The Global Centre for Risk and Innovation (GCRI)
Maps of Critical Infrastructure are published here once their data rights are cleared and they have been reviewed. Each shows its time and space reference, its sources and its uncertainty.
Hospital campus · Layers 5 · Scale 1:125,000
schematic · placeholder geography
| Assets in register | OFFICIAL | On |
| Assets in high… | DERIVED | On |
| Dependencies mapped | DERIVED | On |
| Backup power autonomy | ASSESSED | Off |
| Administrative… | OFFICIAL | Off |
Critical Infrastructure · Map workspaceMap workspace, in outline: domain structure with placeholder names and illustrative values, not a record.
Critical Infrastructure released maps are reviewed map views of critical infrastructure, published once their data rights are cleared, each with its coordinate reference, date, sources and uncertainty. Layers draw on sources such as ENTSO-E Transparency Platform. A map shows released, rights-cleared evidence, not a live feed or an official warning.
Fig.A programme from scoping to the owner's decision. Design, not a record.
For released maps, in GCRI's spatial-intelligence reading, the map opens on night lights, true-colour imagery and population density with night lights tonight from NASA GIBS, framed on World; 3 further NASA layers wait in the list.
The interactive map needs JavaScript; the layer list and sources are below.
Layers 3
Energy now, for this page
Keyboard, with the map focused
Hold Ctrl or ⌘ and scroll to zoom
Latest available
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth
Loading the latest NASA imagery.
Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.
For released maps, in GCRI's spatial-intelligence reading, the map opens on night lights, true-colour imagery and population density with night lights tonight from NASA GIBS, framed on World; 3 further NASA layers wait in the list.Satellite and model products as NASA publishes them, each with its own date; indicators, not assessments of any place; claim ceiling INTEGRATED.
Layers and dates
| Indicator | Unit | Cadence | Evidence label | Topic |
|---|---|---|---|---|
| System Average Interruption Duration Index | minutes per customer per year | annual | Official | Electricity and lifelines |
| System Average Interruption Frequency Index | interruptions per customer per year | annual | Official | Electricity and lifelines |
| Customers without power | count of customers | hourly during events | Reported | Electricity and lifelines |
| Energy not supplied | megawatt hours | per event | Official | Electricity and lifelines |
| Reserve margin | percent of peak demand | seasonal | Forecast | Electricity and lifelines |
| Critical facilities with backup power | percent of designated facilities | annual | Reported | Electricity and lifelines |
| Restoration time for major events | hours to restore a stated share of customers | per event | Observed | Electricity and lifelines |
| Water main breaks | breaks per hundred kilometres of main per year | annual | Observed | Water and wastewater assets |
| Non-revenue water | percent of system input volume | annual | Estimated | Water and wastewater assets |
| Continuity of supply | hours of supply per day | monthly | Reported | Water and wastewater assets |
| Sewer overflow events | count per year | annual | Observed | Water and wastewater assets |
| Treatment plants with backup power | percent of plants | annual | Declared | Water and wastewater assets |
| Drinking water compliance | percent of samples meeting standards | monthly | Official | Water and wastewater assets |
| Pipe renewal rate | percent of network renewed per year | annual | Reported | Water and wastewater assets |
| Mobile sites off air | percent of sites | hourly during events | Reported | Telecommunications and cables |
| Network outage incidents | count by cause | annual | Official | Telecommunications and cables |
| Submarine cable landings per country | count of cable systems | annual | Reported | Telecommunications and cables |
| International bandwidth redundancy | count of independent routes | annual | Estimated | Telecommunications and cables |
| Base station backup duration | hours | per site class | Declared | Telecommunications and cables |
| Cable repair time | days from fault to repair | per event | Reported | Telecommunications and cables |
| Port throughput | twenty-foot equivalent units | monthly | Official | Transport and logistics nodes |
| Vessel waiting time | hours at anchor before berth | weekly | Observed | Transport and logistics nodes |
| Closure days by cause | days | annual | Reported | Transport and logistics nodes |
| Share of national trade through one node | percent of trade value | annual | Official | Transport and logistics nodes |
| Alternative capacity available | percent of node throughput other nodes could absorb | per assessment | Estimated | Transport and logistics nodes |
| Time to clear backlog | days | per event | Observed | Transport and logistics nodes |
| Hospital Safety Index rating | safety category | per assessment | Official | Healthcare and emergency services |
| Hospitals with backup power for critical areas | percent of hospitals | annual | Reported | Healthcare and emergency services |
| On-site water storage | hours of normal use | per facility | Declared | Healthcare and emergency services |
| Emergency call answer time | seconds | monthly | Observed | Healthcare and emergency services |
| Facilities reachable during flood scenarios | percent of facilities | per scenario | Modelled | Healthcare and emergency services |
| Health facility functionality after events | percent fully functional | per event | Reported | Healthcare and emergency services |
| Buildings by construction type and age | count by class | per inventory update | Official | Urban assets and housing |
| Schools assessed for hazard safety | percent of schools | annual | Reported | Urban assets and housing |
| Bridges in poor condition | percent of inspected bridges | annual | Observed | Urban assets and housing |
| Building permits with structural review | percent of permits | annual | Reported | Urban assets and housing |
| Buildings retrofitted | count per year | annual | Reported | Urban assets and housing |
| Population in high-vulnerability building classes | people | per assessment | Modelled | Urban assets and housing |
| Mapped interdependencies between sectors | count of documented dependencies | annual | Declared | Interdependency and cascade |
| Co-located critical assets | count of sites hosting several sectors | per assessment | Estimated | Interdependency and cascade |
| Buffer time by dependency | hours | per asset class | Declared | Interdependency and cascade |
| Services affected per initiating failure | count of dependent services | per scenario | Modelled | Interdependency and cascade |
| Joint restoration exercises held | count | annual | Reported | Interdependency and cascade |
| Multi-sector incidents | count of incidents affecting more than one sector | annual | Reported | Interdependency and cascade |
| Assets designed to current hazard standards | percent of asset base | per assessment | Estimated | Asset standards and safety |
| Inspections completed on schedule | percent of planned inspections | annual | Reported | Asset standards and safety |
| Overdue safety-critical maintenance | count of items | monthly | Observed | Asset standards and safety |
| Standards revised for climate change | count of design standards updated | per revision cycle | Official | Asset standards and safety |
| Regulatory enforcement actions | count by type | annual | Official | Asset standards and safety |
| Process safety events | count by tier | annual | Reported | Asset standards and safety |
| Network links without alternative route | count of links | per assessment | Modelled | Transport and mobility |
| Travel time increase under link closure | percent increase | per scenario | Modelled | Transport and mobility |
| Weather-related closures | hours of closure by cause | annual | Observed | Transport and mobility |
| Public transport service reliability | percent of scheduled services operated | monthly | Observed | Transport and mobility |
| Population with access to essential services by public transport | percent within a stated travel time | per assessment | Modelled | Transport and mobility |
| Rail heat-related incidents | count | annual | Reported | Transport and mobility |
Analysis runs in Nexus Foundry; reviewed releases are listed here.
Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.
| Term | Definition |
|---|---|
| Coordinate reference system | The definition that ties coordinates to locations on Earth, catalogued with EPSG codes. |
| Modifiable areal unit problem | The change in statistical results that comes from how areas are drawn and aggregated. |
| Zonal statistics | Statistics of raster values summarised within boundaries such as districts. |
| Public-safe release | A recorded decision on the detail at which a layer may be published without exposing sensitive sites or people. |
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.