G09 · PAGE · factoryGCRI dossier · service level R0
GCRINexus FoundryEstablished
Nexus Foundry · Factory

Factory

Factory is the software factory: where code, models and pipelines are built, tested and released with provenance, so that what runs in production is what was reviewed.

Publisher
The Global Centre for Risk and Innovation
Field
Data and compute, Methods and modelling
Status
Established
Service level
R0: information and enquiries

Build workspace

Foundry · Factory · Run R-5748

Run in progressGCRI · Nexus Foundry

Runs

same inputs, versioned

R-6269High-performance,…v7.20.48Running
R-8658Data engineering,…v9.60.66Drift
R-9313Geospatial information…v5.20.67Failed test
R-3383Artificial…v4.00.51Passed

Model card

Method
High-performance, cloud and…
Inputs
Job scheduler log, Model registry
Validation
held-out period, skill reported
Label
MODELLED

Run log

  1. 00:00:42InfoIngest job scheduler log
  2. 00:01:12InfoSchema and licence checks passed
  3. 00:06:40WarnGap filled by interpolation, flagged
  4. 00:14:03DoneCalibration complete
  5. 00:27:55GateIndependent test queued

Nexus Foundry · Build workspaceBuild workspace, in outline: domain structure with placeholder names and illustrative values, not a record.

01In brief

The short answer.

Factory Application Generator is the Nexus Foundry system for blueprints turned into tested, signed application releases. It serves 2 platforms, among them Nexus Labs as well as Advanced Industry and Robotics, and its stated limit is that a release passes tests; it is not a certification. Access is through an authorized project with an accountable owner, data terms and a review plan.

02Geography

Digital demand and connectivity in the United Kingdom and Ireland.

Urban demand centres and the hubs that anchor digital and data infrastructure, shown for the United Kingdom and Ireland as an example geography for this subject.

Urban demand centres and the hubs that anchor digital and data infrastructure.Indicator derived from Natural Earth at map scale; a screening view, not an assessment.
GCRI · Nexus Foundry · fieldDESIGN FIGURE
04The problem it addresses

Unreviewed changes are how trusted tools go wrong.

Analytical software used in decisions must be traceable from source to running artifact. Supply-chain integrity practice (signed builds, bills of materials, reproducible builds) ensures that a release is what its reviewers approved.

  • Signed, reproducible builds.
  • Software bills of materials.
  • Tests and review gates before release.
05Reference practice

The standards a design like this is read against.

ReferenceRelevance
NIST SSDF (SP 800-218)Secure software development practices
SLSASupply-chain integrity levels
SPDXSoftware bills of materials
06Neighbouring systems

What it exchanges with the other systems.

  • Releases run on NEXCORE.
  • Applications assembled in Apps.
07Access

Authorized projects only.

Access requires an authorized project with an accountable owner, data terms and a review plan. Enquiries go to contact@therisk.global.

08Key terms

Terms used on this page.

Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.

TermDefinition
Software bill of materialsA machine-readable inventory of the components and dependencies in a piece of software, in formats such as SPDX or CycloneDX.
Build provenanceA verifiable record of how and from what sources a software artefact was built.
Configuration managementRecording and controlling the versions and settings of every component so the system's state is known.
09Sources

Where this page's references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

10Questions

Questions and answers.

Is the system available now?
Allocations open when their terms and review capacity exist; the current service level is R0, information and enquiries.
Nexus Foundry

Bring your expertise to this field.

The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

Have questions?