS, Washington. Observation year 2026. Accessed 2026-11-03.back
- 14RIKEN (ed.), FugakuNEXT project with Fujitsu and NVIDIA (news item, 22 August 2025; MONAKA-X CPU, NVIDIA GPU; more than 5 times hardware performance; up to 100 times application performance in about 40 MW; more than 600 exaflops FP8 sparse; operation around 2030). RIKEN, Wako. Observation year 2025. Accessed 2026-11-03.back
- 15OpenMP Architecture Review Board (ed.), OpenMP specifications (index page; version 6.0 of November 2024; technical report 15 as a public comment draft of 6.1, July 2026). OpenMP ARB, Urbana. Observation year 2026. Accessed 2026-11-03.back
- 16MPI Forum (ed.), MPI documents (index page; MPI 5.0 voted through 5 June 2025; MPI 4.1 of 2 November 2023). Message Passing Interface Forum. Observation year 2025. Accessed 2026-11-03.back
- 23UK Government (ed.), AI Opportunities Action Plan (page; expand the AI Research Resource by at least 20 times by 2030; non-AI HPC and exascale flagged as unresolved; no budget figure). Department for Science, Innovation and Technology, London. Observation year 2025. Accessed 2026-11-03.back
