Risks and capability
Four cloud risk objects open the portfolio. Order carries no rank. Each is read across driver, exposure, vulnerability, capacity, cascade and consequence.
Contents
- ·Edition home
- ·Executive summary
- 1Cloud is shared infrastructure with a physical footprint
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Shared control-plane fault with diverging sovereignty rules
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
4.1Risk objects
Each risk is read across the chain from hazard to consequence, with its status and evidence-quality level.
InferredEQL 4RSK-XT08-INF-001
Shared control-plane failure
InferredEQL 3RSK-XT08-ENE-002
Local grid constraint
Expert inputEQL 2RSK-XT08-WAT-003
Water stress at cooling sites
InferredEQL 3RSK-XT08-GOV-004
Fragmented sovereignty and concentration
4.2Capability ladder
Existence is not readiness. Each of the fifteen capability functions is placed on the ladder by the strongest public evidence for cloud at the global level.
| Function | Rung | Level | Strongest public evidence at baseline |
|---|---|---|---|
| Prevention and mitigation | EXISTS | operator efficiency programmes and EU reporting rules5735 | |
| Monitoring and observation | LISTED | operators publish reports; no common cross-provider record2021 | |
| Early warning | LISTED | no consolidated early warning of provider faults | |
| Preparedness and planning | EXISTS | DORA and FedRAMP programmes1724 | |
| Redundancy and reserves | LISTED | multi-region designs exist; 2025 events show shared dependencies2021 | |
| Response | EXISTS | operators restored services within hours in three reported events202122 | |
| Continuity of critical services | LISTED | no consolidated evidence of tested failover or exit16 | |
| Recovery | EXISTS | full recovery was reported in each of the three events202122 | |
| Adaptation | LISTED | post-event changes reported by operators; not reviewed here40 | |
| Social protection | LISTED | not applicable at baseline | |
| Finance and insurance | LISTED | not reviewed | |
| Institutional coordination | EXISTS | competition authorities and EU institutions111217 | |
| Technical infrastructure | EXISTS | large installed base and standards2102530 | |
| Workforce | LISTED | no figure bound | |
| Research capacity | ADEQUATE | strong literature on cloud and edge2831323334 | |
| A capability listed in policy is not a tested one; each rung is the strongest public evidence at baseline. | |||
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 20Amazon Web Services (ed.), Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region (post-event summary; 19 October 11:48 PM to 20 October 2:20 PM PDT; latent race condition in the DNS management system for the regional endpoint; services and times listed; operator report). Amazon Web Services, Seattle. Observation year 2025. Accessed 2026-11-03.back
- 21Google Cloud (ed.), Incident report for the Service Control outage of 12 June 2025 (status page; 10:51 to 18:18 PDT by the incident header; mini report gives different times; policy data with blank fields caused a null pointer crash in Service Control; operator report). Google, Mountain View. Observation year 2025. Accessed 2026-11-03.back
- 22Cloudflare (ed.), Cloudflare outage on November 18, 2025 (blog post; start 11:20 UTC; core traffic largely restored 14:30 UTC; full recovery 17:06 UTC; Bot Management feature file doubled in size and exceeded a limit of 200 features; not caused by a cyber attack, per the operator). Cloudflare, San Francisco. Observation year 2025. Accessed 2026-11-03.back
- 17European Securities and Markets Authority (ed.), Digital Operational Resilience Act (page; applies from 17 January 2025; lists materials on critical ICT third-party provider designation; no designations on the page). ESMA, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1UNVERIFIED, not opened: IEA (ed.), Energy and AI (data centres about 415 TWh in 2024, about 1.5% of global electricity; about 945 TWh in the 2030 base case; about 1,200 TWh in 2035 with a range of 700 to 1,700), taken from search-result summaries; the report pages returned access errors. International Energy Agency, Paris. Observation year 2024. Accessed 2026-11-03.back
- 2Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, published 19 December 2024, DOI 10.71468/P1WC7Q (publication page; the page gives authors and a scenario range to 2028 but no figures; figures read in the DOE summary [3]). Lawrence Berkeley National Laboratory, Berkeley. Observation year 2023. Accessed 2026-11-03. doi:10.71468/P1WC7Qback
- 4Central Statistics Office (ed.), Data Centres Metered Electricity Consumption 2024 (statistical release of 10 June 2025; 22% of metered electricity in 2024, 21% in 2023; the GWh table was not in the content read). Central Statistics Office, Cork. Observation year 2024. Accessed 2026-11-03.back
- 18Euronews (ed.), EU Cloud and AI Development Act gets mixed reception (news article of 22 June 2026; three pillars; aim to triple European data centre capacity in five to seven years; acceleration zones within six months; 12-month maximum permit procedure; four assurance levels; reactions; press report of the proposal, not the proposal text). Euronews, Lyon. Observation year 2026. Accessed 2026-11-03.back
- 19European Commission (ed.), Energy Efficiency Directive (policy page; states a data centre energy efficiency package planned for the third quarter of 2026 and links to reporting of data centre energy consumption; no threshold or dates on the page). Directorate-General for Energy, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 6Microsoft (ed.), 2025 Environmental Data Fact Sheet (PDF; fiscal year ended 30 June 2024; Table 6 electricity consumed within the organisation 29,829,540 MWh in FY24 and 23,567,502 in FY23; Table 9 water consumption 5,807 ML in FY24 and 7,844 in FY23 after a new estimation approach; company-reported, section 1 reviewed by an external firm). Microsoft, Redmond. Observation year 2024. Accessed 2026-11-03.back
- 8Li, P., Yang, J., Islam, M.A. and Ren, S., Making AI Less Thirsty: Uncovering and Addressing the Secret Water Footprint of AI Models, arXiv:2304.03271, v1 April 2023, v5 March 2025 (abstract page; projection of 4.2 to 6.6 billion cubic metres of water withdrawal in 2027; accepted by Communications of the ACM per the page). arXiv, Ithaca. Observation year 2023. Accessed 2026-11-03.back
- 5Google (ed.), 2025 Environmental Report (PDF; fiscal year 2024; data centre electricity consumption up 27%, data centre energy emissions down 12%, fleet PUE 1.09 against a stated industry average of 1.56, water consumption up 28%; company-reported). Google, Mountain View. Observation year 2024. Accessed 2026-11-03.back
- 11UK Competition and Markets Authority (ed.), Cloud services market investigation (case page; final decision published 31 July 2025; recommends prioritising strategic market status investigations of Microsoft and AWS; board decision expected in the first quarter of 2026; the decision documents were not opened). Competition and Markets Authority, London. Observation year 2025. Accessed 2026-11-03.back
- 12European Commission (ed.), Commission opens market investigations into cloud computing services under the Digital Markets Act (announcement of 18 November 2025; two investigations on whether AWS and Microsoft Azure should be designated and one on whether the DMA fits cloud). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 16European Commission (ed.), Data Act explained (policy page; switching charges including data egress charges removed from 12 January 2027; transitional period 11 January 2024 to 12 January 2027; notice period not on the page). Directorate-General for Communications Networks, Content and Technology, Brussels. Observation year 2025. Accessed 2026-11-03.back
- 23Amazon Web Services (ed.), Opening the AWS European Sovereign Cloud (blog announcement of 14 January 2026; Brandenburg region; investment of EUR 7.8 billion stated; vendor announcement, weak evidence). Amazon Web Services, Seattle. Observation year 2026. Accessed 2026-11-03.back
- 7Amazon (ed.), 2024 Amazon Sustainability Report (PDF; AWS global PUE 1.15 in 2024 against a stated public cloud industry average of 1.25 and 1.63 for on-premises data centres, citing IDC; AWS water use effectiveness 0.15 L per kWh in 2024; company-reported). Amazon, Seattle. Observation year 2024. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Directive (EU) 2023/1791 on energy efficiency, Article 12 on data centre reporting, Official Journal of the European Union, 2023, cited from memory; the page returned no content. Observation year 2023. Accessed 2026-11-03.back
- 24US General Services Administration (ed.), FedRAMP 20x (programme page; announced March 2025; phase 1 26 submissions; first pilot authorisations 6 March 2026; phase 3 wide-scale adoption active; new Rev5 submissions stop 11 June 2027, a future date that may change). FedRAMP, Washington. Observation year 2026. Accessed 2026-11-03.back
- 40UNVERIFIED, not opened: Microsoft (ed.), Azure Front Door incident reports of October 2025, cited from memory; the page returned an error and no figure is used. Microsoft, Redmond. Observation year 2025. Accessed 2026-11-03.back
- 10Synergy Research Group (ed.), Q2 Cloud Market Passes $143 Billion; Highest Growth Rate in Eight Years (release of 30 July 2026; Amazon 28%, Microsoft 20%, Google 15%; quarterly revenue USD 143.4 billion; growth 43%; definition IaaS, PaaS and hosted private cloud; industry analyst). Synergy Research Group, Reno. Observation year 2026. Accessed 2026-11-03.back
- 25NIST (ed.), The NIST Definition of Cloud Computing, NIST SP 800-145 (publication page; September 2011; five essential characteristics, three service models and four deployment models). National Institute of Standards and Technology, Gaithersburg. Observation year 2011. Accessed 2026-11-03.back
- 30ETSI (ed.), Multi-access Edge Computing (technology page; industry specification group; news item of 31 October 2025 on Phase 4 specifications and a white paper; no counts on the page). European Telecommunications Standards Institute, Sophia Antipolis. Observation year 2025. Accessed 2026-11-03.back
- 28Armbrust, M. et al., Above the Clouds: A Berkeley View of Cloud Computing, Technical Report UCB/EECS-2009-28, 10 February 2009 (report page and abstract). University of California, Berkeley. Observation year 2009. Accessed 2026-11-03.back
- 31UNVERIFIED, not opened: Masanet, E., Shehabi, A., Lei, N., Smith, S. and Koomey, J., Recalibrating global data centre energy-use estimates, Science 367, 984 to 986, 2020, cited from memory; the page returned an access error. Observation year 2020. Accessed 2026-11-03.back
- 32UNVERIFIED, not opened: Satyanarayanan, M., The emergence of edge computing, Computer 50(1), 30 to 39, 2017, cited from memory. Observation year 2017. Accessed 2026-11-03.back
- 33UNVERIFIED, not opened: Shi, W., Cao, J., Zhang, Q., Li, Y. and Xu, L., Edge computing: vision and challenges, IEEE Internet of Things Journal 3(5), 637 to 646, 2016, cited from memory. Observation year 2016. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Barroso, L.A., Clidaras, J. and Hölzle, U., The Datacenter as a Computer: Designing Warehouse-Scale Machines, third edition, Morgan and Claypool, 2018, cited from memory. Observation year 2018. Accessed 2026-11-03.back