A stress test asks what happens to an organisation, system or plan under a severe but plausible event, before a real shock answers the question. Scenarios describe how such events might unfold. Stress tests measure the effect on capital, capacity, services or people. This page sets out how scenarios are designed, how stress tests propagate shocks through dependencies, and how results serve the boards, ministries and supervisors that must act on them.
Scenario and stress testing on the record.
Scenario and stress testing: how the risk develops.
Challenging plans and assumptions. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
Scenarios set the question
A scenario fixes the trigger, its severity, its timing and the conditions around it. Choosing only familiar or mild scenarios produces reassuring results that say little about real vulnerability.
Shocks travel through the model
The stress spreads through dependencies represented in the test: suppliers, counterparties, infrastructure and staff. What the model leaves out cannot fail, so omissions bias results toward resilience.
Responses change the outcome
Institutions react during a crisis by selling assets, cutting services or drawing on reserves, and those reactions affect others. Tests that hold behaviour fixed miss these second-round effects.
Reverse tests find breaking points
Reverse stress testing starts from failure and asks which combinations of events would cause it. It reveals vulnerabilities that forward scenarios chosen in advance may never reach.
Stocks, flows, delays and a tipping threshold.
Two stocks, pressure and adaptive capacity, joined by a reinforcing growth loop, a delayed balancing response and damage when pressure outruns capacity; past the threshold the system can tip. Teaching model with stated illustrative values, not a prediction.
Controls
- Growth of pressure
- 6.0% a year
- Efficacy of capacity in reducing pressure
- 4.0% a year
- Investment response to perceived pressure
- 20%
- Perception delay
- 4.0 years
- Tipping threshold of pressure
- 60 index
- Amplification past the threshold
- 2.0 times
- Years simulated
- 50 years
Readouts
- Peak pressure
- 113 index
- Capacity at the end
- 186 index
- Years over the threshold
- 15.8 years
Numbers, methods and sources
| Year | Pressure | Capacity | Perceived |
|---|---|---|---|
| 0 | 20.0 | 50.0 | 20.0 |
| 4 | 23.3 | 44.9 | 21.2 |
| 8 | 27.2 | 42.2 | 24.0 |
| 12 | 31.7 | 42.3 | 27.7 |
| 16 | 36.8 | 45.5 | 32.2 |
| 20 | 42.3 | 51.5 | 37.2 |
| 24 | 47.9 | 60.3 | 42.6 |
| 28 | 53.2 | 71.3 | 48.0 |
| 32 | 57.8 | 84.3 | 53.1 |
| 36 | 66.4 | 98.4 | 58.4 |
| 40 | 82.7 | 115.9 | 69.7 |
| 44 | 97.8 | 139.7 | 83.8 |
| 48 | 109.1 | 169.4 | 97.3 |
Methods
- System dynamics Forrester (1961), Industrial Dynamics, MIT Press; Sterman (2000), Business Dynamics
- Critical transitions and tipping points Scheffer and others (2009), Early-warning signals for critical transitions, Nature 461
- Causal loop diagram Sterman (2000), Business Dynamics, McGraw-Hill
- Uncertainty fan (parameter Monte Carlo) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
- One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley
Data
No observed data enters this model: it runs on the teaching values set by the controls, to be replaced with a programme’s own evidence.
Across the six pillars, led by Nexus Consortium
- Experiments Labs
- Built in Systemic Risk Management in Foundry
- Tested at Systemic Risk Management in Universe
- Codified in Systemic Risks in Standards
- Published in Systemic Risk Management in Reports
- Taught in Faculty of Risk Science and Methods in Academy
Stress tests that cross domains test the joins, not the parts.
- EnergyCouplingEnergy price and supply shocks are standard stress cases.What to watchFuel and power supply assumptions
- FoodCouplingExport restrictions and price spikes test import-dependent food systems.What to watchImport dependence and stocks
- WaterCouplingMulti-year drought tests water, power and farm systems together.What to watchDrought duration in the scenario
Scenario work is designed for the Scenario and Stress-Test series, always labelled as scenario evidence. Financial supervisors use the NGFS scenarios for climate stress testing; national cross-sector tests need storylines built with each sector’s experts.
- Storylines with the assumptions each sector’s experts checked.
- Results of past stress tests a public body has published.
What is measured, and how well.
Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.
| Indicator | Unit | Cadence | Source type | Label |
|---|---|---|---|---|
| Scenarios tested per cycle | count by hazard type | annual | Stress testing programme records | REPORTED |
| Capacity or capital shortfall under stress | units of the tested resource | per scenario | Stress test outputs | MODELLED |
| Time to breach a critical threshold | days | per scenario | Stress test outputs | MODELLED |
| Dependencies represented in the test | percent of mapped critical dependencies | per test | Test design documentation | DECLARED |
| Actions taken after the test | count of management actions recorded | annual | Follow-up records | REPORTED |
| Reverse stress test conditions identified | count of failure conditions | per test | Reverse stress test records | MODELLED |
Where the evidence comes from.
Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.
| Source | What it gives | Licence class |
|---|---|---|
| NGFS climate scenarios | Reference climate transition and physical risk pathways for financial and policy stress tests | Open, attribution, NGFS terms of use |
| IPCC Shared Socioeconomic Pathways and the scenario database | Long-term socioeconomic and emissions pathways | Open, licence per database (to check) |
| Published supervisory stress test methodologies and results | Scenario design and aggregate outcomes from central banks and supervisors | Public records, terms per authority |
| National risk assessment reasonable worst-case scenarios | Government-published planning scenarios for civil contingencies | Public records, licence per government |
| UNDRR guidance on scenario-based exercises | Design guidance for exercises that test preparedness | Public, UN terms of use |
Who decides, and what the evidence serves.
Systemic Risk Management prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.
| Who decides | The question | Evidence this page serves |
|---|---|---|
| Boards and executive committees | Whether buffers and plans are adequate for severe but plausible events | Shortfalls and times to breach by scenario; reverse stress conditions |
| Central banks and financial supervisors | Which scenarios to set for supervisory exercises | Scenario libraries; cross-sector dependency evidence |
| Civil contingency and emergency planners | Which planning assumptions to use for national capabilities | Reasonable worst-case scenarios and their basis |
| Ministries of finance | How much fiscal space to hold for contingent liabilities | Public sector stress tests with assumptions stated |
Outputs this topic produces
- Scenario libraries with triggers, severity and assumptions documented
- Stress test designs that represent cross-sector dependencies
- Reverse stress test protocols for public services and organisations
- Exercise reports prepared for review by the institution tested
What scenario designers ask.
- Is the scenario severe enough to be informative, yet plausible enough to be taken seriously?
- Does it combine shocks that are likely to occur together, rather than treating them as independent?
- Does it include the reactions of other actors, which can amplify or damp the shock?
- What would the organisation actually do, and is that response realistic under stress?
Why scenarios reveal what forecasts miss.
Forecasts aim for the most likely outcome and tend to understate extremes. Plans built on them fail when the unusual happens. Scenarios deliberately explore the space of outcomes, including combinations that historical data has not yet shown. Reverse stress testing works backwards: it starts from failure and asks what would have to happen to cause it, which often exposes vulnerabilities that forward scenarios miss.
Stress tests reveal not only losses but behaviour: which decisions would be needed, who would make them, what information they would need and how long it would take. Many failures in real crises come from slow or unclear decisions rather than from the size of the initial shock.
How scenarios and stress tests are built.
- 01
Narrative scenarios
Qualitative stories built by diverse groups around key uncertainties. Limits: can be shaped by group consensus and familiar fears.
- 02
Quantified stress scenarios
Consistent sets of shocks to model inputs, designed with scenario design and stress testing methods. Limits: model results depend on how the model represents behaviour under stress.
- 03
Reverse stress tests
Identify scenarios that would cause failure. Limits: many paths can lead to failure, and choosing which to study requires judgement.
- 04
Exercises
Tabletop and live exercises test decisions and coordination. Limits: participants know it is an exercise.
How it is studied, and what the methods cannot say.
- 01Scenario design and stress testingCross-sector scenario design · Reverse stress testing · Second-round effectsApplied here
- 02Network science and contagionDependency network mapping · Centrality and concentration · Failure propagation simulationApplied here
- 03Uncertainty quantification and model validationPropagating input uncertainty · Separating kinds of uncertainty · Deep uncertainty framingApplied here
- 04Probability and statisticsFrequency and severity modelling · Dependence between risks · Combining data and judgementApplied here
Where this page’s references lead.
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
Questions and answers.
What is a stress test?
What is reverse stress testing?
Is a scenario a prediction?
Is a stress test a prediction?
How severe should a scenario be?
Can the platform design a stress test for my organisation?
Bring a method, a dataset or a question.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Legal documents.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.