Skip to content

GCRI · How Nexus works

تاقیکردنەوە

Testing puts an analysis, and the institutions that would use it, under controlled pressure before a real event does. Exercises, scenario drills and side-by-side comparisons are run so that failure is cheap and recorded.

01شەش کۆڵەکە

This step runs in Universe.

Where a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed. Go to Universe.

کۆڵەکەکان هەڵبژێرە · بەسەر هێڵەکاندا ڕابوەستە16 / 18 ڕادەستکردنەوە

ڕێڕەو

Around Universe

ئەو کۆڵەکانەی Universe کار بۆیان دەنێرێت و لێیانەوە وەری دەگرێت.

L · F · U · S · R · A

کۆڵەکەکان
5 لە 6
دەستبەدەستکردنەکان
16 لە 18
خولەکان
16 داخراو

دەستبەدەستکردنی لە کاردا

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

و 12 دانەی دیکە

F01 تا F14 دەستبەدەستکردنە تۆمارکراوەکانی ساڵی پڕۆگرامن، هەر یەکە لەگەڵ ئارتیفاکتی جووڵاو و قۆناغەکەی؛ R1، R2، R3 و R4 کار بە دەوری ئەنگوستیلەکەدا دەگێڕن. خولێک دەژمێردرێت کاتێک هەموو کۆڵەکەیەکی سەری هەڵبژێردرابێت. هەر کۆڵەکەیەک بە سەرپەرشتیی Nexus Consortium ە.
  1. LabsWhere questions become experiments and prototypes: new methods, data and tools are tried in the open, with their limits on record, before the Foundry builds them, under the Nexus Consortium.Labs at GCRI: Labs
  2. FoundryWhere methods, data and models become reproducible builds, each run with its inputs, version and limits on record.Foundry at GCRI: Foundry
  3. UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Universe at GCRI: Universe technical officeuniverse.nexus
  4. Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Nexus Standards
  5. ڕاپۆرتەکانشوێنێک کە دۆزینەوەکان لەگەڵ میتۆد، نادڵنیایی و پۆلی بەڵگەیان بڵاو دەکرێنەوە و وەک وەشانی نوێ ڕاست دەکرێنەوە.Reports لە GCRI: بڵاوکردنەوەڕاپۆرتەکان
  6. Risk AcademyWhere methods and systems are taught on real data and real places, by working the case, on Risk Academy.Risk Academy
02Kinds of test

From desk review to full exercise.

تاقیکردنەوەWhat it showsReference practice
پێشبینیی پاشەوەWhether a model reproduces a past event it was not tuned onSplit-sample validation in hydrology and climate science
Tabletop exerciseWhether decision-holders can use the outputs under time pressureExercise programmes in ISO 22301 business continuity and civil protection practice
سیناریۆ تاقیکردنەوەی فشاریHow a system behaves under severe but plausible combinationsReverse and compound stress testing in financial and infrastructure practice
Red teamHow an AI or data system fails under adversarial useNIST AI RMF measure function; adversarial testing
03شوێنی کار

The workspace for the test step.

Exercise control

Methods council · Example exercise interface, not a record

Example interfaceGCRI · GCRI

What the screen records

Injects delivered
count against the planned injects
Median response
minutes, per player cell
Observer notes
count, observers first
هەڵوەشاندنەوەی ئامادەباشی
planned day and hot wash

Inject timeline

example sequence

  1. 09:00INJ-1Scenario opens: Methods council
  2. 10:30INJ-2Independent reviewer receives first signal
  3. 12:15INJ-3Escalation: second system affected
  4. 14:00INJ-4Media query and public message
  5. 16:30HOTHot wash, observers first

Player cells

خاوەنی پڕۆگرامinjects, response time, state
ئۆفیسی تەکنیکیی The Global Centre for Risk and Innovation (GCRI)injects, response time, state
Independent reviewerinjects, response time, state
دەسەڵاتی تایبەتمەندinjects, response time, state
Exercise control.Illustrative interface; not live data.

GCRI · Exercise control. Exercise control: example names and illustrative values, not a record.

04Universe

The annual programme where tests are run.

Controlled tests are scheduled through Universe, the annual programme governed at the Global Risks Forum (GRF). GCRI is its technical office: it designs scenarios, prepares data, keeps the run log and writes the technical after-action review. A test result is an observation about a system under stated conditions; it is never a certification of that system.

05پرۆسە

چۆن پرۆسەکە کار دەکات.

Process explorer · Process

Test: Bank stress test

8 هەنگاو4 قۆناغ

پرۆسە

Test: Bank stress test

The Basel stress testing principles describe severe but plausible scenarios, a method to quantify impact, and use of results; hurdles depend on the exercise.

  1. 01 Scenario and balance sheet

    1. 01Scenario designDataset · National DeskScenarios capture the material risks identified, with a narrative explaining how. They are severe but plausible and varied.
    2. 03Balance sheet projectionModel · National DeskMethods range from point-in-time static approaches to dynamic simulations that reflect future business activities and management actions.
  2. 02 Risk impacts

    1. 04Credit lossesModel · Credit risk functionCredit risk is one risk the scenario must capture. Banks also keep a model inventory and a validation function for stress models.
    2. 05EarningsModel · National DeskThe risk identification process includes earnings vulnerabilities. Net interest income under a rate path is one common view.
    3. 06Market and counterparty lossesModel · National DeskMarket stress tests supplement value-at-risk models with factor shocks or integrated scenarios, historic or hypothetical.
  3. 03 Capital and actions

    1. 02Management actionsStep · National DeskWhere management actions enter supervisory submissions, authorities check they fit the bank’s other strategic plans, such as recovery plans.
    2. 07Compare projected capital with requirementsStep · National DeskStress tests quantify risks and inform their understanding. Depending on objectives, they may or may not use hurdle rates or thresholds.
  4. 04 Authority

    1. 08Authority use of the resultsDecision · National DeskAuthorities may use results as one supervisory input. For capital adequacy, they consider the response to deficiencies.

Outline of an external standard or method, from its public sources. It describes what the framework says, not a record of any run. It does not show that Nexus or any partner performs, certifies or approves a step. A gate is a step of the method, never a Nexus approval.

07دواتر

Then: publish.

08سەرچاوەکان

Where this page’s references lead.

ئەو لەش و بەڵگەنامانەی ئەم لاپەڕەیەیان لەگەڵ دەخوێنرێتەوە. دۆخ و وەشانەکان دەگۆڕێن؛ هەر بەستەرێک دەچێتە لای لەشی دەرکەر.

Global Centre for Risk and Innovation

ڕێگایەک، کۆمەڵە داتایەک یان پرسیارێک بهێنە.

زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.