The 2027 agenda
Eight bounded questions open the 2027 climate technology agenda. Each comes from a baseline finding, names the initiative that will carry it and the first output due in the 2027 climate technology edition.
Contents
- ·Edition home
- ·Executive summary
- 1Climate technology is infrastructure with a measurement problem
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Planned storage outruns delivered storage
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
7.1Questions for the operational series
- C-01
How much durable storage is planned, permitted and actually injecting, by country?
INI-XT17-STO-01 · planned and delivered storage; first output: storage register.
- C-02
What do capture and direct air capture plants need in power and water per tonne?
INI-XT17-ENE-02 · energy and water footprint; first output: footprint estimates by plant type.
- C-03
Which sorbents, minerals, biomass and fabrication steps are single points of failure?
INI-XT17-MAT-03 · materials and biomass; first output: dependence map.
- C-04
How can delivered removal be counted on one registry basis, with uncertainty?
INI-XT17-MRV-04 · removal on a common basis; first output: reconciliation table.
- C-05
How does actual annual capture compare with design capacity?
INI-XT17-CAP-05 · capture against capacity; first output: operator reporting overlay.
- C-06
Which national and regional rules set quality criteria for removal credits?
To be admitted in 2027; first output: rule overlay.
- C-07
What workforce exists for capture, storage and removal projects?
To be admitted in 2027; first output: scoping note.
- C-08
Which readiness capabilities have been tested in real projects, and which are only planned?
Readiness capability register; first output: rung evidence for 15 functions.
7.2Portfolio proposed for the Q1 2027 alignment
Five initiatives and one Universe mission candidate are proposed for the 2027 climate technology portfolio. They are programme objects: no partner, funder or member is attached to them in this edition.
| ID | Object | Kind | Question | State |
|---|---|---|---|---|
| INI-XT17-STO-01 | Planned and delivered storage | Initiative | C-01 | PROPOSED |
| INI-XT17-ENE-02 | Energy and water footprint | Initiative | C-02 | PROPOSED |
| INI-XT17-MAT-03 | Materials and biomass | Initiative | C-03 | PROPOSED |
| INI-XT17-MRV-04 | Removal on a common basis | Initiative | C-04 | PROPOSED |
| INI-XT17-CAP-05 | Capture against capacity | Initiative | C-05 | PROPOSED |
| MSN-XT17-2027-01 | Storage delivery Universe mission | Mission | C-01 | Candidate |
7.3The pathway
The climate technology edition reads national readiness chapters, the coupled sector reports on energy, climate and minerals, and the global edition through one governed evidence graph. At baseline the federation is designed; the global energy and lifeline editions are drafted. This page states what exists today and what comes next.
- 01
National readiness chapters
climate technology and carbon management readiness in each national edition
IN PREPARATION · national baselines
- 02
Sector couplings
GS-02 energy · GS-07 climate · SR-04 minerals
GS-02 DRAFTED · sector baselines
- 03
Technology system model
capture, storage, removal, power, markets, governance
v0 SPECIFIED · v1 with federation evidence
- 04
Strategic links
SR-02 lifeline systems · SR-13 strategic technology
PLANNED · strategic baselines
- 05
Universe
annual proving environment
CANDIDATE MISSION · mandate in 2027
- 06
XT-17 report
this series
BASELINE DRAFT · 2027 annual edition
- 07
Evidence and correction
one graph, many projections
OPEN · first correction cycle in 2027
7.4Universe 2027: evidence pack for the climate technology candidate mission
- 01
Mandate
- 02
Core Build · 1 month
- 03
Action · 1 week
- 04
Evidence seal
- 05
Portfolio correction
- 06
Next mandate
| Item | Record | State | Timing |
|---|---|---|---|
| F1 | Annual mandate record | PLANNED | after the Q2 2027 alignment |
| F2 | Core Build record | PLANNED | one month before the exercise |
| F3 | Exercise evidence | PLANNED | during the Action week |
| F4 | Decision packets | PLANNED | exercise state only |
| F5 | Proof receipts | PLANNED | scoped to each recorded check |
| F6 | After-action report | PLANNED | within one quarter |
| F7 | Upgrade docket | PLANNED | routed to the Portfolio |
| F8 | Portfolio renewal | PLANNED | 2027 global annual edition |
| F9 | Public synthesis | PLANNED | public-safe extracts only |
Mission
- ID
- MSN-XT17-2027-01 · Storage delivery Universe mission
- Role spine
- Leadership sponsor · Institutional anchor · Mission lead: drawn from national pathways
- Receiving actors
- to be identified with the mandate
7.5Handoffs and routing
Where the baseline’s findings go next. A handoff routes a finding for awareness, review or work; it transfers no authority.
| Finding | Routed to | Purpose | Class |
|---|---|---|---|
| CLI-001 · temperature 2025 | INI-XT17-MRV-04 | removal on a common basis | PUBLIC |
| CLI-002 · budget | INI-XT17-STO-01 | planned and delivered storage | PUBLIC |
| ENE-003 · solar growth | INI-XT17-ENE-02 · key F review | energy and water footprint | PUBLIC |
| INF-005 · capture status | INI-XT17-CAP-05 | capture against capacity | PUBLIC |
| INF-006 · Brevik and storage | INI-XT17-STO-01 | planned and delivered storage | PUBLIC |
| CLI-007 · removal inventory | INI-XT17-MRV-04 | removal on a common basis | PUBLIC |
| FIN-010 · pricing | INI-XT17-MAT-03 | materials and biomass | PUBLIC |
| SYS-012 · compound pathway | MSN-XT17-2027-01 | Universe candidate | CONSORTIUM |
| Class | Where it goes | Who can see it |
|---|---|---|
| PUBLIC | the published edition and its evidence bundle | anyone |
| CONSORTIUM | governed rooms of the federation | consortium members under agreement |
| CONTROLLED | need-to-know channels | named competent actors only |
7.6Feeds and signal register
| Feed | Producer | Latency | Feeds into |
|---|---|---|---|
| Copernicus and NOAA monthly climate and CO2 pages | agencies | monthly | CLI-001 |
| Global Carbon Project annual budget | research project | annual | CLI-002 |
| Ember electricity reviews | think tank | annual | ENE-003 |
| Global CCS Institute status pages | institute | annual | INF-005 |
| State of CDR and removal dashboards | research group and dashboard | periodic | CLI-007 |
| World Bank carbon pricing report | development bank | annual | FIN-010 |
| EU border mechanism pages | European Commission | per release | GOV-011 |
Escalation routes
- none · keep monitoring
- research question
- project
- risk object
- annual publication
- signal report
| ID | Signal | Corroboration | Systems | Route |
|---|---|---|---|---|
| SIG-XT17-001 | Gap between pledges and Paris-compatible removal reached 5.2 GtCO2 per year in 20501 | CORROBORATED | CLI · FIN | research question C-01 |
| SIG-XT17-002 | Capacity is not capture, as stated by the institute6 | PARTIAL | INF | research question C-05 |
| SIG-XT17-003 | Direct air capture plant start-up later than first announced1129 | PARTIAL | INF · FIN | initiative C-01 |
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 1Smith, S.M. et al. (eds.), The State of Carbon Dioxide Removal, third edition (report and data portal, 2 June 2026; total removal 2.2 GtCO2 per year; novel removal about 2 MtCO2 per year; pledge gaps of 0.3, 1.2 and 5.2 GtCO2 per year in 2030, 2035 and 2050). Opened as the downloaded PDF. University of Oxford and partners, Oxford. Observation year 2025. Accessed 2026-11-03.back
- 6Global CCS Institute (ed.), Global Status of CCS 2026 (status page: 113 commercial CCS projects in operation and 68 Mtpa operating capture capacity as at 31 July 2026; capacity is not the same as actual annual capture). Global CCS Institute, Melbourne. Observation year 2026. Accessed 2026-11-03.back
- 11Occidental and 1PointFive (eds.), Occidental and 1PointFive secure Class VI permits for the STRATOS direct air capture facility (company release, 7 April 2025; capacity up to 500,000 tonnes per year; stated on track to begin operations in 2025). Company statement, weak evidence. 1PointFive, Houston. Observation year 2025. Accessed 2026-11-03.back
- 29UNVERIFIED, not opened: Oil and Gas Journal (ed.), report that Occidental and 1PointFive expect the STRATOS direct air capture plant online in the second quarter of 2026, taken from a search-result summary without a visible date. Trade press, weak evidence. PennWell, Tulsa. Observation year 2026. Accessed 2026-11-03.back
