- Africa 2026
- Chapter 8
Systems in depth
One section per system: its state at evidence close, its exposures and what the operational series will watch.
Contents
- ·Edition home
- ·Executive summary
- 1Africa’s risk travels through rivers, rains and power systems
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Failed rainy season with power and food stress across eastern and southern Africa
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
8.1Member countries: the baseline regional chapter
The three member countries named in the series registry, read side by side on the same indicators. The African Union is a separate subject: it appears only as a reference group, and no figure here is a union total.
| Member | State at baseline | Evidence | Status |
|---|---|---|---|
| South Africa | population 64.0 million; GDP USD 401.1 billion; access 87.7%; carbon dioxide 427.3 Mt; freshwater withdrawal 47.1%; protected 9.5%; no load shedding since 16 May 2025 | 3456111229 | Reported |
| Kenya | population 56.4 million; GDP USD 120.4 billion; access 76.2%; carbon dioxide 21.3 Mt; undernourishment 36.4%; protected 14.0%; renewables 78.1% of electricity and 67.7% of final energy in 2021 | 3456891012 | Reported |
| Senegal | population 18.5 million; GDP USD 32.2 billion; access 74.2%; carbon dioxide 13.7 Mt; protected 26.3%; first gas December 2024 | 34561231 | Reported |
| African Union reference group | no union total is shown; Agenda 2063 frames the continent over 50 years from 2013 | 33 | Reported |
Couplings across members
- CLI → WAT → FOO across eastern and southern Africa
- WAT → ENE hydropower on shared reservoirs
- FOO ← CLI hunger in drought years
- FIN ← CLI losses carried by households and public budgets
Evidence to bind in 2027
- member emissions including land use
- flood and drought loss series by member
- electricity mix after 2021
8.2Shared basins and grids: the baseline regional chapter
Shared basins, power systems and gas fields carry risk across borders. This chapter names each system, the members involved and the evidence read at baseline. Rows without a source are designed empty states.
| Basin | Members involved | Evidence | Status |
|---|---|---|---|
| Senegal River | Senegal; Guinea, Mali and Mauritania are outside the member set | 30 | Reported |
| Nile basin and Lake Victoria headwaters | Kenya; member share not bound; no source read | 32 | NOT BOUND |
| Orange-Senqu | South Africa; member share not bound; no source read | 32 | NOT BOUND |
| Limpopo | South Africa; member share not bound; no source read | 32 | NOT BOUND |
| Grid | Members involved | Evidence | Status |
|---|---|---|---|
| South African national grid | Eskom reports 490 days without load shedding to 20 September 2026 and year-to-date availability of 67.96% | 2829 | Reported |
| Southern African power exchange | South Africa; flows and capacity not bound | 42 | NOT BOUND |
| Eastern African power exchange | a press report says Kenya imports power from neighbours; not opened and no figure used | 52 | NOT BOUND |
| West African power exchange | Senegal; flows and capacity not bound | 42 | NOT BOUND |
| Offshore gas field | Greater Tortue Ahmeyim: first gas 31 December 2024; Phase 1 about 2.3 Mtpa; shared by Senegal and Mauritania | 3141 | Reported |
Couplings through shared systems
- CLI → WAT → ENE low flow into hydropower
- INF → ENE a plant failure reaching industry and households
- WAT → FOO irrigation and flow
- TRD → FIN gas revenue into public budgets
Evidence to bind in 2027
- basin area and member shares
- cross-border power flows and capacity
- irrigation withdrawals
8.3Hub list: the baseline regional chapter
The hubs the series registry names for this region and for its member countries. The list is read from the registry, so a change there changes this page.
Registry
- Regional hubs
- Dakar · Nairobi · Pretoria
- Desks with a remit
- The Global Centre for Risk and Innovation (GCRI) · the Global Risks Forum (GRF) · GRX
- Registry record
- NR-REGIONAL-AFR-2026-BASELINE-v1.0.0
| Hub | Member | Registry role | Member edition |
|---|---|---|---|
| Pretoria | South Africa | G20 · hub | in preparation |
| Dakar | Senegal | Hub | in preparation |
| Nairobi | Kenya | Hub | in preparation |
What a hub does in this series
- Hub terms of reference are not set at baseline
- Hub contact points are not named at baseline
- The registry names the hubs and the desks with a remit; working arrangements follow from Q1 2027
8.4Regional pathway: the baseline regional chapter
The regional pathway is the route through which the series will read Africa as one region from 2027. This page states what exists today and what comes next. It does not describe any body that has not been constituted.
| Stage | What exists today | State | Next |
|---|---|---|---|
| Regional hubs | Dakar, Nairobi and Pretoria are named in the series registry | NAMED | terms set from Q1 2027 |
| Desks | GCRI, GRF and GRX hold the remit for regional editions in the registry | NAMED | work plan for Q1 2027 |
| Evidence graph | member and regional findings share identifiers | PREPARED | first sealed cut NQ-REG-AFR-2027-Q1 |
| Member editions | South Africa in preparation; Senegal in preparation; Kenya in preparation | MIXED | review through the chain before release |
Open at baseline
- Constitution of any regional council or working group
- Hub terms of reference and contact points
- The route to the African Union edition in the series
- Which further African states receive member entries
Decisions that rest elsewhere
- Energy, water and health policy rest with national authorities and basin organisations
- Continental frameworks are set by the African Union and its members; this edition cites them and decides nothing
- The African Union subject has its own edition and is not merged with Africa on code
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 3World Bank (ed.), World Development Indicators, Population, total (SP.POP.TOTL), South Africa, Kenya, Senegal and Sub-Saharan Africa, as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2024. Accessed 2026-11-03.back
- 4World Bank (ed.), World Development Indicators, Access to electricity, % of population (EG.ELC.ACCS.ZS), South Africa, Kenya, Senegal and Sub-Saharan Africa, as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2023. Accessed 2026-11-03.back
- 5World Bank (ed.), World Development Indicators, GDP, current US dollars (NY.GDP.MKTP.CD), South Africa, Kenya, Senegal and Sub-Saharan Africa, as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2024. Accessed 2026-11-03.back
- 6World Bank (ed.), World Development Indicators, Carbon dioxide emissions excluding LULUCF, Mt CO2e (EN.GHG.CO2.MT.CE.AR5), South Africa, Kenya, Senegal and Sub-Saharan Africa, as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2023. Accessed 2026-11-03.back
- 11World Bank (ed.), World Development Indicators, Annual freshwater withdrawals, total, % of internal resources (ER.H2O.FWTL.ZS), South Africa, Kenya, Senegal and Sub-Saharan Africa (Kenya and Senegal values repeat across years), as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2022. Accessed 2026-11-03.back
- 12World Bank (ed.), World Development Indicators, Terrestrial protected areas, % of total land area (ER.LND.PTLD.ZS), South Africa, Kenya, Senegal and Sub-Saharan Africa, as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2024. Accessed 2026-11-03.back
- 29South African Government News Agency (ed.), Eskom continues to record progress (20 September 2026: 490 consecutive days without load shedding; year-to-date EAF 67.96%). SAnews, Pretoria. Observation year 2026. Accessed 2026-11-03.back
- 8World Bank (ed.), World Development Indicators, Renewable electricity output, % of total electricity output (EG.ELC.RNEW.ZS), South Africa, Kenya, Senegal and Sub-Saharan Africa (values for 2022 to 2024 are null), as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2021. Accessed 2026-11-03.back
- 9World Bank (ed.), World Development Indicators, Renewable energy consumption, % of total final energy consumption (EG.FEC.RNEW.ZS), South Africa, Kenya, Senegal and Sub-Saharan Africa (group value is for 2020), as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2021. Accessed 2026-11-03.back
- 10World Bank (ed.), World Development Indicators, Prevalence of undernourishment, % of population (SN.ITK.DEFC.ZS), South Africa, Kenya, Senegal and Sub-Saharan Africa, as served by the World Bank indicators interface on the access date. World Bank, Washington DC. Observation year 2023. Accessed 2026-11-03.back
- 31World Oil (ed.), First gas achieved at Greater Tortue Ahmeyim LNG project, offshore West Africa (2 January 2025; first gas 31 December 2024; Phase 1 about 2.3 million tonnes a year). World Oil, Houston. Observation year 2024. Accessed 2026-11-03.back
- 33African Union Commission (ed.), Agenda 2063: overview (framework for socio-economic transformation over 50 years from 2013, with 10-year implementation plans). African Union, Addis Ababa. Observation year 2013. Accessed 2026-11-03.back
- 1WMO (ed.), State of the Climate in Africa 2024 (press release and report page, published 12 May 2025: temperature, drought, cereal yields, floods, marine heatwaves). WMO, Geneva. Observation year 2024. Accessed 2026-11-03.back
- 2FAO, IFAD, UNICEF, WFP and WHO (eds.), The State of Food Security and Nutrition in the World 2025 (joint release page, 28 July 2025: Africa 307 million in hunger, above 20%). WHO, Geneva, for the partner agencies. Observation year 2024. Accessed 2026-11-03.back
- 34UNVERIFIED, not opened: Statistics South Africa (ed.), Mid-year population estimates 2025 (release of 28 July 2025: 63,100,945 people, from search summaries; differs from the World Bank 2024 value of 64,007,187). Stats SA, Pretoria. Observation year 2025. Accessed 2026-11-03.back
- 35UNVERIFIED, not opened: Agence nationale de la statistique et de la démographie (ed.), Rapport sur la population du Sénégal 2025 (19,075,959 people, from search summaries; the page returned an error; the United Nations projection of about 18.9 million differs). ANSD, Dakar. Observation year 2025. Accessed 2026-11-03.back
- 30African Manager (ed.), OMVS: une capacité hydroélectrique de 400 MW (statement of the OMVS High Commissioner: Manantali 200 MW, Félou 60 MW, Gouina 140 MW; members Guinea, Mali, Mauritania, Senegal). African Manager, Casablanca. Observation year 2025. Accessed 2026-11-03.back
- 32Environmental Peacebuilding (ed.), State of Africa’s Environment: Transboundary tension (republication of an article of 15 September 2024; 63 basins, about 62% of land area, about 90% of surface water; the underlying report is not named on the page). Environmental Peacebuilding Association. Observation year 2024. Accessed 2026-11-03.back
- 28Eskom Holdings (ed.), Power system remains stable with 105 consecutive days without loadshedding (media statement, 29 August 2025). Eskom, Johannesburg. Observation year 2025. Accessed 2026-11-03.back
- 42UNVERIFIED, not opened: International Energy Agency (ed.), Africa Energy Outlook 2022. IEA, Paris. Observation year 2022. Accessed 2026-11-03.back
- 52UNVERIFIED, not opened: Zawya (ed.), Why Kenya depends on Ethiopia and Uganda for power (press report on imports within the Eastern Africa power exchange; no figure used). Zawya, Dubai. Observation year 2025. Accessed 2026-11-03.back
- 41UNVERIFIED, not opened: Kosmos Energy and bp (eds.), Greater Tortue Ahmeyim project records (commercial operations 2025; second phase not yet decided, from press summaries). Kosmos Energy, Dallas. Observation year 2025. Accessed 2026-11-03.back