Institutional workforce planning

Hospitals, schools, utilities and public administrations must anticipate how many staff with which skills they will need, as demand, technology and demographics change. Shortages in critical services can become crises when shocks hit. This page sets out how workforce planning works, how supply and demand for skills are forecast and monitored, and what evidence serves the institutions and governments that plan their workforce.

01In brief

The short answer.

Workforce planning is the process of forecasting the staff and skills that organizations and sectors will need and planning how to meet those needs. Training takes years, retirement waves drain experience, professionals migrate, and shortages in critical services can cascade into crises when shocks hit.

02Geography

People and exposure in Southeast Asia.

For institutional workforce planning, in GCRI's spatial-intelligence reading, the map opens on population density, true-colour imagery and night lights with true colour from NASA GIBS, framed on Southeast Asia; every other NASA layer, live feed and forecast waits in the layer list.

The interactive map needs JavaScript; the layer list and sources are below.

Layers 3

People and exposure, for this page

Latest available

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth

Loading the latest NASA imagery.

Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.

For institutional workforce planning, in GCRI's spatial-intelligence reading, the map opens on population density, true-colour imagery and night lights with true colour from NASA GIBS, framed on Southeast Asia; every other NASA layer, live feed and forecast waits in the layer list.Satellite and model products as NASA publishes them, each with its own date; indicators, not assessments of any place; claim ceiling INTEGRATED.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · GDACS · Copernicus Sentinel-2 L2A · NASA HLS S30Sources and licences

  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). CC BY 4.0
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Made with Natural Earth. Free vector and raster map data @ naturalearthdata.com. Public domain
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Context on the globe and flat map: coastlines, boundaries, roads and place names from NASA GIBS reference layers (OpenStreetMap data, ODbL, © OpenStreetMap contributors); Blue Marble imagery as an optional base; 3D terrain and the elevation read-out from the ASTER GDEM elevation colour index (5 m to 200 m classes, exaggerated for legibility). Boundaries are drawn as published and imply no position on any territory.
  • Globe: MapLibre GL JS 6.9.1, BSD-3-Clause, © MapLibre contributors.
  • Live: GDACS (EC JRC / UN OCHA) Events are indicative, not official warnings.
  • Observed (EO): Copernicus Sentinel-2 L2A (contains modified Copernicus Sentinel data 2026), Microsoft Planetary Computer
  • Observed (EO): NASA HLS S30 (contains modified Copernicus Sentinel data 2026). We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).
  • Optional layers (35 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Layers and dates

  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • True colour: VIIRS NOAA-20 corrected reflectance, NASA LANCE · 13 Oct 2026
  • Night-time lights, daily: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Oct 2026
  • Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024
  • Flood water, 3-day composite: VIIRS Global Flood Product, NASA LANCE · 14 Oct 2026
  • Land surface temperature, day, 8-day composite: VIIRS NOAA-20 Level 3, 8-day, NASA LANCE · 14 Sep 2026

03Console

Skills and exposure console, in outline.

The working screen behind this subject: its structure, terms and states. Names are placeholders and values illustrative.

Skills and exposure console

Institutional workforce planning · Labour market A · Year 2

Gap in data rolesGCRI · Future of Work and Skills

Occupations by exposure

Clerical support51,4510.7SubstituteData operations
Machine operators28,1830.7MixedRobot maintenance
Care workers52,5110.1ComplementUpskill
Analysts24,3490.3ComplementUpskill

Vacancies by skill

050100vacancies per 100 jobseekersDataCareTradesGreenAdmin

Reskilling pathway

  1. Assessskills profile
  2. Matchtarget role
  3. Train11 weeks
  4. Placeemployer
  5. Follow up6 months
Skills and exposure console: the screen's structure, terms and states for Institutional workforce planning.Placeholder names and illustrative values; a design, not a record or a live system.
04The question

Institutional workforce planning: how the risk develops.

Public and private sector capacity. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Training takes years

Doctors, nurses, engineers and teachers take years to train, so shortages cannot be fixed quickly and planning must look ahead.

Mechanism

Retirement waves create gaps

Ageing workforces in public services face waves of retirement that drain experience faster than recruits can replace it.

Mechanism

Migration moves skills

Health and other professionals migrate to higher-paying countries, relieving shortages there and creating them in origin countries.

Mechanism

Shortages cascade in crises

In emergencies, understaffed services lose capacity first, and burnout among remaining staff can drive further departures.

05Key terms

Terms used on this page.

Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.

TermDefinition
Skills forecastingProjecting future supply of and demand for skills under stated assumptions.
Staff turnoverThe rate at which employees leave an organization and must be replaced.
Succession planningPreparing people to fill key roles when current holders leave.
06Indicators

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
Vacancy rate in critical occupationspercent of postsquarterlyEmployer and sector recordsREPORTED
Workforce age profileshare aged fifty-five and overannualWorkforce registersOFFICIAL
Training places versus projected needratioannualPlanning projectionsFORECAST
Staff turnoverpercent per yearannualHuman resources recordsOBSERVED
Foreign-trained professionalspercent of workforceannualProfessional registersOFFICIAL
Health worker densityper ten thousand populationannualNational Health Workforce AccountsOFFICIAL
07Canvas

From sources to decisions.

The topic as a computational graph: named sources feed the methods, an evidence review gates the outputs, and the decisions stay with the authorities that hold them.

Pipeline canvas · Institutional workforce planning as a run graphDesign, not a record
Institutional workforce planning: from task exposure to reskilling pathwaysOccupations are broken into tasks and scored for exposure; skill gaps are found against vacancies; training pathways are designed with employers; placement and social protection support the transition. Design of the process, not a record of a run.

Fig. 02Nodes carry their type, two metric rows and a state; connectors show what feeds what; dashed frames name the owners; the timeline is the cadence. Design of the pipeline, not a record of a run.

08Sources

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

SourceWhat it givesLicence class
WHO National Health Workforce AccountsHealth workforce stock and flowsOpen, WHO terms of use
WHO Global Code of Practice on the International Recruitment of Health Personnel reportingEthical recruitment and migration dataPublic, WHO terms of use
Cedefop skills forecastsSkills supply and demand projections in EuropePublic, EU terms
Public service workforce statisticsSize, age and turnover of public workforcesPublic records, licence per government
UNESCO data on teachersTeacher numbers and qualificationsOpen, CC BY-SA 3.0 IGO
09Decisions

Who decides, and what the evidence serves.

Future of Work and Skills prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Who decidesThe questionEvidence this page serves
Health, education and public service ministriesHow many professionals to train and recruitProjections; turnover analyses
Institutions and employersHow to retain staff and plan successionTurnover and age evidence
Governments in origin and destination countriesHow to manage professional migration ethicallyMigration evidence

Outputs this topic produces

  • Workforce supply and demand projections with ranges
  • Retirement and turnover risk analyses
  • Migration flow analyses for critical professions
  • Evidence notes for workforce strategies
10Core questions

What workforce planners ask.

  • What skills will the organization or sector need in five and ten years?
  • How many people with those skills exist, and how many will retire or leave?
  • Where are shortages most likely to disrupt critical services?
  • How can capacity be built, through training, recruitment, redesign or technology?
11Mechanisms

Why shortages persist.

Training skilled workers takes years, so supply responds slowly to demand. Ageing workforces in sectors such as health, utilities and public administration create waves of retirement. Public sector pay structures may not compete for scarce skills such as digital, engineering and data roles. Critical national missions, such as an energy transition or a disaster recovery programme, can require skills faster than systems can produce them.

Planning often fails because it extrapolates past trends, works in sector silos and is not linked to education provision or funding decisions.

12Methods and data

Tools for planning capacity.

  1. 01

    Supply and demand modelling

    Projecting workforce stock and needs under scenarios, using economics and development economics. Projections are sensitive to assumptions about technology and policy.

  2. 02

    Competency mapping

    Defining the competencies roles require and assessing the current workforce against them.

  3. 03

    Scenario planning

    Testing workforce plans against different futures, using econometrics and expert judgement. Scenarios are not forecasts.

  4. 04

    Capacity audits

    Reviewing critical roles, single points of failure and succession.

14Questions

Questions and answers.

What is workforce planning?
The process of forecasting the number and skills of staff an organization or sector will need and planning how to meet that need.
Why do health worker shortages persist?
Because training takes years, workers retire and migrate, and conditions drive some to leave, while demand rises with ageing populations.
What is the WHO Global Code on recruitment?
A voluntary code that sets principles for the ethical international recruitment of health personnel, with countries reporting on its implementation.
Why do workforce plans often miss?
They tend to extrapolate past trends, overlook interactions between sectors and are not linked to training and funding decisions. Scenario-based planning helps address this.
Can technology fill skill shortages?
Sometimes partly, by automating tasks or supporting less specialised staff. It can also create new shortages in the skills needed to run the technology.
Does the platform produce workforce plans for organizations?
No. It publishes methods and research. Organizations plan their own workforces; scoped technical assistance is described by Nexus Agency.
How does an ageing workforce affect planning?
It creates retirement waves that can remove experience faster than it can be replaced, so knowledge transfer and succession become planning priorities.
What is a single point of failure in a workforce?
A critical function that depends on one person or a very small group, so that their absence would stop the service.