- Indonesia 2026
- Chapter 5
Flood and landslide sequence across rice-growing islands
A conditional statement under stated assumptions, never a prediction.
Contents
- ·Edition home
- ·Executive summary
- 1Indonesia’s risk is climatic, geophysical and supply-linked at once
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Flood and landslide sequence across rice-growing islands
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
5.1Assumptions
Scenario SCN-IDN-FLD-01: what is assumed, and what is held constant.
- Baseline
- the 2026 reference state in this edition
- Drivers
- a prolonged heavy-rain season causing floods and landslides across several provinces during planting, while wheat imports are already near a record
- Analogues
- Sumatra, late December 2025 and January 202610; event records are otherwise a designed gap16
- Interventions
- none modelled; the specification describes the unmitigated case
- Run state
- narrative specification; quantified Foundry run scheduled for Q1 2027
5.2The cascade, step by step
- 1
CLI → WAT
heavy rain floods fields and settlements
Sumatra10
- 2
WAT → INF
landslides cut roads and power lines
Sumatra10
- 3
WAT → FOO
standing crops are lost and planting is delayed
Sumatra10
- 4
INF → HLT
access to clinics and supplies falls
expert input
- 5
TRD → FOO
import needs rise as domestic supply tightens
expert input
- 6
FOO → FIN
price pressure reaches household budgets
expert input
5.3The scenario as a table of steps
How the shock in scenario SCN-IDN-FLD-01 would travel through Indonesia’s coupled systems, step by step, under the assumptions the edition states.
| Step | What happens | Source |
|---|---|---|
| 01 Climate to water | Heavy rain floods fields and settlements. Analogue or source: Sumatra [10]. | Edition IDN, scenario SCN-IDN-FLD-01, step 1 |
| 02 Water to infrastructure | Landslides cut roads and power lines. Analogue or source: Sumatra [10]. | Edition IDN, scenario SCN-IDN-FLD-01, step 2 |
| 03 Water to food | Standing crops are lost and planting is delayed. Analogue or source: Sumatra [10]. | Edition IDN, scenario SCN-IDN-FLD-01, step 3 |
| 04 Infrastructure to health | Access to clinics and supplies falls. Analogue or source: expert input. | Edition IDN, scenario SCN-IDN-FLD-01, step 4 |
| 05 Trade to food | Import needs rise as domestic supply tightens. Analogue or source: expert input. | Edition IDN, scenario SCN-IDN-FLD-01, step 5 |
| 06 Food to finance | Price pressure reaches household budgets. Analogue or source: expert input. | Edition IDN, scenario SCN-IDN-FLD-01, step 6 |
A teaching model of a conditional scenario under the edition’s stated assumptions: not a forecast, not a prediction and not a warning. Sources: Indonesia 2026, scenario SCN-IDN-FLD-01 (2026); Indonesia 2026, references (NR-CIT-1) (2026).
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 10Food and Agriculture Organization (ed.), GIEWS Country Brief: Indonesia, reference date 29 January 2026. FAO, Rome. Observation year 2025 (production) and 2025/26 (imports). Accessed 3 November 2026. https://www.fao.org/giews/countrybrief/country.jsp?code=IDNback
- 16National Disaster Management Agency, BNPB (ed.), Indonesian Disaster Data and Information (DIBI). BNPB, Jakarta. Source for a designed gap; the page returned no data at evidence close. Observation year none bound. Accessed 3 November 2026. https://dibi.bnpb.go.id/back
