Skip to content

GCRI · Systems Science and Modelling

Data and technical methods

The public technical tools of Systems Science and Modelling: the models and data behind them, how to reproduce a view and the uncertainty it carries.

01Workspace

The workspace for data and technical methods.

Build workspace

Systems science · Data and technical methods · Run R-7897 · Example interface, not a record

Run in progressGCRI · Systems Science and Modelling

Runs

same inputs, versioned

R-2617Systems engineeringv5.00.74Running
R-0432Probabilityv6.70.79Passed
R-7467Uncertaintyv8.70.67Drift
R-4646Network sciencev3.20.42Failed test

Model card

Method
Systems engineering
Inputs
Model library, Run archive
Validation
held-out period, skill reported
Label
MODELLED

Run log

  1. 00:00:27InfoIngest model library
  2. 00:02:12InfoSchema and licence checks passed
  3. 00:07:40WarnGap filled by interpolation, flagged
  4. 00:12:03DoneCalibration complete
  5. 00:22:55GateIndependent test queued
Build workspace.Illustrative interface; not live data.

Systems Science and Modelling · Build workspace. Build workspace: example names and illustrative values, not a record.

02Tools

What is published here.

Maps

Released maps

Open the released maps

Models

Reviewed models and scenarios

Open the reviewed models

Scenarios

Sector scenarios

Open the sector scenarios

03Fitness for purpose

What every systems modelling tool should state about itself.

Modelling tools serve analysts coupling models from several fields. A specialist checks model version and code location, the scenario set and the coupling assumptions. Tools rest on uncertainty quantification and systems engineering and support the coupled modelling and reproducible modelling topics. Every coupled run records which platform supplied each component model and its version.

  • Model version and code location.
  • Scenario set.
  • Coupling assumptions.
04Process

How the process runs.

Process explorer · Process

Data and technical methods: Build, sign and accept

10 steps4 stages2 gates

Process

Data and technical methods: Build, sign and accept

An admitted mission becomes a cycle project; the build is pinned, verified and signed, and the Global Risks Forum (GRF) records acceptance for exercise, not permission to deploy.

  1. 01 Request and sources

    1. 01Admitted mission becomes a cycle projectRecord · Universe to FoundryAn admitted mission becomes a cycle project with a decision case.
    2. 02Qualify data sources and resourcesStep · the Global Centre for Risk and Innovation (GCRI)GCRI qualifies data sources and resource offers and builds the scenario models. An offer is not an allocation.
  2. 02 Build and verify

    1. 03Source snapshotRecord · NXS-FAC (blueprints, builds and signing)The snapshot pins the commit, dependencies and generator versions.
    2. 04Build contractRecord · NXS-FAC (blueprints, builds and signing)The build contract declares the artefact kind, environment and reproducibility envelope.
    3. 05Integrate and buildModel · GCRIGCRI integrates software and data, signs builds, and tests security and interoperability.
    4. 06Verification suiteGate · NXS-FAC (blueprints, builds and signing)Required and advisory checks stay separate. Reproducibility needs pinned inputs, declared nondeterminism and independent rebuilds.
  3. 03 Sign and admit

    1. 07Sign the exact artefactStep · NXS-FAC (blueprints, builds and signing)NXS-FAC builds, attests and requests a signature via a scoped signer identity. It holds no key material.
    2. 08Package admissionStep · NXS-NXQ (software, models and capability lifecycle)NXS-NXQ receives the signed package and keeps admission evidence that binds the task, data class, evaluation suite and expiration.
  4. 04 Accept

    1. 09Core Build ReportRecord · GCRIThe Core Build Report is the go or no-go record. Universe assembles the Core and holds the decision for the exercise.
    2. 10G3 · Build accepted for exerciseGate · The Global Risks ForumGRF records whether the build is accepted for exercise. A signed build or release candidate is not permission to deploy to production.

The programme year · NXS-FAC · UniverseDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The record order follows the Builds and Releases room lists of NXS-FAC.

05Build environment

Working with the tools.

Analysis runs in Foundry for authorised projects. Public pages show released views only, each with its time and space reference and its rights.

07Pages

Pages in Data and technical methods.

08Questions

Questions and answers.

Can I use the data?
Each released view states its licence and terms. Data that is not released is not available through these pages.
ReportsContribute

Contribute evidence from this page.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

GCRISystems Science and ModellingMethods and TechnicalScenario and Stress-Test
Systems Science and Modelling

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.