GCRI · Labs

Test in Universe

The mission themes Labs brings to the annual Universe programme, governed by The Global Risks Forum, with its own website at universe.nexus.

01Six pillars

Universe among the six pillars.

Where everything comes together in the annual programme, with the Global Centre for Risk and Innovation (GCRI), GRF and the Global Risks Alliance (GRA) each contributing in its role and capacity. It is led by the Nexus Consortium; its home is universe.nexus.

Select pillars · hover lines16 / 18 handoffs

Route

Around Universe

The pillars Universe hands work to and receives it from.

L · F · U · S · R · A

Pillars
5 of 6
Handoffs
16 of 18
Loops
16 closed

Handoffs in play

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

and 12 more

F01 to F14 are the recorded handoffs of the programme year, each with the artefact that moves and its phase; R1, R2, R3 and R4 carry work around the ring. A loop counts when every pillar on it is selected. Every pillar is led by the Nexus Consortium.
  1. LabsWhere questions become experiments and prototypes: new methods, data and tools are tried in the open, with their limits on record, before the Foundry builds them, under the Nexus Consortium.Labs in LabsLabs
  2. FoundryWhere methods, data and models become reproducible builds, each run with its inputs, version and limits on record.Labs in FoundryFoundry
  3. UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method's skill is measured, not assumed.Labs in Universeuniverse.nexus
  4. Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Data and Evidence in Standardsnexustandards.com
  5. ReportsWhere findings are published with their method, uncertainty and evidence class, and corrected as new versions.Labs in ReportsReports
  6. Risk AcademyWhere methods and systems are taught on real data and real places, by working the case, on Risk Academy.Faculty of Risk Science and Methods in Academyrisksacademy.com

Universe in every area of the work

AreaUniverse
LeadershipGRF steers the annual programme and records each gate decision from G0 to G7, with dissent kept on the record.
StrategyNational and regional priorities become the year's missions; the annual mandate at gate G0 sets which missions the programme takes on.
CadenceOne year to prepare, one month to build, one week to act and test in Q3, a planned stand-down, then review and renewal in Q4.
OwnershipOwns the cycle mandate, mission admission decisions, gate decisions, after-action records and the renewal decision.
ProcessTwelve phases, from planning to renewal, each closed by a gate or a record.
DevelopmentDevelops national demand into admitted, qualified missions, and carries the lessons into the next mandate.
SimulationsTests work under exercise control in Action Week with independent evaluators; nothing simulated is reported as observed impact.
ReportingAuthorises publication of the year's results at gate G6 and supplies after-action and scenario findings.
GovernanceGRF governs the programme; a cycle gate is a programme decision, not a public-authority approval.
Data and evidenceRun, decision and observation records from Action Week are sealed at closeout, gate G5.
Finance and resourcingData, people and resource offers are qualified before the build at gate G2; an offer is not an allocation.
Risk and assuranceExercise controls and stop-work events keep Action Week controlled, reversible and independently evaluated.
ParticipationGovernments, agencies, researchers, finance, civil society and communities take part through missions, tracks and national contributions.
CommunicationMission themes are presented as proposals until admitted, and confirmed exercises are announced with their gate record.
LocalExercises run on named places and systems, under exercise control.
NationalNational demand forms the agenda, and national counterparts own the agenda, data and decisions.
RegionalRegional programmes contribute missions that cross borders.
PlanetaryThe annual programme brings national and regional work together once a year.

What each institution brings

PillarGCRIGRFGRA
UniverseIts technical office prepares the scientific and data readiness of each mission.Stewards and governs the programme: the mandate, gates G0 to G7, convening and Action Week.Runs finance-readiness dialogues on what each mission means for finance and insurance.
02Exercises

Compound-stress exercises designed for laboratory.

Exercise themeWhat it tests
Testbed protocols for an editionWhether experiments for a Universe edition have protocols, criteria and safety controls in place before they run
03Workspace

The workspace for Test in Universe.

Action week

Universe · Labs · Week 40 · Example interface, not a record

Week plannedGCRI · Labs

Tracks

controlled sessions

MonTueWedThuFri0910111213141516Replication sprintTestbed open dayNegative results seminarProtocol reviewStand-down and hot washObserver briefing

Observer notes

  1. O-1Escalation path unclear between cellsTrack 12 h
  2. O-2Data hand-off worked as designedTrack 26 h
  3. O-3Public message drafted before verificationTrack 38 h
Action week.Illustrative interface; not live data.

Labs · Action week. Action week: example names and illustrative values, not a record.

04Themes

Mission themes from this field.

  1. 01

    Testbed protocols for an edition

    Proposed for controlled testing in the annual programme; a theme is not a confirmed exercise.

05Process

How the process runs.

Process

Test in Universe: Exercise from design to lessons

An exercise needs objectives, qualified environments and independent evaluators; GRF authorises controlled live operation, evidence is sealed and the review keeps dissent.

  1. 01 Design

    1. 01ObjectivesRecord · The Global Risks ForumIndependent evaluators assess each exercise against its stated objectives. Nothing simulated is reported as observed impact.
    2. 02Entry conditionsComponentThe week starts only with qualified environments, controllers, evaluators, a scenario plan and stop-work authority.
    3. 03Direction, control and evaluation kept apartComponent · The Global Risks ForumGRF holds direction and admission, and GCRI's technical office runs the simulation environment. Evaluators did not design the scenario.
  2. 02 Conduct

    1. 04G4 · Controlled live operation authorisedGate · The Global Risks ForumGRF authorises controlled live operation for Action Week.
    2. 05Action Week: controlled exercisesExercise · UniverseTen exercise tracks run with independent evaluators and observation. None carries live actuation, incident command or warning authority.
    3. 06Exercise injects, finance track exampleStep · The Global Risks AllianceFinance and insurance readiness injects include a crossed parametric trigger or a wider sovereign spread. No transaction occurs.
    4. 07Run, decision and observation recordsRecordAction Week leaves run records, decision records, observation records and exercise assessments.
  3. 03 Close

    1. 08Stand-downStep · GCRINew work stops and authorised jobs are checkpointed. Temporary access is revoked and temporary capacity is released.
    2. 09G5 · Evidence sealed and stand-down recordedGate · The Global Risks ForumThe evidence is sealed with its provenance and the stand-down is recorded. Unresolved exceptions are recorded with accountable owners.
  4. 04 Learn

    1. 10After-action reviewStep · UniverseUniverse reviews what worked, what failed and what was not tested, preserving dissent.
    2. 11Improvement items with ownersRecord · UniverseThe exercise exits with improvement items. Method and gap findings become change proposals, and corrective actions close in the next period.

Universe · The programme year · A national missionDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The one-day stand-down is still proposed.

06How testing works

Controlled, reviewed and reversible.

Selected work is tested under controlled conditions, reviewed and then published with its limits. Results that pass go to Reports. The planned stand-down of each edition keeps review, reconciliation and corrections going after the event.

07Sources

Where this page's references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

08Questions

Questions and answers.

Where is Universe?
It has its own website at universe.nexus. GRF governs the programme.
Labs

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Support our work

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.