GCRI · Foundry
NXS-NET
NXS-NET (network topology and continuity) covers connectivity and communications continuity: the networks that every other system and every response depends on, and how they behave when parts fail.
The workspace for NXS-NET.
Build workspace
Foundry · NXS-NET · Run R-3753 · Example interface, not a record
Runs
same inputs, versioned
| R-4020 | High-performance, cloud | v4.4 | 0.55 | Running |
| R-1437 | Data engineering | v9.1 | 0.84 | Drift |
| R-9017 | Geospatial information | v7.8 | 0.45 | Passed |
| R-0489 | Artificial intelligence | v9.5 | 0.63 | Drift |
Model card
- Method
- High-performance, cloud and edge computing
- Inputs
- Job scheduler log, Model registry
- Validation
- held-out period, skill reported
- Label
- MODELLED
Run log
- 00:00:13InfoIngest job scheduler log
- 00:03:12InfoSchema and licence checks passed
- 00:06:40WarnGap filled by interpolation, flagged
- 00:11:03DoneCalibration complete
- 00:27:55GateIndependent test queued
Foundry · Build workspace. Build workspace: example names and illustrative values, not a record.
NXS-NET serves these platforms.
Every system assumes the network is there.
NXS-NET is defined in system profile NRS-S10 of the Nexus Standards. Data exchange, warnings and coordination all depend on connectivity that is itself exposed to power loss, cable cuts, congestion and attack. Continuity planning needs to know which paths exist, which are diverse and which are single points of failure.
- Path diversity and single points of failure.
- Continuity under power loss and congestion.
- Telemetry on network health.
The standards a design like this is read against.
| Reference | Relevance |
|---|---|
| ITU standards | Telecommunications |
| NIST CSF 2.0 | Resilience of networked services |
| ISO 22301 | Continuity planning |
What it exchanges with the other systems.
- Carries NXS-OPS (instruments, sensors and calibration) telemetry and NXS-EWS (multi-hazard monitoring and warning) messages.
- Spectrum and timing integrity from NXS-SIG.
The ten rooms of NXS-NET.
NXS-NET has the eight rooms every Foundry system shares, set to its own authority, and two specialist rooms, Topology and Continuity. Each is described by the work it is designed for; the public register records NXS-NET as declared, not deployed.
| Room | Kind | Designed to |
|---|---|---|
| Station | Shared | Operate, inspect and correct authoritative domain posture for network topology, connectivity, service intent, telemetry and resilience |
| Mission | Shared | Coordinate bounded objective-oriented intelligence and human handoff for network topology, connectivity, service intent, telemetry and resilience |
| Builder | Shared | Design, engineer and prepare governed changes and artefacts for network topology, connectivity, service intent, telemetry and resilience |
| Maps | Shared | Inspect and compose spatial, temporal and world-model intelligence for network topology, connectivity, service intent, telemetry and resilience |
| Data | Shared | Work with data, ontology, Chronotopes, graphs, scientific methods and risk for network topology, connectivity, service intent, telemetry and resilience |
| Commons | Shared | Work with policy, law, standards, clauses, obligations and assurance for network topology, connectivity, service intent, telemetry and resilience |
| Reports | Shared | Compute, model, synthesise and visualise governed analytical products and reproducible reports for network topology, connectivity, service intent, telemetry and resilience |
| Knowledge | Shared | Work with institutional memory, records, citations, runbooks and learning for network topology, connectivity, service intent, telemetry and resilience |
| Topology | Specialist | Maintain a governed network and service topology and analyse intended versus observed connectivity |
| Continuity | Specialist | Plan and manage communications continuity under outage, degradation, congestion or provider loss |
Authorised projects only.
Access requires an authorised project with an accountable owner, data terms and a review plan. Enquiries go to the contact form.
Where NXS-NET subjects are taught.
Risk Academy, led by the Nexus Consortium, teaches the subjects practised in NXS-NET in these disciplines; the Global Centre for Risk and Innovation (GCRI) links to the Academy as a partner and does not provide its courses.
- Critical infrastructure and lifelinesFacultyFaculty of Infrastructure, Energy and IndustryNXS-NET roomsContinuity
- Energy transition risk and grid integrationFacultyFaculty of Infrastructure, Energy and IndustryNXS-NET roomsContinuity, Topology
- Water and wastewater systemsFacultyFaculty of Infrastructure, Energy and IndustryNXS-NET roomsContinuity, Topology
- Telecommunications and digital infrastructureFacultyFaculty of Infrastructure, Energy and IndustryNXS-NET roomsContinuity, Topology
- Cybersecurity and digital resilienceFacultyFaculty of Technology and Digital SystemsNXS-NET roomsContinuity
- Digital public infrastructure and digital identityFacultyFaculty of Technology and Digital SystemsNXS-NET roomsTopology
- Operational technology and cyber-physical securityFacultyFaculty of Technology and Digital SystemsNXS-NET roomsContinuity
- Positioning, navigation and timing resilienceFacultyFaculty of Technology and Digital SystemsNXS-NET roomsContinuity
- Operational resilience and ICT risk in financeFacultyFaculty of Finance and EconomicsNXS-NET roomsContinuity
- Payments, market infrastructure and fintechFacultyFaculty of Finance and EconomicsNXS-NET roomsSystem as a whole
- Security, defence and hybrid threatsFacultyFaculty of Governance, Policy and International AffairsNXS-NET roomsContinuity
- Operational risk and business continuityFacultyFaculty of Risk Science and MethodsNXS-NET roomsContinuity
- Supply network and economic contagionFacultyFaculty of Systems and Nexus StudiesNXS-NET roomsTopology
Where this page’s references lead.
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
Questions and answers.
Is the system available now?
Bring a method, a dataset or a question.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Legal documents.
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.
