Draft, not yet released. In stewardship review. Not indexed until the first approved release.

Methodology

How the edition was made: methods, the model card, the evidence cut and its age, the acceptance record and the glossary.

14 min read0 figures13 tables19 notesNR-SECTOR-INFRASTRUCTURE-GLOBAL-2026-BASELINE

Contents
  1. ·Edition home
  2. ·Executive summary
  3. 1Infrastructure is what the other systems travel on
  4. 2Key findings
  5. 3Systems and sectors at baseline
  6. 4Risks and capability
  7. 5Chokepoint closure with port downtime and a cyber incident
  8. 6Readings from the other desks
  9. 7The 2027 agenda
  10. 8Systems in depth
  11. AMethodology
    1. A.1 Methods
    2. A.2 Model card, Infrastructure and Logistics Sector Model v0
    3. A.3 The baseline evidence cut
    4. A.4 Evidence age and coverage
    5. A.5 Evidence cards, two anchor sources
    6. A.6 Publication acceptance record
    7. A.7 Status words
    8. A.8 How the edition is made, released and corrected
    9. A.9 Glossary and abbreviations
    10. A.10 Technical annex
  12. BData appendix
  13. CReferences and record
  14. ·Complete edition, for print

A.1Methods

The global baseline uses published values and four simple derivations. Each is shown in full so that any reader can reproduce it.

Table A.1Methods
No.DerivationCalculationResult
(1)Growth of the average voyage haul, 2018 to 20245,245 ÷ 4,831about 1.09 times
(2)Daily Hormuz transits after a 97% fall129 × (1 − 0.97)about 4 a day
(3)Unfunded share of the 2040 need, 2017 outlook18 ÷ 97about 18.6%
(4)Transport share of official infrastructure flows, 202426.7 ÷ 78.7about 33.9%
Table A.2Coupling strength scale (matrix and model card)
StrengthDefinition
STRONGa disruption in the source system has historically changed the target system’s service or output within one season, in more than one region
MODERATEan effect is documented but buffered or slower
WEAKan effect is plausible but not documented at global scale
Table A.3Status grammar
LabelRule
Reportedvalue as issued by its source, with year
Inferredreasoned from cited evidence; never a measurement
EstimatedNexus analytical value with stated method
Scenarioconditional on stated assumptions
Expert inputstructured editorial judgement awaiting evidence

A.2Model card, Infrastructure and Logistics Sector Model v0

Model ID
MDL-GS09-INFRASTRUCTURE · v0.1
Purpose
represent the global infrastructure, transport and logistics system and its couplings to water, energy, food, health and biodiversity
Family
graph-based system of systems
Inputs
the cited sources of this edition; no proprietary data
Method
expert-specified coupling strengths (STRONG · MODERATE · WEAK) from assessments and analogue events
Validation
none yet, first validation against federation evidence in 2027
Uncertainty
qualitative; strengths are hypotheses, not measurements
Domain of validity
global scale; not for asset-, site- or country-level use
Reproducibility
strength table and sources published in this edition
20couplings

typed in v0

3strong

documented within one season

6moderate

documented, buffered

11weak

plausible, undocumented

A.3The baseline evidence cut

Every Nexus edition is published from a frozen evidence cut. The global baseline cut is documentary: it pins the exact edition of every source cited. Federation cuts begin with the first national Foundry cuts in 2027.

Cut ID
DC-SECTOR-INFRASTRUCTURE-GLOBAL-2026-B0
Type
baseline documentary cut
Resolution policy
pinned · as of 30 September 2026
Sources pinned
50 cited sources, each at the edition and access date in the references
Model runs
none at baseline, analytical values are stated with their method
Digest
computed at freeze and recorded in the publication record
Supersedes
nothing, first cut of the series
Superseded by
the 2027 infrastructure and logistics annual cut

Lineage

  1. 01

    source edition

  2. 02

    pinned citation

  3. 03

    finding

  4. 04

    page

  5. 05

    publication record

Table A.4From the baseline cut to the federation cut
ElementBaseline 20262027 global annual
Sourcescited global publications, pinned by editionnational, regional and sector cuts through one graph
Analysisstated methods and editorial estimatestyped analysis specifications
ModelsInfrastructure and Logistics Sector Model v0 specificationmodel runs with receipts
Findingstwelve baseline findingsfindings re-bound to federation evidence
Reviewfive passes scheduledfive passes on the exact digest

A.4Evidence age and coverage

A 2026 global edition rests on evidence observed in many different years. This page shows each time base, so that no single year label hides older evidence.

Table A.5Evidence age and coverage
IndicatorObservedReleasedCadenceNext release
Seaborne trade volume and ton-miles2024Review of 2025annualReview of Maritime Transport 2026
Hormuz transits2026March 2026ad hocUNCTAD tracking
Container port traffic2024WDI update of 8 October 2026annualnext WDI update
Air passengers on the World Bank series2023WDI update of 8 October 2026annualnext WDI update
Road traffic deaths2021Dec 2023; fact sheet Jul 2026periodicnext WHO report
Internet use2026Facts and Figures 2026annualFacts and Figures 2027
Official flows for infrastructure2024Apr 2026 inputsannualnext SDG report
Disruption cost to households and firms20192019one-offno update found
Global investment need20172017one-offno update found
Transport cyber incidents2021 to 2022Mar 2023periodicENISA Threat Landscape 2026
Table A.6Coverage by system at baseline
SystemCoverageThinnest dimension
Trade and portsGOODport waiting times and recovery
ChokepointsPARTIALposition after March 2026
Hazard exposureGOODasset condition and maintenance
Road safetyGOODreference year of the latest estimate
ConnectivityGOODservice quality and affordability
InvestmentPARTIALa current global need estimate
Rail and rural accessTHINglobal volume and access series
ResiliencePARTIALtested capabilities beyond rerouting
Table A.7Designed empty states: what is not bound, what would fill it and why
FieldSource that would fill itBlocker
Chokepoint transits at Hormuz, Suez, Bab el-Mandeb and Panama after March 2026, on a daily seriesIMF PortWatch daily series33; UNCTAD tracking44the PortWatch daily service returned an access error and the UNCTAD tracking was not opened
Position of the Strait of Hormuz and shipping at the evidence closeUNCTAD tracking44; monthly shipping reportsreleases after March 2026 were not retrieved; only search summaries were read
Review of Maritime Transport 2026UNCTADthe publication page returned not found on 2026-11-03; not yet issued or moved
Share of the rural population within 2 km of an all-season road (SDG 9.1.1)World Bank Rural Access Index50the custodian storyline in the SDG Extended Report is empty; not retrieved
Global rail passenger and freight volumesWorld Bank WDI rail series7; ITF34the World Bank rail series returned no values for 2018 to 2023 and the ITF page was not accessible
Air passengers for 2024 and 2025 on the airline basisICAO air transport statistics35the ICAO site was not accessible and the World Bank series ends in 2023
Reference year of the WHO estimate of 1.16 million road deathsWHO fact sheet12; next WHO status reportthe fact sheet states no reference year; the 1.19 million figure for 2021 is used
Condition and maintenance backlog of roads, bridges and ports outside the United Statesnational transport ministries; OECD and ITF34no consolidated global series found; the ASCE grade covers the United States only20
Current global infrastructure investment need and gapGlobal Infrastructure Hub; World Bankthe 2017 outlook is the latest estimate found21; later updates were not retrieved
Logistics performance values by economyWorld Bank Logistics Performance Index37the site was not accessible; no value is used and no economy is placed in an order
Cyber incidents on transport operations since 2022ENISA Threat Landscape 202645only the publication listing was read; the 2021 to 2022 report is used
Heat, flood and storm disruption of transport networks in 2026operator reports; weather services31not retrieved
Disaster losses to infrastructure on one basisUNDRR Global Assessment Report 202536the report page was not accessible; figures in search summaries are not used
Net-Zero Framework outcome after the October 2026 IMO sessionIMO press releases40the session took place after the retrieved material; not retrieved
Transport entities designated as critical in the EUnational authorities; Directive (EU) 2022/255739the legal text was not accessible and no designation list was found
Transport greenhouse gas emissions on one basisITF34; IEA38not retrieved; no figure is used
Seafarer, driver and port workforce supplyILO; IMO; national statisticsnot reviewed
Capability rungs beyond rerouting and advisoriesoperators, regulators, ministriesnot reviewed

A.5Evidence cards, two anchor sources

Issued by UN Trade and Development from shipping market data and port reports. Annual. Role: binds TRD-001 and TRD-003. UNCTAD also issued a separate rapid analysis for 2026 [2].

EVD-GS09-001

UNCTAD Review of Maritime Transport 20251

Issued by UN Trade and Development on 10 March 2026 from commercial shipping, energy and fertiliser data. One-off. Role: binds TRD-002. A later UNCTAD note gives about 95% for the fall in transits [4].

EVD-GS09-002

UNCTAD Strait of Hormuz Disruptions2

Table A.8Quality dimensions at baseline
DimensionEVD-GS09-001EVD-GS09-002
Completenessglobal fleet, trade and ports; modelled where data are missinga single strait for a few weeks
Timelinessabout 5 months after the yearissued within weeks of the event
Revisionannual editionlater notes give about 95%
Method transparencydata sources nameddata sources named on each chart
External validationcompared with commercial seriesbased on a commercial intelligence provider

Evidence cards to follow in 2027

  • UNCTAD1: port waiting times and call data
  • UNCTAD44: tracking series for 2026
  • World Bank7: air and rail series after 2023
  • ENISA45: transport incidents since 2022

A.6Publication acceptance record

Editorial self-check at evidence close. Every applicable item carries a disposition; the remaining items are review, approval and deposit.

Table A.9Publication acceptance record
GroupAreaItemsPassN/APending
D1Identity and scope8800
D2Source and data12912
D3Analysis and models12381
D4Findings and claims9801
D5Figures, tables, maps10622
D6Editorial and citations10802
D7Review and approval130013
D8Artefact and design12705
D9Registry and release9009

Publication gate

Conditions met
14 of 23 at evidence close
Blocking problems
none recorded
Open conditions
reviews, approval of the exact digest, deposit, registry pointer

Not applicable at baseline

Model runs
first runs in Q1 2027
Maps
plates in Q2 2027
Waivers
none

A.7Status words

Table A.10The status every value carries
StatusWhat it means
ObservedMeasured directly and published by the source.
ReportedPublished statistics of an official or institutional source.
DeclaredStated by the body concerned; not independently measured.
EstimatedA Nexus estimate from cited evidence, with its method in Annex A.
ModelledProduced by a stated model from cited inputs.
InferredReasoned from cited evidence; not measured.
ForecastA projection by the cited source.
SimulatedA simulation result under stated assumptions.
ScenarioA conditional statement under stated assumptions; never a prediction.
Expert inputExpert judgement, recorded with its basis.
CandidateProposed for a later edition; not yet evidence.
Evidence-quality levels (EQL 1 to 5) grade the source behind a value; they are not a score of the subject.

A.8How the edition is made, released and corrected

Every edition is built from a sealed evidence cut, reviewed under three keys, signed and deposited before any site shows it as published; corrections go to Nexus Standards as change proposals and feed the next cut.

StepWhat happensSource
01 Evidence arrives from the pillarsFoundry seals observations and indicator series, Universe hands over after-action and scenario findings, and contributions are screened at every gateway, including this site’s.
02 The cut is sealedOn the cut date the evidence is pinned under one identifier, so anyone can rebuild the edition from exactly what it was built on.
03 The edition is assembledThe edition is drafted from its template and content pack. Agents may draft; they never publish and never decide.
04 The keys turnAt the publisher of record the truth key comes first: every value is checked against its source or stated method before the meaning and capital keys turn. No edition moves on until every key has been turned by a named steward.
05 The gate opensA named approver releases one exact digest of the edition; any change after this point is a new version, never a silent edit.
06 Signed and depositedThe PDF, the web edition and the data bundle are signed together with a manifest and an RO-Crate description, and deposited on Zenodo with a concept and a version DOI.
07 Published on its desk’s siteOnly then does the edition show as published on its desk’s Reports site, and the Collection lists it as a part.
08 Corrections go to StandardsMethod and correction findings go to Nexus Standards as change proposals; citations, corrections and new contributions feed the next evidence cut.

A teaching model of the process, not a forecast and not a record of any run; dates and counts on this page come from the programme record. Sources: Reports governance at GCRI Canada (2026); Zenodo, repository of record for Reports deposits (2026).

Lifecycle, one state at a time: Draft, Computed, Evidence bound, Reviewed, Approved for release, Published, Corrected, Superseded. This edition is a draft.

A.9Glossary and abbreviations

Table A.11Series terms
TermMeaning
Baseline Editionthe inaugural annual edition that fixes the reference state for the series
WEFH+Binfrastructure and logistics, energy, food, health and biodiversity, the national nexus core
Couplinga typed dependency through which one system transmits to another
Protection gapthe share of losses not covered by insurance
Capability ladderLISTED → EXISTS → ADEQUATE → TESTED → DEMONSTRATED
EQLevidence-quality level, 1–5
Evidence cuta frozen resolution of exact sources and versions
NNC · NLC · NWGNational Nexus Consortium · National Leadership Council · National Working Groups
Table A.12Abbreviations used in this edition
AbbreviationExpansion
ACIAirports Council International
ASCEAmerican Society of Civil Engineers
ENISAEuropean Union Agency for Cybersecurity
IATAInternational Air Transport Association
ICAOInternational Civil Aviation Organization
IMOInternational Maritime Organization
ITFInternational Transport Forum
ITUInternational Telecommunication Union
NTSBNational Transportation Safety Board
SCFIShanghai Containerized Freight Index
TEN-Ttrans-European transport network
TEUtwenty-foot equivalent unit

A.10Technical annex

Table A.13Technical annex
ItemAnnexContentsStatus
A.1Indicator definitionsthe global indicator set, with units and sourcesIN THIS EDITION
A.2Coupling strengthsthe twenty-cell matrix and its rationaleIN THIS EDITION
A.3Scenario specificationSCN-GS09-HRM-01 assumptions and signpostsIN THIS EDITION
A.4Capability placementsrung evidence for fifteen functionsIN THIS EDITION
A.5Model diagnosticsfirst runs and validation2027
A.6Sensitivity analysesinfluence of coupling strengths2027
A.7Corridor and port notescards for the major shared chokepoints and corridorsWITH REGIONAL EDITIONS
A.8Review statementspass-by-pass review recordAT RELEASE

A.1 · indicator definition: daily ship transits through a chokepoint

Construct
number of ship transits counted in a day through a strait or canal
Unit
ships a day
Method
vessel position data from a commercial shipping intelligence provider, compiled by UNCTAD
Source
UNCTAD, Strait of Hormuz Disruptions, March 20262
Uncertainty
vessel classes and thresholds as defined by the provider; a later UNCTAD note gives a fall of about 95%4
Known limits
counts ships, not tonnage or cargo value; the 2026 series after March is not bound here

Notes

Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references

  1. 33UNVERIFIED, not opened: IMF (ed.), PortWatch daily chokepoint transit series; the daily service returned an access error and only a static chokepoint list was read, from which no figure is used. International Monetary Fund, Washington. Observation year 2026. Accessed 2026-11-03.back
  2. 44UNVERIFIED, not opened: UNCTAD (ed.), Strait of Hormuz tracking dashboard, launched April 2026; known only from search summaries. UN Trade and Development, Geneva. Observation year 2026. Accessed 2026-11-03.back
  3. 50UNVERIFIED, not opened: World Bank (ed.), Rural Access Index, SDG indicator 9.1.1; the custodian storyline in the SDG Extended Report is empty and the index was not retrieved. World Bank, Washington. Observation year 2023. Accessed 2026-11-03.back
  4. 7DATA VINTAGE AFTER CLOSE: World Bank (ed.), World Development Indicators, air transport passengers carried and freight (series IS.AIR.PSGR and IS.AIR.GOOD.MT.K1, ICAO source) and rail series (no values returned), API read, database last updated 2026-10-08. World Bank, Washington. Observation year 2023. Accessed 2026-11-03.back
  5. 34UNVERIFIED, not opened: ITF (ed.), ITF Transport Outlook 2023. International Transport Forum at the OECD, Paris; the page returned an access error and no figure is used. Observation year 2023. Accessed 2026-11-03.back
  6. 35UNVERIFIED, not opened: ICAO (ed.), Air transport statistics and The World of Air Transport; the site returned an access error and no figure from it is used. International Civil Aviation Organization, Montreal. Observation year 2025. Accessed 2026-11-03.back
  7. 12WHO (ed.), Road traffic injuries, fact sheet updated 20 July 2026 (about 1.16 million deaths a year; 92% in low- and middle-income countries; reference year not stated). World Health Organization, Geneva. Observation year not stated on the page. Accessed 2026-11-03.back
  8. 20ASCE (ed.), 2025 Report Card for America’s Infrastructure (summary page: overall grade C, grades from B in ports to D in stormwater and transit, USD 3.6 trillion investment gap over ten years). American Society of Civil Engineers, Reston. Observation year 2025. Accessed 2026-11-03.back
  9. 21Global Infrastructure Hub (ed.), Global Infrastructure Outlook, press release of 25 July 2017 (USD 94 trillion need to 2040, USD 97 trillion with SDG access targets, USD 18 trillion unfunded). Global Infrastructure Hub, Sydney. Observation year 2017. Accessed 2026-11-03.back
  10. 37UNVERIFIED, not opened: World Bank (ed.), Connecting to Compete 2023: Trade Logistics in the Global Economy, the Logistics Performance Index; the site was not accessible and no value is used. World Bank, Washington. Observation year 2023. Accessed 2026-11-03.back
  11. 45UNVERIFIED, not opened: ENISA (ed.), ENISA Threat Landscape 2026, published 22 September 2026; only the listing entry was read. European Union Agency for Cybersecurity, Athens. Observation year 2025. Accessed 2026-11-03.back
  12. 31WMO (ed.), State of the Global Climate 2025, press release of 23 March 2026 (2025 about 1.43 °C above the 1850 to 1900 average). World Meteorological Organization, Geneva. Observation year 2025. Accessed 2026-11-03.back
  13. 36UNVERIFIED, not opened: UNDRR (ed.), Global Assessment Report on Disaster Risk Reduction 2025, Resilience Pays: Financing and Investing for our Future; the page was not accessible and no figure from search summaries is used. UN Office for Disaster Risk Reduction, Geneva. Observation year 2025. Accessed 2026-11-03.back
  14. 40UNVERIFIED, not opened: POST-CLOSE, context only: IMO (ed.), Marine Environment Protection Committee, extraordinary session of October 2025 and the session of October 2026 on the Net-Zero Framework; only the DNV summary [27] was opened. International Maritime Organization, London. Observation year 2026. Accessed 2026-11-03.back
  15. 39UNVERIFIED, not opened: Directive (EU) 2022/2557 of the European Parliament and of the Council on the resilience of critical entities, Official Journal of the European Union, 2022; the legal text returned a challenge page and the transport scope is cited from a search summary. Observation year 2022. Accessed 2026-11-03.back
  16. 38UNVERIFIED, not opened: IEA (ed.), Global EV Outlook 2026; the page was not accessible and figures from news summaries are not used. International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
  17. 1UNCTAD (ed.), Review of Maritime Transport 2025: Staying the course in turbulent waters (full report and overview). UN Trade and Development, Geneva. Observation year 2024. Accessed 2026-11-03.back
  18. 2UNCTAD (ed.), Strait of Hormuz Disruptions: Implications for Global Trade and Development, rapid analysis dated 10 March 2026, from Clarksons Research, EIA, LSEG, Kpler and other data. UN Trade and Development, Geneva. Observation year 2026. Accessed 2026-11-03.back
  19. 4UNCTAD (ed.), Hormuz disruption shows why early-warning data matters, news item (about 95% fall in ship transits; tracking tool described). UN Trade and Development, Geneva. Observation year 2026. Accessed 2026-11-03.back

Cite this annex

Valadbaygi, S. (Ed.). (2026). Annex A: Methodology. In Global Infrastructure and Logistics Risk and Resilience Report 2026: Baseline Edition, The State of the World’s Infrastructure, Transport and Logistics. (Baseline Edition 2026, Report No. NR-SECTOR-INFRASTRUCTURE-GLOBAL-2026-BASELINE) [Draft under review]. The Global Centre for Risk and Innovation (GCRI).

Every citation form of the whole report, BibTeX and RIS included, is on the edition home. Cite this report

ReportsContribute

Send evidence or a correction on Global Infrastructure, Transport and Logistics.

Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the Global Centre for Risk and Innovation (GCRI) Systems Evidence desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.

GCRI Systems Evidence deskGlobal Sector Risk and Resilience

CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.

The Global Centre for Risk and Innovation

Science · evidence · measurement

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GCRI is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.