Electricity is the lifeline other lifelines depend on: water pumping, telecommunications, hospitals, fuel distribution, payments and traffic control all stop or degrade when power stops. Outages come from weather, equipment failure, operating errors, cyber incidents and supply shortfalls. This page sets out how power systems fail and recover, how reliability is measured, and what evidence serves the operators and regulators who keep the lights on.

02The question

Electricity and lifelines: how the risk develops.

Dependency of services on power. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Weather damages the network

Wind, ice, heat, flood and wildfire damage lines, substations and generation. Distribution networks, with long exposed overhead lines, account for most customer outage time.

Mechanism

Balance must hold every second

Supply and demand must match continuously. A sudden loss of generation or a line can cause frequency and voltage swings that trip further equipment unless protection and reserves respond.

Mechanism

Other lifelines follow

Backup generators and batteries carry critical loads for hours to days. When fuel runs out or backup is absent, water, telecommunications and health services fail in turn.

Mechanism

Restoration is staged

After a large outage, operators restart generation with black-start units and rebuild the network step by step. Priority customers and dependent lifelines shape the order of restoration.

03Monitor

Asset criticality register.

The screen a team would use to follow this subject: its measures, states and decisions. Names are examples and values are illustrative.

Asset criticality register

Electricity and lifelines · Lifeline system A · Register v9

9 critical assets in flood zoneGCRI · Critical Infrastructure

Critical assets

SS-12ElectricityTier 1Flood 1-in-1007
WTW-2WaterTier 1Flood 1-in-10028
DX-1TelecomTier 2Heat10
H-CampusHealthTier 1Earthquake40
PN-3TransportTier 2Storm surgen/a

SS-12 dependencies

Upstream
Transmission L4, L7
Downstream
WTW-2, H-Campus, DX-1
Restoration target
12 h
Owner
Asset owner

Dependency graph

red: SS-12 and its dependants

N1N2N3N4N5N6N7N8N9N10N

Restoration time by sector

050100hours to restore after outage, last eventsPowerWaterTelecomHealthRoads
Asset criticality register: the screen's structure, terms and states for Electricity and lifelines.Example names and illustrative values; a design, not a record or a live system.
04Across the domains

Electricity sits under every other lifeline.

Lifeline studies are designed for the Strategic Systems series. Reliability is reported with IEEE 1366 indices; the 2021 cold-weather outages in Texas showed how gas, power and water failed together.

  • Outage records with affected services.
  • Restoration priority rules.
05Simulator

A cascade through interdependent networks.

A hazard footprint takes out co-located assets in every layer; fragmentation, dependency between layers and overload of the survivors then spread the failure. The 3D view separates the layers by depth. Teaching model with stated illustrative values, not a prediction.

02040608010000.20.40.60.81Cascade stepWorking share of the layer (%)TransportPowerTelecoms

Controls

Assets per layer
18
Hazard footprint
8% of area
Assets that depend on another layer
60%
Spare capacity (tolerance)
30%

Readouts

Assets hit by the hazard
4%
Assets still working
69%
Amplification of the initial damage
8.5 times
Steps to settle
1
Numbers, methods and sources
StepTransport working (%)Power working (%)Telecoms working (%)
01009494
11005650

Methods

  1. Interdependent networks Buldyrev and others (2010), Catastrophic cascade of failures in interdependent networks, Nature 464
  2. Overload cascades Motter and Lai (2002), Physical Review E 66
  3. Betweenness load Brandes (2001), Journal of Mathematical Sociology 25
  4. Multilayer networks Kivela and others (2014), Journal of Complex Networks 2
  5. Infrastructure interdependencies Rinaldi, Peerenboom and Kelly (2001), IEEE Control Systems 21(6)
  6. Uncertainty fan (parameter Monte Carlo) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
  7. One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Data

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page's map can draw:

  • Major roads Natural Earth
  • Railways Natural Earth
  • Seaports Natural Earth
  • Airports Natural Earth
  • Urban extents Natural Earth
  • Night lights tonight, outages (VIIRS Day/Night Band) NASA/NOAA VIIRS (Suomi NPP) · register nasa.gibs.context-live-layers
  • Natural events (NASA EONET) NASA EONET · register nasa.eonet.events
A cascade through interdependent networks. Illustrative teaching model: it runs on the values set by the controls, not on measured data. Methods: Interdependent networks (Buldyrev and others (2010), Catastrophic cascade of failures in interdependent networks, Nature 464); Overload cascades (Motter and Lai (2002), Physical Review E 66); Betweenness load (Brandes (2001), Journal of Mathematical Sociology 25).
06Indicators

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
System Average Interruption Duration Indexminutes per customer per yearannualUtility reliability reportsPublished statistics
System Average Interruption Frequency Indexinterruptions per customer per yearannualUtility reliability reportsPublished statistics
Customers without powercount of customershourly during eventsUtility outage reportingREPORTED
Energy not suppliedmegawatt hoursper eventSystem operator incident reportsPublished statistics
Reserve marginpercent of peak demandseasonalAdequacy assessmentsFORECAST
Critical facilities with backup powerpercent of designated facilitiesannualFacility surveysREPORTED
Restoration time for major eventshours to restore a stated share of customersper eventIncident reportsOBSERVED
07Sources

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

SourceWhat it givesLicence class
ENTSO-E Transparency PlatformEuropean generation, load, outages and cross-border flowsFree, ENTSO-E terms of use
US EIA electric power data and Form OE-417 disturbance reportsGeneration data and reports of major electric incidentsPublic domain, US government data
NERC State of Reliability and seasonal assessmentsAnalysis of bulk power system performance and adequacyPublic, NERC terms
CEER benchmarking reports on quality of electricity supplyComparable continuity of supply indicators across European regulatorsPublic, CEER terms
World Bank Enterprise SurveysFirm-reported outages and generator useFree with registration, World Bank terms
Global Energy Monitor trackersPower plants and infrastructure by location and statusOpen, CC BY 4.0
08Decisions

Who decides, and what the evidence serves.

Critical Infrastructure prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Who decidesThe questionEvidence this page serves
Transmission and distribution operatorsWhere to harden, underground or add redundancyOutage patterns by cause; restoration evidence
Energy regulatorsWhich reliability standards and incentives to setContinuity indicators compared over time and with peers
Emergency management agenciesWhich facilities need backup power and fuel priorityBackup endurance reviews; dependency maps
System operatorsHow much reserve and black-start capability to holdAdequacy assessments; incident reports

Outputs this topic produces

  • Outage pattern analyses by cause, season and network type
  • Backup power endurance reviews for critical facilities
  • Restoration sequencing studies linking power to dependent lifelines
  • Reliability evidence notes for regulators
09Core questions

What experts ask.

  • Which services fail immediately on loss of power, and which degrade over hours or days?
  • How long do backup generators, batteries and fuel stocks actually last under real demand?
  • How do grid failures propagate, and how quickly can a grid be restarted after a wide-area blackout?
  • How does the shift to variable renewable generation, storage and distributed resources change reliability?
  • Which loads should be restored first, and who decides?
10Mechanisms

Drivers and failure pathways.

Power systems must balance supply and demand continuously. A disturbance such as a line fault, generator trip or sudden demand change shifts flows across the network. Protection systems disconnect equipment to prevent damage, and if the disturbance is large enough, these disconnections can cascade into a wide-area blackout. Restarting a collapsed grid requires black-start capable generation and careful sequencing, which takes time.

Downstream services meet power loss through backup arrangements, and these are where hidden fragility lies. Generators fail to start, fuel deliveries depend on roads and pumps that themselves need power, batteries at telecommunications sites last hours rather than days, and backup systems are often tested less than assumed. Prolonged outages therefore produce a second wave of failures as backup capacity is exhausted.

Extreme heat and cold raise demand while stressing equipment, and wildfire, storm and flood damage transmission and distribution. Energy system science is shared with Energy Nexus.

11Methods and limits

How it is studied.

  1. 01

    Grid reliability analysis

    Contingency analysis and probabilistic reliability methods from power systems engineering test how grids respond to losing components.

  2. 02

    Dependency inventories

    Structured surveys record which services depend on power, their backup capacity and their tolerable outage duration.

  3. 03

    Restoration modelling

    Optimisation from optimisation and operations research explores restoration orders that bring back critical loads first.

  4. 04

    Limits

    Backup durations are often self-reported and untested. Grid models rely on operator data that is rarely public, and cascades depend on conditions that are hard to reproduce.

13Where this page's references

Where this page's references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

14Questions

Questions and answers.

What is SAIDI?
The System Average Interruption Duration Index: the average total time customers are without power in a year, a standard measure of distribution reliability defined in IEEE 1366.
What is black start?
Restarting a power system after a total or partial blackout using generators that can start without power from the grid.
Why do other services fail when power fails?
Water pumping, telecommunications, payments and hospitals need electricity. Backup systems hold for a limited time, after which those services fail too.
Do backup generators solve the dependence on power?
They extend it for a time. Their value depends on fuel, maintenance, testing and the duration of the outage.
Do renewables make grids less reliable?
They change how reliability is achieved, requiring different approaches to balancing, inertia and storage. Reliability depends on system design, not on any single technology.
Does the platform set restoration priorities?
No. It studies how priorities can be reasoned about. Operators and competent authorities decide.
Who reviews coverage of this topic?
Published analysis is designed to be reviewed by a named subject reviewer with relevant engineering expertise, to cite its references and to include independent voices, including operators. Where specialists disagree, the disagreement is reported rather than resolved by omission.
Critical Infrastructure

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.