The Global Centre for Risk and Innovation (GCRI)
Maps of Systemic Risk Management are published here once their data rights are cleared and they have been reviewed. Each shows its time and space reference, its sources and its uncertainty.
Systemic Risk Management released maps are reviewed map views of risk management and systemic risk, published once their data rights are cleared, each with its coordinate reference, date, sources and uncertainty. Layers draw on sources such as ISO 31000 and its handbook. A map shows released, rights-cleared evidence, not a live feed or an official warning.
Fig.A programme from scoping to the owner's decision. Design, not a record.
For released maps, in GCRI's spatial-intelligence reading, the map opens on night lights, true-colour imagery and population density with true colour from NASA GIBS, framed on World; every other NASA layer, live feed and forecast waits in the layer list.
The interactive map needs JavaScript; the layer list and sources are below.
Layers 3
Infrastructure exposure, for this page
Keyboard, with the map focused
Hold Ctrl or ⌘ and scroll to zoom
Latest available
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth
Loading the latest NASA imagery.
Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.
For released maps, in GCRI's spatial-intelligence reading, the map opens on night lights, true-colour imagery and population density with true colour from NASA GIBS, framed on World; every other NASA layer, live feed and forecast waits in the layer list.Satellite and model products as NASA publishes them, each with its own date; indicators, not assessments of any place; claim ceiling INTEGRATED.
Layers and dates
| Indicator | Unit | Cadence | Evidence label | Topic |
|---|---|---|---|---|
| Risks with a named owner | percent of register entries | quarterly | Reported | Risk governance and appetite |
| Exposure against tolerance | ratio of measured exposure to stated tolerance | per reporting cycle | Reported | Risk governance and appetite |
| Tolerance breaches escalated on time | percent of breaches escalated within the defined period | quarterly | Reported | Risk governance and appetite |
| Cross-cutting risks with joint ownership | count of risks with a cross-unit owner | annual | Declared | Risk governance and appetite |
| Board time on principal risks | share of agenda time | annual | Reported | Risk governance and appetite |
| Open audit findings on risk governance | count by age band | quarterly | Reported | Risk governance and appetite |
| Register entries mapped to a reference taxonomy | percent of entries | per review | Reported | Identification and risk taxonomy |
| Emerging risks added | count per review cycle | per review | Reported | Identification and risk taxonomy |
| Risks spanning more than one category | count | per review | Reported | Identification and risk taxonomy |
| Time since last register review | months | continuous | Observed | Identification and risk taxonomy |
| Hazards covered against a reference list | percent of applicable hazard profiles | annual | Estimated | Identification and risk taxonomy |
| External sources consulted in identification | count by type | per review | Declared | Identification and risk taxonomy |
| Mapped critical dependencies | count of supplier and service dependencies recorded | annual | Declared | Cascades and interdependence |
| Single points of failure | count of dependencies without a substitute | annual | Estimated | Cascades and interdependence |
| Buffer endurance | hours or days of operation after loss of an input | per asset | Declared | Cascades and interdependence |
| Supplier concentration | Herfindahl-Hirschman index of spend or volume | annual | Observed | Cascades and interdependence |
| Cascade depth in scenarios | number of systems affected downstream | per scenario | Modelled | Cascades and interdependence |
| Restoration sequence time | hours to restore dependent services | per event | Observed | Cascades and interdependence |
| Risks assessed with quantitative estimates | percent of principal risks | annual | Reported | Quantitative and qualitative methods |
| Calibration of expert estimates | calibration score on seed questions | per elicitation | Observed | Quantitative and qualitative methods |
| Loss event records | count of events with cause and amount recorded | continuous | Observed | Quantitative and qualitative methods |
| Assessment uncertainty range | ratio of upper to lower bound | per assessment | Estimated | Quantitative and qualitative methods |
| Controls with tested effectiveness | percent of key controls | annual | Reported | Quantitative and qualitative methods |
| Method documentation completeness | percent of assessments with method, data and assumptions recorded | annual | Reported | Quantitative and qualitative methods |
| Scenarios tested per cycle | count by hazard type | annual | Reported | Scenario and stress testing |
| Capacity or capital shortfall under stress | units of the tested resource | per scenario | Modelled | Scenario and stress testing |
| Time to breach a critical threshold | days | per scenario | Modelled | Scenario and stress testing |
| Dependencies represented in the test | percent of mapped critical dependencies | per test | Declared | Scenario and stress testing |
| Actions taken after the test | count of management actions recorded | annual | Reported | Scenario and stress testing |
| Reverse stress test conditions identified | count of failure conditions | per test | Modelled | Scenario and stress testing |
| Spare capacity | percent of peak demand available as reserve | monthly | Observed | Resilience engineering |
| Recovery time objective met | percent of tested services restored within objective | per exercise | Observed | Resilience engineering |
| Near misses reported | count per period | monthly | Reported | Resilience engineering |
| Lessons implemented | percent of recorded lessons with completed actions | quarterly | Reported | Resilience engineering |
| Staff trained for degraded operation | percent of critical roles | annual | Reported | Resilience engineering |
| Single-skill critical roles | count of roles with one qualified holder | annual | Observed | Resilience engineering |
| Contingent liabilities disclosed | count and type in public accounts | annual | Official | Enterprise and public risk |
| Critical public services delivered by contractors | count of services | annual | Official | Enterprise and public risk |
| Contracts with continuity and exit clauses | percent of critical contracts | annual | Reported | Enterprise and public risk |
| Principal risks linked to national risk categories | percent of disclosed principal risks | annual | Estimated | Enterprise and public risk |
| Public-private exercises held | count | annual | Reported | Enterprise and public risk |
| Emergency support provided to firms | count of support measures by type | per event | Official | Enterprise and public risk |
| Principal risks covered by assurance | percent of principal risks reviewed in the cycle | annual | Reported | Assurance and correction |
| Overdue audit actions | count by age band | quarterly | Reported | Assurance and correction |
| Incident investigations reaching organizational factors | percent of investigations | annual | Reported | Assurance and correction |
| Corrections issued to published risk evidence | count with reason recorded | continuous | Observed | Assurance and correction |
| Repeat incidents | count of incidents with a previously identified cause | annual | Observed | Assurance and correction |
| Independent reviews of the risk framework | date of last external review | per review | Declared | Assurance and correction |
Analysis runs in Nexus Foundry; reviewed releases are listed here.
Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.
| Term | Definition |
|---|---|
| Coordinate reference system | The definition that ties coordinates to locations on Earth, catalogued with EPSG codes. |
| Modifiable areal unit problem | The change in statistical results that comes from how areas are drawn and aggregated. |
| Zonal statistics | Statistics of raster values summarised within boundaries such as districts. |
| Public-safe release | A recorded decision on the detail at which a layer may be published without exposing sensitive sites or people. |
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.