Skip to content

GCRI · Systemic Risk Management

Scenario design and stress testing

Scenario design and stress testing are the method this platform stewards for the network. They turn severe but plausible events into structured tests of plans, buffers and dependencies. In systemic risk management they are used to probe cross-sector cascades, to find breaking points and to compare preparedness across institutions on common assumptions.

01Register

Scenario design and stress testing on the record.

Method recordSTEM method
  1. MethodScenario design and stress testing
  2. StewardSystemic Risk Management
  3. Applied inSystemic Risk Management
  4. Canonical pageSTEM Commons
02Application

What scenario design and stress testing does here.

Scenario design and stress testing construct plausible, severe future conditions to examine how systems and institutions would perform. They complement probabilistic analysis where data are scarce or futures are deeply uncertain. In risk management and systemic risk and methods and modelling, stress tests reveal vulnerabilities that arise when several risks materialise together. They inform capital, contingency and coordination plans across sectors. The canonical description is on the STEM Commons.

Cross-sector scenario design

Scenarios are built with a trigger, severity, timing and conditions, then traced through the dependencies of energy, water, communications, finance and public services, with every assumption written down.

Reverse stress testing

Starting from a defined failure, such as a service stopping, analysts search for combinations of events that would cause it and document which ones are plausible.

Second-round effects

Tests add the reactions of institutions during a crisis, such as asset sales, supply hoarding or service cuts, to see how responses amplify or dampen the initial shock.

03Simulator

Stocks, flows, delays and a tipping threshold.

Two stocks, pressure and adaptive capacity, joined by a reinforcing growth loop, a delayed balancing response and damage when pressure outruns capacity; past the threshold the system can tip. Teaching model with stated illustrative values, not a prediction.

05010015001020304050YearsStock (index)Tipping thresholdAdaptive capacity (stock)Pressure (stock)Perceived pressure (delayed)

Controls

Growth of pressure
6.0% a year
Efficacy of capacity in reducing pressure
4.0% a year
Investment response to perceived pressure
20%
Perception delay
4.0 years
Tipping threshold of pressure
60 index
Amplification past the threshold
2.0 times
Years simulated
50 years

Readouts

Peak pressure
113 index
Capacity at the end
186 index
Years over the threshold
15.8 years
Numbers, methods and sources
YearPressureCapacityPerceived
020.050.020.0
423.344.921.2
827.242.224.0
1231.742.327.7
1636.845.532.2
2042.351.537.2
2447.960.342.6
2853.271.348.0
3257.884.353.1
3666.498.458.4
4082.7115.969.7
4497.8139.783.8
48109.1169.497.3

Methods

  1. System dynamics Forrester (1961), Industrial Dynamics, MIT Press; Sterman (2000), Business Dynamics
  2. Critical transitions and tipping points Scheffer and others (2009), Early-warning signals for critical transitions, Nature 461
  3. Causal loop diagram Sterman (2000), Business Dynamics, McGraw-Hill
  4. Uncertainty fan (parameter Monte Carlo) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
  5. One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Data

No observed data enters this model: it runs on the teaching values set by the controls, to be replaced with a programme’s own evidence.

Stocks, flows, delays and a tipping threshold. Illustrative teaching model: it runs on the values set by the controls, not on measured data. Methods: System dynamics (Forrester (1961), Industrial Dynamics, MIT Press; Sterman (2000), Business Dynamics); Critical transitions and tipping points (Scheffer and others (2009), Early-warning signals for critical transitions, Nature 461); Causal loop diagram (Sterman (2000), Business Dynamics, McGraw-Hill).
04Data

What the method consumes.

Datasets and records used by scenario design and stress testing on this platform, with the role each plays and the label its values carry. Sources are listed in the source register.

DataRoleLabel
NGFS climate scenariosReference physical and transition pathwaysMODELLED
Reasonable worst-case planning scenariosCivil contingency assumptionsPublished statistics
Historical event reconstructionsCalibration of severityOBSERVED
Dependency inventoriesPropagation structureDECLARED
05Validation

How results are checked.

Scenarios are reviewed for plausibility, internal consistency and severity relative to history. Exercise outcomes are compared with actual events when they occur.

CheckHow it is done
Plausibility reviewScenarios are reviewed by domain experts for internal consistency and plausibility before use
Severity benchmarkingScenario severity is compared with historical events and published reference scenarios
Model coverageThe share of mapped critical dependencies represented in the test is reported with the results

Scenario choice can reflect prevailing assumptions and miss novel combinations. Results depend on how participants and models represent responses.

07Stewardship

Who maintains the method.

Systemic Risk Management stewards scenario design and stress testing for the Consortium and reviews how it is applied across platforms.

08Questions

Questions and answers.

What are the limits of scenario design and stress testing in this field?
Scenario choice can reflect prevailing assumptions and miss novel combinations. Results depend on how participants and models represent responses.
How are results checked?
Scenarios are reviewed for plausibility, internal consistency and severity relative to history. Exercise outcomes are compared with actual events when they occur.
Are the values on this page real?
The data names, roles and checks are real descriptions of practice. The canvas shows a design of the method’s use, not a run; no result is reported here.
Where else is this method applied?
The canonical method page lists every platform that applies it.
Systemic Risk Management

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

The Global Centre for Risk and Innovation (GCRI Canada) is a Canadian not-for-profit organisation, not a registered charity, with its registered office in Ontario.