Systems in depth
One section per system: its state at evidence close, its exposures and what the operational series will watch.
Contents
- ·Edition home
- ·Executive summary
- 1Climate technology is infrastructure with a measurement problem
- 2Key findings
- 3Systems and sectors at baseline
- 4Risks and capability
- 5Planned storage outruns delivered storage
- 6Readings from the other desks
- 7The 2027 agenda
- 8Systems in depth
- AMethodology
- BData appendix
- CReferences and record
- ·Complete edition, for print
8.1Capture, transport and storage infrastructure
Capture plants, ships, pipelines and storage wells are built infrastructure. Counts are strongest for design capacity and weakest for actual capture and injected volumes.
| Component | State | Evidence | Status |
|---|---|---|---|
| Cement capture | Brevik design capture of about 400,000 tonnes per year, around half of plant emissions | 89 | Reported |
| Shared storage | Northern Lights phase 1 of 1.5 Mtpa operational; phase 2 to 5 Mtpa under construction | 108 | Reported |
| Direct air capture | STRATOS designed for up to 500,000 tonnes per year; first Class VI permits for direct air capture in April 2025 | 1119 | Reported |
| Precedent | CO2 separated from produced gas at Sleipner since 1996 | 25 | Reported |
Couplings
- INF → CLI capture and storage
- FIN → INF offtake and premiums
- ENE → INF power and heat
Evidence to bind in 2027
- actual capture against capacity
- injected volumes by project
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-07 Climate and Earth Systems
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
8.2Energy, power and water for capture and removal
Capture and removal need heat, power and water. Clean power is scaling, while the footprint per tonne of capture plants is not published on a common basis.
| Component | State | Evidence | Status |
|---|---|---|---|
| Solar generation | rose 636 TWh to 2,778 TWh in 2025 | 5 | Reported |
| Fossil generation | fell by 38 TWh, the first year since 2020 without a rise | 5 | Reported |
| Renewable capacity | a search summary reports 692 GW added in 2025, and a forecast summary reports about 4,600 GW more by 2030 | 2627 | Reported |
| Plant energy and water | not published per tonne on a common basis | 1 | Expert input |
Couplings
- ENE ↔ INF facility power
- ENE → WAT process water
- CLI ← ENE emission cuts from clean power
Evidence to bind in 2027
- energy and water per tonne
- capture plant load on grids
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-07 Climate and Earth Systems
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
8.3Materials, biomass and storage geology
Capture and removal depend on solvents and sorbents, steel, biomass and suitable geology. These dependencies are the least documented part of the evidence here.
| Component | State | Evidence | Status |
|---|---|---|---|
| Biochar and bioenergy methods | account for almost all novel removal | 1 | Reported |
| Storage geology | saline aquifer storage in the Johansen formation, 2.6 km below the seabed | 8 | Reported |
| Capture solvents and sorbents | supply chains not mapped here | 1 | Expert input |
| Fabrication | capacity by country not consolidated here | 1 | Expert input |
Couplings
- MIN → INF materials
- BIO → ENE biomass feedstock
- FIN → INF fabrication
Evidence to bind in 2027
- sorbent and solvent supply
- storage capacity by country
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-07 Climate and Earth Systems
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
8.4Economy, markets and workforce
Carbon pricing raised large public revenues in 2025, while durable removal markets are small and young. Workforce numbers are not bound.
| Component | State | Evidence | Status |
|---|---|---|---|
| Carbon pricing | 87 instruments; average price near USD 21 per tonne | 13 | Reported |
| Removal purchases | a buyer group commits USD 1.8 billion for permanent removal by 2040 | 20 | Reported |
| Durable removal market | 50.6 million tonnes contracted and 1.7 million delivered on one dashboard, with no as-of date | 21 | Reported |
| Public programmes | US direct air capture hubs programme of four hubs, each with a target of at least 1 million tonnes per year | 14 | Reported |
Couplings
- FIN → INF scale-up
- DAT → FIN registry basis
- HLT → INF workforce
Evidence to bind in 2027
- durable removal prices and retirements
- workforce size and skills gaps
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-07 Climate and Earth Systems
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
8.5Security, disclosure and governance watch
Rules decide what is paid for and what counts. Border pricing is in its definitive period, disclosure and target standards are being revised, and credit quality rules are voluntary.
| Component | State | Evidence | Status |
|---|---|---|---|
| Border pricing | cement, iron and steel, aluminium, fertilisers, electricity and hydrogen | 17 | Reported |
| Disclosure | IFRS S2 applies from 2024; amendments to emissions disclosures issued in December 2025 | 18 | Reported |
| Credit quality | ten principles in three groups: governance, emissions impact, sustainable impact | 15 | Reported |
| Targets | Corporate Net-Zero Standard version 2.0 published; new submissions align to it from 1 February 2028 | 24 | Reported |
Couplings
- GOV → TRD border pricing
- GOV → DAT disclosure data
- GOV → FIN credit quality
Evidence to bind in 2027
- text of removal methodologies
- national credit quality rules
Related editions
- GLB Global Systems
- GS-02 Energy
- GS-07 Climate and Earth Systems
- XT-14 Fusion and Frontier Energy
- XT-16 Advanced Energy Storage
- SR-04 Critical Minerals and Strategic Materials
Notes
Numbers are the edition’s reference numbers, so a note reads the same in every chapter. The full list, with every source and its licence, is in Annex C. Annex C, references
- 6Global CCS Institute (ed.), Global Status of CCS 2026 (status page: 113 commercial CCS projects in operation and 68 Mtpa operating capture capacity as at 31 July 2026; capacity is not the same as actual annual capture). Global CCS Institute, Melbourne. Observation year 2026. Accessed 2026-11-03.back
- 7Global CCS Institute (ed.), Global Status of CCS 2025 media release (9 October 2025; 77 operational facilities, up 54% from 50; 47 projects under construction with 44 Mtpa; 513 Mtpa operating and in development). Global CCS Institute, Melbourne. Observation year 2025. Accessed 2026-11-03.back
- 8Global CCS Institute (ed.), Brevik CCS Facility Profile (2026; operation began June 2025; capture capacity 400,000 tonnes per year; Northern Lights phase 1 1.5 Mtpa operational, phase 2 5 Mtpa under construction; capital cost and abatement cost are secondary figures cited in the profile and are not used). Global CCS Institute, Melbourne. Observation year 2025. Accessed 2026-11-03.back
- 9Heidelberg Materials (ed.), World premiere at Heidelberg Materials: opening of CCS facility in Norway (company release, 18 June 2025; about 400,000 tonnes of CO2 per year, 50% of plant emissions). Company statement, weak evidence. Heidelberg Materials, Heidelberg. Observation year 2025. Accessed 2026-11-03.back
- 10Northern Lights JV (ed.), About the Longship project (operator page; phase 1 storage up to 1.5 million tonnes of CO2 per year; owners Equinor, Shell and TotalEnergies). Operator statement, weak evidence. Northern Lights JV, Stavanger. Observation year 2025. Accessed 2026-11-03.back
- 11Occidental and 1PointFive (eds.), Occidental and 1PointFive secure Class VI permits for the STRATOS direct air capture facility (company release, 7 April 2025; capacity up to 500,000 tonnes per year; stated on track to begin operations in 2025). Company statement, weak evidence. 1PointFive, Houston. Observation year 2025. Accessed 2026-11-03.back
- 19US Environmental Protection Agency (ed.), Class VI wells used for geologic sequestration of CO2 (page updated 18 August 2026; no permit counts on the page). US EPA, Washington. Observation year 2026. Accessed 2026-11-03.back
- 25Equinor (ed.), Sleipner (operator page; CO2 removal from produced gas since 1996; more than 19 million tonnes stored by the end of 2020; Utsira formation). Operator statement. Equinor, Stavanger. Observation year 2020. Accessed 2026-11-03.back
- 5Ember (ed.), Global Electricity Review 2026 (2025 data: solar generation 2,778 TWh, up 636 TWh or 30%; fossil generation down 38 TWh; renewables 33.8% of generation). Ember, London. Observation year 2025. Accessed 2026-11-03.back
- 26UNVERIFIED, not opened: IRENA (ed.), Renewable Capacity Statistics 2026 (692 GW added in 2025; 5,149 GW total; solar about 511 GW), taken from search-result summaries; the agency page returned an access error. International Renewable Energy Agency, Abu Dhabi. Observation year 2025. Accessed 2026-11-03.back
- 27UNVERIFIED, not opened: IEA (ed.), Renewables 2025 (forecast of about 4,600 GW of new renewable capacity to 2030, near 80% solar), taken from search-result summaries. International Energy Agency, Paris. Observation year 2025. Accessed 2026-11-03.back
- 1Smith, S.M. et al. (eds.), The State of Carbon Dioxide Removal, third edition (report and data portal, 2 June 2026; total removal 2.2 GtCO2 per year; novel removal about 2 MtCO2 per year; pledge gaps of 0.3, 1.2 and 5.2 GtCO2 per year in 2030, 2035 and 2050). Opened as the downloaded PDF. University of Oxford and partners, Oxford. Observation year 2025. Accessed 2026-11-03.back
- 13World Bank (ed.), Direct carbon pricing covers nearly one third of global emissions (press release on State and Trends of Carbon Pricing 2026, 19 May 2026; about 29% coverage; revenue above USD 107 billion in 2025; 87 instruments; average price near USD 21 per tonne). World Bank, Washington. Observation year 2025. Accessed 2026-11-03.back
- 21CDR.fyi (ed.), CDR.fyi public dashboard (headline metrics: 50.6 million tonnes contracted, 1.7 million tonnes delivered, weighted average price USD 340 per tonne; no as-of date on the page; dashboard, weak evidence). CDR.fyi, online. Observation year 2026. Accessed 2026-11-03.back
- 20Frontier Climate (ed.), Frontier home page (advance market commitment of USD 1.8 billion of permanent carbon removal by 2040; buyer group page, weak evidence for market size). Frontier Climate, San Francisco. Observation year 2026. Accessed 2026-11-03.back
- 14US Department of Energy Office of Clean Energy Demonstrations (ed.), Regional Direct Air Capture Hubs (programme page; four hubs with potential of at least 1 million tonnes per year each; USD 3.5 billion announcement of December 2022 and USD 1.8 billion announcement of December 2024; no awardees named on the page). US Department of Energy, Washington. Observation year 2024. Accessed 2026-11-03.back
- 17European Commission (ed.), Carbon Border Adjustment Mechanism (page; transitional phase 2023 to 2025; definitive period from 1 January 2026; six sectors). Directorate-General for Taxation and Customs Union, Brussels. Observation year 2026. Accessed 2026-11-03.back
- 15Integrity Council for the Voluntary Carbon Market (ed.), Core Carbon Principles (page; ten principles in three groups; no credit categories listed on the page). ICVCM, London. Observation year 2026. Accessed 2026-11-03.back
- 18IFRS Foundation (ed.), IFRS S2 Climate-related Disclosures (navigator page; issued June 2023; effective for periods from 1 January 2024; amendments to greenhouse gas emissions disclosures issued December 2025). IFRS Foundation, London. Observation year 2025. Accessed 2026-11-03.back
- 24Science Based Targets initiative (ed.), Corporate Net-Zero Standard (page; versions 1.3.1 and 2.0; target validation under version 2.0 from the first quarter of 2027; all new submissions aligned to version 2.0 from 1 February 2028). SBTi, London. Observation year 2026. Accessed 2026-11-03.back