Skip to content

GCRI · Gestion du risque systémique

Assurance et correction

Assurance asks whether risk management works as described; correction makes sure that when it does not, records and decisions change. Internal audit, independent review, incident investigation and learning systèmes provide the checks. This page sets out how assurance is organised, why it can miss systemic weaknesses, and how corrections are recorded so that the evidence behind a decision stays traceable after the facts change.

01Registre

Assurance and correction on the record.

02La question

Assurance and correction: how the risk develops.

Evidence, review and methods correction. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mécanisme

Assurance tests what it is shown

Reviews examine the processes and records put in front of them. Risks that fall outside the scope, or between the scopes of several reviewers, go untested.

Mécanisme

Investigations stop at the first cause

Incident reviews that end at the person or component closest to the failure miss the organisational and design conditions behind it. Those conditions remain and produce the next incident.

Mécanisme

Corrections must reach the record

When an assumption, dataset or model proves wrong, decisions built on it need revisiting. Without versioned records, the correction is made in one place and the error persists elsewhere.

Mécanisme

Actions decay before closure

Audit and incident actions are agreed, then deferred as priorities shift. Overdue actions accumulate and the weaknesses they were meant to fix stay open.

03Suivi

Risk register.

L'écran qu'une équipe utiliserait pour suivre ce sujet : ses mesures, ses états et ses décisions. Les noms sont des exemples et les valeurs sont illustratives.

Registre des risques

Assurance and correction · Enterprise A · Review cycle Q4

Trois risques au-dessus de l'appétenceGCRI · Gestion du risque systémique

Risque résiduel

vraisemblance × impact, risques par cellule

Nombre de risques par cellule. L'ombrage suit les bandes d'appétence.

Au-dessus de l'appétence

Concentration des fournisseursAchatsÉlevé▲ 2
Inondation de centre de donnéesOpérationsÉlevé▲ 0
Erreur de modèle dans la tarificationFinanceMoyen▲ 1
Perte de personnel cléPopulationMoyen▼ 1

Processus de management du risque, d'après la norme internationale

  1. Périmètre, contexte, critèresdéfinir
  2. Identifiertaxonomie
  3. Analyserprobabilité · impact
  4. Évaluerpar rapport à l'appétence
  5. Traiterplans
  6. Surveiller et réviserICR
  7. Consigner et rapporterconseil

Actions de traitement

  1. T-11Composant critique à double sourceResponsable : achats · en retard9 j de retard
  2. T-14Déplacer le site de secours au-dessus du niveau d'inondationResponsable : opérationséchéance dans 14 j
  3. T-17Validation indépendante des modèlesResponsable : financeéchéance dans 20 j
Risk register: the screen’s structure, terms and states for Assurance and correction.Noms donnés à titre d'exemple et valeurs illustratives ; une conception, non un enregistrement ni un système en service.
04À travers les domaines

Assurance checks that risk evidence in every domain can be trusted.

05Méthodes et preuves

How assurance and correction is modelled, measured and tested.

Le modèle, ses hypothèses, ses données et son incertitude, sous la forme qu'un scientifique ou un ingénieur vérifierait. Les structures suivent des méthodes publiées. Les valeurs représentées sont illustratives, ce ne sont pas des résultats.

Modèle, équations et hypothèses

The model structure used for assurance and correction, the assumptions it makes and how each is tested.

Risque de l'élément iRi = f(Hi, Ei, Vi, Ci)aléa, exposition, vulnérabilité et capacité à faire face
Perte annuelle attendueEAL = ∑k pk · Lksur les événements k de probabilité annuelle pk
Systèmes couplésxt+1 = A xt + B ut + εtA carries the couplings, u the shock, ε the error
HypothèsePourquoi il est réaliséComment il est testé
Aléa et exposition sont indépendants au sein d'un événementGarde l'intégrale des pertes calculableComparer avec un ajustement de copule sur des relevés conjoints
Les couplages sont linéaires près du point de fonctionnementLaisse les chocs se propager à travers APerturber au-delà de la plage linéaire et comparer
Les courbes de vulnérabilité se transposent d'un lieu à l'autreLes courbes locales sont rarement disponiblesValider par rapport aux pertes observées lorsqu'elles existent
Entrées
jeux de données versionnés avec provenance
Productions
des distributions, jamais des nombres isolés
Code
publié avec la fiche de modèle et les tests
Reproduction
mêmes données, code, environnement et graine
Formulations standard du risque et de l'espace d'états ; les hypothèses énumérées sont typiques de la méthode, énoncées pour examen, et non des résultats.
Principes directeurs FAIR · GO FAIR et FORCE11W3C PROV · World Wide Web ConsortiumOrientations sur le traitement cohérent des incertitudes · GIECCEOS Analysis Ready Data · Comité sur les satellites d'observation de la Terre
06Indicateurs

Ce qui est mesuré, et avec quelle qualité.

Chaque indicateur porte son unité, sa périodicité, le type de source qui le sous-tend et l'étiquette de preuve que porterait une valeur. Aucune valeur n'est affichée : un programme les fournit sous sa propre autorité.

IndicateurUnitéFréquenceType de sourceÉtiquette
Principal risks covered by assurancepercent of principal risks reviewed in the cycleannuelAssurance mapsDÉCLARÉ
Overdue audit actionscount by age bandtrimestrielAudit action trackingDÉCLARÉ
Incident investigations reaching organisational factorspercent of investigationsannuelInvestigation reportsDÉCLARÉ
Corrections issued to published risk evidencecount with reason recordedcontinuCorrection logOBSERVÉ
Repeat incidentscount of incidents with a previously identified causeannuelBases de données d'incidentsOBSERVÉ
Independent reviews of the risk frameworkdate of last external reviewpar examenGovernance recordsDÉCLARÉ
07Sources

D'où proviennent les données probantes.

Jeux de données publics et registres institutionnels nommés, chacun avec sa catégorie de licence. Les sources fournies dans le cadre d'accords ne sont utilisées que selon leurs conditions et ne sont jamais republiées.

SourcesCe qu'elle apporteCatégorie de licence
Global Internal Audit StandardsRequirements for internal audit independence, planning and reporting, from The Institute of Internal AuditorsPublic, IIA terms of use
The IIA Three Lines ModelRoles of management, risk functions and internal audit in assurancePublic, IIA terms of use
National audit office reportsIndependent public sector audit findings on risk and resiliencePublic records, licence per office
Safety investigation board reportsInvestigations that trace organisational and systemic factorsPublic records, terms per board
Retraction Watch databaseRecords of retracted and corrected research used in evidence basesOpen, Crossref terms (to check)
08Décisions

Qui décide, et à quoi servent les données probantes.

risque systémique Management prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Qui décideLa questionDonnées probantes servies par cette page
Audit committeesWhether assurance over principal risks is sufficient and independentAssurance maps; overdue actions; external review dates
Chief audit executivesWhere to direct audit effort in the next planCoverage gaps; repeat incidents
Public accounts committees and legislaturesWhether public bodies have acted on findingsAudit office reports; action status

Résultats que produit ce thème

  • Assurance maps that show coverage gaps across lines and reviewers
  • Investigation protocols that trace organisational and design factors
  • Correction and versioning procedures for published risk evidence
  • Action tracking templates with ageing and escalation
09Questions essentielles

What assurance experts ask.

  • Is the evidence that controls work independent of the people who run them?
  • Are models validated against data they were not built on, and are their limits documented?
  • When an error is found, is it corrected openly, with a record of what changed and why?
  • Do near misses and small failures lead to learning, or are they explained away?
  • Who checks the checkers: is there a route for staff and outsiders to raise concerns that bypasses the line being reviewed?
  • Are corrections traced through to every decision, report and model that relied on the flawed result?
10Mécanismes

Why assurance weakens.

Assurance tends to erode quietly. Reviews become routine, findings repeat from one cycle to the next and the people being reviewed learn what reviewers look for. Major failures often follow years of assurance reports that described controls as effective.

Indépendance

Too close to the work

Reviewers who depend on those they review, or who designed the controls, find fewer problems.

Form over substance

Checking the paperwork

Assurance that checks whether processes are documented rather than whether they work.

Silent edits

Unrecorded change

Methods and models changed without records, so no one can tell what earlier results relied on.

11Méthodes et limites

How assurance and correction work.

  1. 01

    Validation des modèles

    Independent testing of models against data, benchmarks and expert review, using uncertainty quantification and model validation. Limits: validation is harder for models of rare events.

  2. 02

    Internal and external audit

    Independent review of controls and governance. Limits: audit samples, and its findings depend on scope.

  3. 03

    Version control and provenance

    Records of data, code and method versions behind each result. Limits: requires discipline to maintain.

  4. 04

    Open correction

    Published corrections with reasons and dates. Limits: requires a culture that values correction over reputation.

12Méthodes

Comment c'est étudié, et ce que les méthodes ne peuvent pas dire.

  1. Analyse décisionnelle en situation d'incertitudeChoix multicritère du traitement · Arbres de décision pour les plans de contingenceAppliqué ici
  2. Probabilités et statistiquesModélisation de la fréquence et de la gravité · Dépendance entre risques · Combinaison des données et du jugementAppliqué ici
  3. Quantification de l'incertitude et validation des modèlesPropagation de l'incertitude des entrées · Distinction des types d'incertitude · Cadrage de l'incertitude profondeAppliqué ici
13Where this page’s references

Where this page’s references lead.

Les organismes et documents à l'aune desquels cette page se lit. Les statuts et éditions changent ; chaque lien mène à l'organisme émetteur.

14Questions

Questions et réponses.

What does assurance mean in risk management?
An objective examination that gives a stated level of confidence that risk management, controls and governance operate as intended, provided by internal audit, external reviewers or other independent functions.
Why trace organisational factors in investigations?
Because the conditions that allowed a failure, such as design, staffing, incentives and procedures, usually outlast the individual event. Fixing only the immediate cause leaves them in place.
How are corrections handled on these pages?
Each correction to published evidence is recorded with its date, what changed and why, and earlier versions remain traceable, so readers can see how evidence evolved.
Why publish corrections openly?
Because others may have relied on the earlier result. A visible correction lets them check whether their conclusions still hold.
Is assurance the same as audit?
Audit is one form of assurance. Model validation, peer review and independent challenge are others.
Can the platform provide assurance on my risk management?
No. It does not audit, validate or certify any organisation’s risk management.
RapportsContribuer

Apportez des éléments de preuve depuis cette page.

Rapports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRIGestion des risques systémiquesScénarios et tests de résistanceMéthodes et techniquePortefeuille et préparation
Gestion des risques systémiques

Apportez une méthode, un jeu de données ou une question.

L'information et les demandes sont ouvertes dès aujourd'hui. Une demande reçoit une référence et indique l'étape suivante ; candidatures, paiements, allocations de calcul et inscriptions n'ouvrent que lorsque l'équipe, les conditions et la capacité d'examen existent.