GCRI · Registry
État du programme
A programme status such as planned, active, paused or closed is a short word that readers take as a long claim. They infer funding, staffing, delivery and even results from it, though the word asserts none of these on its own. This page sets out what a status assertion records, who may make and change it, how statuses drift away from the programme they describe, and what a funder, auditor or partner needs to see before relying on one.
Comment le travail se déroule.
Registre des enregistrements
Programme status · Registry · Ledger head 4520089
- Enregistrements inscrits3446
- Provenance complète, % des enregistrements93Normal
- Corrections ouvertes15Surveillance
- Suspensions de droits0Info
Derniers enregistrements
| NX-R-20740 | État du programme | v2 | 3557271 | Enregistré |
| NX-P-99526 | Publication | v1 | 9568898 | Enregistré |
| NX-E-98224 | Dossier de preuves | v2 | 2471930 | Correction ouverte |
| NX-C-85422 | Participation | v1 | 7123058 | Suspension des droits |
Historique des versions
- v1NEWEnregistré avec ses sources
- v2FIXUnité corrigée, motif consigné
- v3OPENCorrection demandée
Fig.Record ledger: example names and illustrative values, not a record or a live system.
Programme status: how the risk develops.
What a programme state does and does not mean. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
Status outlives its evidence
A status is set at one moment and then left. Staff move, funding lapses or a phase ends, but the record still reads active. Without a review date and a named owner, an unchanged status cannot be told apart from a confirmed one.
Target read as delivery
Registries often hold planned scope beside actual progress. When a design target, a launch announcement or a pilot sits under the same status as an operating service, readers take intention for implementation, and implementation for a verified outcome.
Vocabulary drift
Each partner uses its own words: open, live, ongoing, in delivery. When records are merged without a controlled list and a crosswalk, one status means different things in different rows, and counts across the registry stop being comparable.
Reliance cascades
Funders schedule tranches, partners commit staff and reviewers cite the programme as evidence of capacity, all from the status field. A stale or inflated status therefore travels into budgets, reputations and later audit findings far from where it was entered.
How programme status is modelled, measured and tested.
Le modèle, ses hypothèses, ses données et son incertitude, sous la forme qu'un scientifique ou un ingénieur vérifierait. Les structures suivent des méthodes publiées. Les valeurs représentées sont illustratives, ce ne sont pas des résultats.
Jeux de données et provenance
The data classes behind programme status and what is recorded about each before it is used.
| Classe de données | Provenance consignée | Résolution indiquée | Licence vérifiée |
|---|---|---|---|
| Imagerie satellitaire, optique et radar | capteur, niveau de traitement, date d'acquisition | taille de pixel et revisite | par scène |
| Réanalyses et sorties de modèles climatiques | modèle, expérience, membre, version | grille et pas de temps | par publication |
| Capteurs et stations de mesure in situ | station, instrument, fiche d'étalonnage | point et fréquence d'échantillonnage | par réseau |
| Exposition de la population et des actifs | méthode, millésime, sources d'entrée | taille et unité de la cellule | par publication |
| Limites et géographie de référence | producteur, édition, date | échelle | par édition |
- Lignage
- Enregistrement W3C PROV de la source à la figure
- Principes
- FAIR : faciles à trouver, accessibles, interopérables, réutilisables
- Lacunes
- affiché comme manquant, jamais complété en silence
Status records keep each domain’s work honest about what exists.
- EauEn pratiqueA basin study listed as planned is not shown as under way.What a reader can checkStatus and the record behind it
- SantéEn pratiqueA surveillance analytics capability is described by purpose until verified.What a reader can checkVerification evidence
- ÉnergieEn pratiqueA grid study waiting for operator data says so.What a reader can checkBlocking dependency stated
Status records feed the série Foundry Build and Readiness. Each status would carry a contextual identifier under NS-9 of the proposed Nexus Standards; readiness is never authority or approval.
- Corrections where a status is wrong.
- Requests to see the record behind a status.
Comment le processus se déroule.
Processus
Programme status: Edition from scope to correction
Each country agrees profile scope before Q1; G6 authorises release, and a correction is a new version, never a silent change.
01 Scope and draft
- 01Profile scope agreed before Q1Record · The country programmeEach country agrees its profile scope before Q1, and nothing outside it is published. Regional profiles never override a country’s findings.
- 02RédactionStep · Series editorsSeries editors lead each edition under the series method. National Working Groups draft country-edition sections for review.
- 03Evidence cutoff and labelsEnregistrementEach edition states its evidence cutoff. Observed, modelled and estimated evidence stay apart.
02 Examen
- 04Review on methodGate · Qualified, conflict-managed reviewersFindings are accepted on method by conflict-managed reviewers. The review may send the draft back for revision.
- 05Examen de la sécurité de publicationJalonPublic-safe review is the gate before any release. A report may be cleared for limited circulation or for publication.
03 Authorise and release
- 06G6 · Publication autoriséeJalon · le Global Risks ForumLe GRF autorise la publication des résultats qui ont passé l'examen scientifique et éditorial. Il ne peut pas publier de données personnelles.
- 07Release with identifiersEnregistrement · ReportsEvery edition carries a DataCite persistent identifier and a UNI under NS-1. The programme publishes one edition each quarter.
04 Correct
- 08Correction as a new versionStep · ReportsA correction produces a new version of an edition. The earlier version stays on record with the correction history.
Rapports · The programme year · Identifiers and recordsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. No edition has been released and none is on record.
Ce qui est mesuré, et avec quelle qualité.
Chaque indicateur porte son unité, sa périodicité, le type de source qui le sous-tend et l'étiquette de preuve que porterait une valeur. Aucune valeur n'est affichée : un programme les fournit sous sa propre autorité.
| Indicateur | Unité | Cadence | Type de source | Étiquette |
|---|---|---|---|---|
| Programme records with a named status owner | share of programme records | trimestriel | Registry record audit | OBSERVÉ |
| Time since last attested status change | jours | continu | Record timestamps | OBSERVÉ |
| Owner attestation currency | share of records attested within the review cycle | trimestriel | Steward attestations | DÉCLARÉ |
| Status assertions with linked evidence | share of status assertions | mensuel | Evidence link check | OBSERVÉ |
| Status vocabulary conformance | share of records using the controlled list | mensuel | Schema validation | OBSERVÉ |
| Agreement with funder award records | share of programmes matching the funder’s status | annuel | Funder grant records | Statistiques publiées |
| Planned against reported milestone completion | ratio of reported to planned milestones | per milestone | Programme reports | DÉCLARÉ |
| Status changes later reversed or corrected | count per reporting period | trimestriel | Correction trail | OBSERVÉ |
D'où proviennent les données probantes.
Jeux de données publics et registres institutionnels nommés, chacun avec sa catégorie de licence. Les sources fournies dans le cadre d'accords ne sont utilisées que selon leurs conditions et ne sont jamais republiées.
| Source | Ce qu'elle apporte | Catégorie de licence |
|---|---|---|
| IATI Standard and its activity status codelist | Machine-readable programme records from development and humanitarian publishers, with a controlled list of activity states | Open data, licence set by each publisher |
| CORDIS | Project records, participants, dates and reported results for EU-funded research and innovation programmes | Free reuse with attribution under the European Commission reuse policy |
| NIH RePORTER | Award records, project periods and linked publications for United States federally funded research | Domaine public |
| UKRI Gateway to Research | Grants, organisations, people and reported outcomes from UK Research and Innovation | Open Government Licence |
| Crossref grant identifiers | Persistent identifiers and metadata deposited by funders for individual awards | Open metadata, no restrictions on reuse |
| Research Activity Identifier (RAiD, ISO 23527) | A persistent identifier and metadata record for a project across its lifetime, linking people, organisations and outputs | Open metadata, terms of each registration agency |
Qui décide, et à quoi servent les données probantes.
Registry prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.
| Qui décide | La question | Données probantes servies par cette page |
|---|---|---|
| Funders’ programme officers | Whether to release the next tranche, extend or close an award | Status with its attestation date, linked milestone evidence and agreement with the funder’s own award record |
| Programme stewards and boards | When to change a status, and who must confirm the change | Status definitions, the evidence each state requires and the history of earlier changes |
| Auditeurs internes et externes | Whether reported status matched the programme’s actual state over the audit period | Time-stamped status history, correction trail and the evidence linked at each change |
| Partner institutions | Whether to commit staff, data or co-funding to a programme | Current status with owner, scope boundaries and the difference between planned and delivered work |
Résultats que produit ce thème
- A status glossary defining each programme state, what it asserts and what it does not
- Programme record views showing the status owner, the date of last attestation and linked evidence
- A status history for each programme with every change, its author and its stated reason
- Crosswalks between partner status vocabularies and the controlled list
What experts ask about programme states.
- What is the minimum evidence for each state, and who must hold it?
- How can a vocabulary stay stable across institutions, languages and legal systèmes?
- How should a status separate the existence of a programme from the quality of its work?
- What happens to a status when its evidence lapses, is challenged or is withdrawn?
- How are past states preserved so that history cannot be rewritten?
Why status claims drift.
Status inflation is a well-documented pattern in programme reporting. Organisations describe intentions as commitments, memoranda as agreements and pilots as operations, often without bad faith, because incentives reward visible progress. Each restatement in a press release, slide or directory strips a little more context, until a programme in exploration is cited as active. The drift is compounded when different institutions use the same word for different things.
Records practice counters this with three disciplines: a controlled vocabulary with written definitions, a rule that each state is tied to a named type of evidence, and an append-only history so that every change is dated and attributable. The Registry applies these to its seven published states, from exploration to historical record, set out on états de programme.
How states are recorded, and what they cannot show.
- 01
Controlled vocabulary
Each state has a definition and a statement of what it does not mean, kept as a versioned glossary.
- 02
Evidence binding
A state is linked to the record that supports it, such as a constituting decision or a closeout record, with its issuer and date.
- 03
Event history
Changes are recorded as events, so the state on any past date can be reconstructed.
- 04
Limites
A status shows formal standing, not effectiveness, quality or compliance. Evidence held privately can only be described, not shown, so readers rely on the issuer’s authority for it.
Comment c'est étudié, et ce que les méthodes ne peuvent pas dire.
- 01Ingénierie, interopérabilité et intendance des donnéesIngestion validée par schéma · Rapprochement des identifiants pérennes · Capture de la filiation dans les chaînes de traitementAppliqué ici
- 02Identité numérique et systèmes numériques publicsAuthentification et autorité de l'émetteur · Désambiguïsation des contributeurs par la personne elle-mêmeAppliqué ici
- 03Cybersécurité et cryptographieHistorique des enregistrements inviolable · Exports et publications signés · Modélisation des menaces sur les voies de modificationAppliqué ici
Where this page’s references lead.
Les organismes et documents à l'aune desquels cette page se lit. Les statuts et éditions changent ; chaque lien mène à l'organisme émetteur.
Questions et réponses.
Does an active status mean a programme is delivering results?
Who can change a programme’s status?
Why does a status carry a date of last attestation?
How do partner status terms map to the registry’s list?
Does an active programme have approved findings?
Can a country listing imply a programme exists there?
What if a recorded state is wrong?
Apportez des éléments de preuve depuis cette page.
Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.
- E-mailPasserelle GW-GCRIL'envoyer depuis cette pageUne preuve, une correction, un cas, une méthode, un examen, une traduction ou un apport au profil. Elle arrive étiquetée avec cette page, afin que le rédacteur responsable la reçoive.
- ZenodoDépôt ouvertLe déposer et le soumettre à la communautéPubliez votre propre fiche sur Zenodo avec votre identifiant ORCID, puis soumettez-la à la communauté Reports qui s'y trouve. Des curateurs l'examinent ; le DOI reste le vôtre.
- RapportsGCRIVoir toutes les façons de contribuerLes types de contribution, la manière dont chacune est examinée, la reconnaissance accordée, la licence et ce qui n'est jamais accepté.
N'envoyez jamais de données personnelles, de détails sensibles sur des infrastructures ni rien que vous n'avez pas le droit de communiquer. Une contribution est examinée avant utilisation ; son envoi ne confère ni qualité d'auteur ni droits éditoriaux, et un parrainage n'achète jamais une conclusion.
Apportez une méthode, un jeu de données ou une question.
L'information et les demandes sont ouvertes dès aujourd'hui. Une demande reçoit une référence et indique l'étape suivante ; candidatures, paiements, allocations de calcul et inscriptions n'ouvrent que lorsque l'équipe, les conditions et la capacité d'examen existent.
Documents juridiques.
Les cartes, données et chiffres de ce site sont présentés à titre de contexte et d'information générale. Ils ne constituent ni des conseils, ni des prévisions, ni des alertes ; les limites de l'information sont exposées dans les Avertissements et les Notices sur les données.
