GCRI · Handel und strategische Ressourcen

Optimierung für Handel und Versorgung

Optimisation and operations research decide how to route, stock and diversify supply under cost and risk. In this field they design rerouting, size strategic stocks and choose sourcing portfolios that hold up across disruption scenarios.

01Registrieren

Optimisation for trade and supply on the record.

MethodennachweisMINT-Methode
  1. MethodeOptimierung und Operations Research
  2. Angewandt inHandel und strategische Ressourcen
  3. Kanonische SeiteMINT-Commons
02Antrag

What optimisation and operations research does here.

Optimisation and operations research develop mathematical methods for allocating resources and making decisions under constraints. They support planning and logistics in complex, interconnected Systeme. In trade, resources and supply chains and industry and robotics, optimisation supports prepositioning of supplies, network investment and recovery sequencing. Robust formulations help choose options that perform acceptably across many scenarios. The canonical description is on die STEM Commons.

Rerouting under chokepoint closure

Shipping network models find least-cost alternative routes when a chokepoint closes, and estimate added distance, time and capacity needed at alternative ports.

Strategic stock sizing

Stock levels for essential inputs are set by comparing holding costs with expected Stromknappheit costs across disruption scenarios.

Sourcing portfolio design

Supplier mixes are optimised for cost and resilience, showing how much diversification reduces exposure for a given price premium.

03Simulator

Ein Schock in einer Input-Output-Wirtschaft.

A loss of output in one sector propagates through the technical coefficients to its suppliers and customers, and recovers at the rate you set; the coefficients are teaching values, not national accounts. Teaching model with stated illustrative values, not a prediction.

Steuerung

Zuerst getroffener Sektor (Position in der Liste)
0
Größe des Schocks
30 % seiner Produktion
Dauer des Schocks
30 days
Erholungsrate
0.08 pro Tag
Simulierte Tage
180 days

Messwerte

Entgangene Leistung über den Zeitraum
0.61% of a year’s output
Gesamt zu direkt (Multiplikator)
1.62 times
Am stärksten betroffener anderer Sektor
Dienste
Ihre maximale Funktionsunfähigkeit
3.9%
Zahlen, Methoden und Quellen
SektorMaximale Inoperabilität (%)Produktionsgewicht (%)
Landwirtschaft30.8514.6
Energie2.8316.5
Fertigung0.5019.5
Verkehr und Häfen0.3412.0
Handel0.2319.8
Dienste3.9117.6

Methoden

  1. Input-Output-Analyse Leontief (1936); Miller and Blair (2009), Input-Output Analysis, Cambridge University Press
  2. Inoperabilitäts-Input-Output-Modell Haimes and Jiang (2001), Journal of Infrastructure Systems 7
  3. Dynamische Funktionsunfähigkeit und Wiederherstellung Lian and Haimes (2006), Systems Engineering 9
  4. Unsicherheitsfächer (Parameter-Monte-Carlo) Spiegelhalter, Pearson und Short (2011), Visualising uncertainty about the future, Science 333
  5. Sensitivität mit jeweils einem Faktor (Tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Daten

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • Seehäfen Natural Earth
  • Maritime Engpässe Nexus (benannte Meerengen und Kanäle an ihren veröffentlichten Koordinaten)
  • Eisenbahnen Natural Earth
  • Hauptstraßen Natural Earth
Ein Schock in einer Input-Output-Volkswirtschaft. Illustratives Lehrmodell: Es läuft mit den über die Regler eingestellten Werten, nicht mit Messdaten. Methoden: Input-Output-Analyse (Leontief (1936); Miller und Blair (2009), Input-Output Analysis, Cambridge University Press); Input-Output-Modell der Inoperabilität (Haimes und Jiang (2001), Journal of Infrastructure Systems 7); dynamische Inoperabilität und Erholung (Lian und Haimes (2006), Systems Engineering 9).
04Daten

Was die Methode verwendet.

Datasets and records used by optimisation and operations research on this platform, with the role each plays and the label its values carry. Sources are listed in dem Quellenregister.

DatenRolleKennzeichnung
Shipping routes and port capacitiesNetwork constraintsGESCHÄTZT
Disruption scenariosUnsicherheitMODELLIERT
Input costs and demandZieleBEOBACHTET
05Methoden und Evidenz

How optimisation for trade and supply is modelled, measured and tested.

Das Modell, seine Annahmen, seine Daten und seine Unsicherheit in der Form, in der eine Wissenschaftlerin oder ein Ingenieur sie prüfen würde. Die Strukturen folgen veröffentlichten Methoden. Die dargestellten Werte sind illustrativ, keine Befunde.

Systemmodell

The couplings between the systems in optimisation for trade and supply: signs of influence, a reinforcing and a balancing loop, and cross-links where stress jumps.

++−+HandelIndustrieGemeinschaftenWirtschaftR verstärkendB ausgleichend
Causal loop diagram from the page’s systems; signs show the direction of influence. Illustrative structure for a system dynamics or network model, not estimated couplings.
FAIR-Leitprinzipien · GO FAIR und FORCE11W3C PROV · World Wide Web ConsortiumHinweise zur einheitlichen Behandlung von Unsicherheiten · IPCCCEOS Analysis Ready Data · Committee on Earth Observation Satellites
06Validierung

Wie Ergebnisse geprüft werden.

Solutions are checked for feasibility, tested through simulation and compared with historical decisions. Sensitivitätsanalyse examines how results change with parameters.

PrüfenWie es gemacht wird
Out-of-sample scenariosSolutions are tested on scenarios not used to choose them
Operator reviewRoute and capacity constraints are checked with logistics operators
Trade-off reportingCost and resilience trade-offs are shown as a frontier

Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.

08Treuhänderschaft

Wer die Methode pflegt.

Systemwissenschaft und Modellierung stewards optimisation and operations research for the Consortium and reviews how it is applied across platforms.

10Fragen

Fragen und Antworten.

What are the limits of optimisation and operations research in this field?
Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.
Wie werden Ergebnisse geprüft?
Solutions are checked for feasibility, tested through simulation and compared with historical decisions. Sensitivity analysis examines how results change with parameters.
Sind die Werte auf dieser Seite echt?
The data names, roles and checks are real descriptions of practice. The canvas shows a design of the method’s use, not a run; no result is reported here.
Wo wird diese Methode sonst angewandt?
Das kanonische Methodenseite listet jede Plattform auf, die sie anwendet.
BerichteBeitragen

Evidenz von dieser Seite aus beitragen.

Berichte is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIHandel und strategische RessourcenStrategische SystemeSzenario und Stresstest
Handel und strategische Ressourcen

Bringen Sie eine Methode, einen Datensatz oder eine Frage mit.

Information und Anfragen sind heute offen. Eine Anfrage erhält ein Aktenzeichen und nennt den nächsten Schritt; Bewerbungen, Zahlungen, Rechenzuteilungen und Registrierungen öffnen erst, wenn Team, Bedingungen und Prüfkapazität bestehen.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.