Western and southern Europe share one grid, Mediterranean heat and a widening protection gap. This page explains the planned France hub of the Nexus Consortium, the fourteen countries it would coordinate, and why no Paris seat is on record.
- As of
- 21 October 2026
- Reading
- 15 minutes
- Evidence
- 19 sources, cited in order
Methods and evidence
- Evidence
- 19 sources, cited in order and listed under References
- Figures
- 6 figures
- Data availability
- Every chart's data is published as a table on this page.
01What the France hub is
What the France hub is
The France hub is a planned regional coordination role of the Nexus Consortium for fourteen countries of western and southern Europe: France, Belgium, the Netherlands, Luxembourg, Monaco, Andorra, Spain, Portugal, Italy, Malta, San Marino, the Holy See, Greece and Cyprus. It sits in the Europe and Eurasia programme region, one of six programme regions, beside three other planned hubs: the United Kingdom, Switzerland and Türkiye. Its recorded focus is metropolitan and overseas contexts, Mediterranean systems, grids and European interoperability 1.
A planned hub is a coordination role, not an office, a public authority or an exclusive territory. It operates only once its host decision is on record, and none is: the region is in formation, no host is named, and the programme's current service level is R0, information and enquiries 1,3. The page you are reading replaces an earlier one that described a "Europe Nexus Consortium" anchored in a "Paris Cluster Hub by 2030". No consortium of that name and no Paris host role are on record. The only named programme in formation in the region is the Eurasia Nexus Consortium, whose public page is published by GRA 1. Paris appears below as a place, the capital of the hub country, not as a seat.
The distinction matters for every reader. A ministry in Lisbon, an operator in Milan or a university in Athens that writes to the regional desk is writing to a programme that can route a question and keep a durable record of it. It is not writing to a body that can commission work, set terms or speak for any government. The regions and hubs page of the documentation sets out the rule in full; the status and service levels page explains how a state moves only when the record behind it changes.
02Why western and southern Europe need shared risk evidence
Why western and southern Europe need shared risk evidence
Europe has no shortage of institutions, law or data. Its difficulty is that the risks now arriving cross the boundaries those institutions were built around. The European Climate Risk Assessment of March 2024 identified 36 major climate risks to energy and food security, ecosystems, infrastructure, water, financial stability and health, and found that many have already reached critical levels 9. Since the 1980s Europe has warmed about twice as fast as the global average, the fastest of any continent, and 2024 was its warmest year on record 10.
Heat shows the scale. An epidemiological study across 654 regions of 32 countries estimated 67,873 heat-related deaths in summer 2022, 50,798 in 2023 and 62,775 in 2024, more than 181,000 over the three summers, two thirds of them in southern Europe 4,5. France alone accounted for an estimated 2,451 deaths in summer 2024 5. These are model estimates, not registered causes of death, but they are the best comparable measure available and they fall heavily on the Mediterranean countries of the France cluster.
Money shows the gap. According to the European Environment Agency, weather and climate extremes cost the EU EUR 822 billion in 2024 prices between 1980 and 2024; more than EUR 208 billion of it, a quarter, fell in the four years 2021 to 2024 6. Less than 20% of those losses were privately insured, and the shares fall from over 35% for storms to around 15% for floods and slightly over 10% for heat, drought and wildfire 6. The uninsured remainder lands on households, firms and public budgets, often in a different country from the one where the hazard began.
Fig. 01One region, four planned hub clusters
Figure 1 in words
A Lambert conformal map of Europe and western Asia. Gold: the France hub cluster, France, Belgium, the Netherlands, Luxembourg, Monaco, Andorra, Spain, Portugal, Italy, Malta, San Marino, the Holy See, Greece and Cyprus. Blue: the United Kingdom hub cluster, the United Kingdom, Ireland, Iceland, Norway, Sweden, Finland, Denmark, Estonia, Latvia and Lithuania. Green: the Switzerland hub cluster, Switzerland, Liechtenstein, Austria, Germany, Czechia, Slovakia, Poland, Hungary, Slovenia and Croatia. Purple: the Türkiye hub cluster, twenty countries from the Balkans and Ukraine to the Caucasus and Central Asia. A panel states the record: the region is in formation, the hubs are planned with no host decision, the service level is R0, and no host role is recorded in Paris.
03Why coupling changes the question
Why coupling changes the question
The countries of the France cluster are joined by systems, not only by geography. France is the largest net exporter of electricity in Europe: its net export balance reached 92.3 TWh in 2025, up from 89.0 TWh in 2024 and the highest since cross-border trading began 8. Italy took 26.2 TWh net across its border with France, Germany and Belgium 23.1 TWh, Great Britain 22.6 TWh and Switzerland 20.1 TWh, while the border with Spain was nearly balanced at 0.2 TWh 8. A heatwave that lowers river flows and constrains thermal plant cooling in one country therefore becomes a supply question in several others.
The 28 April 2025 blackout made the coupling visible. At 12:33 CEST the systems of continental Spain and Portugal collapsed, and a small area of south-west France near the border was briefly disrupted 7. The expert panel convened by ENTSO-E reported on 20 March 2026 that there was no single cause: oscillations, gaps in voltage and reactive power control, differing voltage regulation practices, rapid output reductions and uneven stabilisation capability interacted, producing fast voltage increases and cascading disconnections of generation 7. It was the most severe blackout on the European power system in over 20 years, and the first of its kind 7.
Two lessons carry beyond electricity. First, the panel's recommendations are about monitoring, coordination and data exchange between system actors, which is to say about compatible evidence held by different parties. Second, a cascade of this kind is not visible to any one institution until it has happened. Interdependence analysis, the study of how a failure in one system propagates through physical, digital, geographic and market links, is the discipline a regional programme exists to make routine.
Fig. 05How a grid incident crossed a system boundary
Figure 5 in words
Box one, trigger: 12:33 CEST on 28 April 2025, voltage oscillations and fast voltage increases in Spain. Box two, cascade: cascading disconnections of generation as voltage rose, a first in the continental European system. Box three, extent: continental Spain and Portugal in total blackout, with brief disruption in a small area of south-west France. Box four, learning: the expert panel's final report of 20 March 2026, the most severe blackout in Europe in over 20 years, with many interacting causes. A note lists the causes and the panel's emphasis on monitoring, coordination and data exchange.
04Five shared systems the region examines
Five shared systems the region examines
Regional work in the programme starts from shared systems, not from institutions. The Europe and Eurasia programme names five, each with the question it examines 1. The cross-border risk systems page sets the rule for all of them: shared-system work compares governed outputs and preserves dissent; it creates no treaty, no transfer of sovereignty and no right to move data 11.
Fig. 04One national grid, many neighbours
Figure 4 in words, and its data
Five bars: Italy 26.2 TWh, Germany and Belgium 23.1 TWh, Great Britain 22.6 TWh, Switzerland 20.1 TWh, Spain 0.2 TWh. Side panel: net export balance 92.3 TWh in 2025, the highest since cross-border trading began; 89.0 TWh in 2024; about 15% of French exports supplied countries beyond its borders, Portugal about 3 TWh. Note: including transit, Italy received about 33 TWh.
| Border | Net exports 2025 | Note |
|---|---|---|
| Italy | 26.2 TWh 8 | About 33 TWh including transit |
| Germany and Belgium (Core) | 23.1 TWh 8 | |
| Great Britain | 22.6 TWh 8 | |
| Switzerland | 20.1 TWh 8 | Much of it re-exported, mainly to Italy |
| Spain | 0.2 TWh 8 | Roughly balanced |
| Total net balance | 92.3 TWh 8 | 89.0 TWh in 2024 |
05Three levels of cooperation, one rule of subsidiarity
Three levels of cooperation, one rule of subsidiarity
The programme organizes cooperation at three levels, and each level decides only what cannot be decided below it. At the national level, a National Nexus programme belongs to its country: a National Desk routes questions and keeps records, a National Model represents the country's systems with their evidence and uncertainty, and a National Portfolio links priorities, capabilities and handoffs 16. Institutions take part through the National Nexus Consortium (NNC), selected individuals through the National Leadership Council (NLC), and experts and volunteers through the National Working Groups (NWG) 16. No country in the France cluster has a constituted national programme on record 3.
At the regional level, Regional Nexus Consortiums compare compatible evidence on shared systems and support the regional profiles of Reports, published in the second and fourth quarters, which never override a country's own findings. The France hub is a coordination role at this level. Regional leadership roles at GRF are in formation and their scope is published only once adopted, as the council architecture states. At the global level, the Consortium Secretariat, held by GCRI Canada in Toronto, keeps the programme's records, calendars and source registers, and routes every enquiry to a regional or country desk.
The test of the design is what it refuses. A Regional Nexus Consortium holds no authority over a national programme. A hub does not represent the countries it coordinates. And an enquiry from Brussels or Rome receives a reference in the programme's participation records, not an appointment, a membership or a mandate.
Fig. 06Three levels of cooperation, one rule
Figure 6 in words
Global band: the Consortium Secretariat, held by GCRI Canada in Toronto, keeps records and routes enquiries; GCRI leads science, evidence and methods; GRF leads leadership, dialogue and Nexus Universe; GRA leads finance, insurance and development readiness. Regional band: the France hub, a planned coordination role for 14 countries with no host; the United Kingdom, Switzerland and Türkiye hubs, also planned; the Regional Nexus Consortium, which supports regional profiles of the Reports platform in the second and fourth quarters. National band: each country owns its programme with a National Desk, Model and Portfolio; the NNC brings institutions through six constituency councils, with the National Standards Council as its standards function; the NLC brings selected leaders in personal capacity; the NWG brings experts organized in Competence Cells at institution, community or agency level, any of which can be a CERT. An arrow labelled subsidiarity runs upward; a panel places the decision with the competent authority, operator or financial institution, outside the programme.
06How the region's risks are measured
How the region's risks are measured
Most of the evidence the France cluster needs already exists, held by bodies with their own mandates. Climate losses are compiled by the European Environment Agency 6; heat mortality is estimated by research teams publishing in peer-reviewed journals 4; the climate record comes from the Copernicus Climate Change Service with the World Meteorological Organization 10; grid incidents are investigated by the transmission operators through ENTSO-E 7; and electricity flows are published by national operators such as RTE 8. National trajectories, such as the French reference warming trajectory of +2 °C by 2030, +2.7 °C by 2050 and +4 °C by 2100 for mainland France, are set by the competent national services 12.
The programme does not replace any of these. It organizes them so that two countries can compare like with like, through twenty systems named by their Nexus Standards codes. For Europe and Eurasia the model lists NXS-GRX (canonical data, provenance and risk), NXS-DSS (decision cases and deliberation), NXS-NET (network topology and continuity), NXS-COR (compute, nodes and runtimes), NXS-NSF (trust, authorization and assurance) and NXS-RLS (participants, agreements and handoffs) among the systems in regional demand 1. Every finding carries one of nine evidence labels, from observed and published statistics to modelled, scenario and unknown, and missing data is shown as missing, never as zero 3.
Fig. 02Heat kills tens of thousands each summer
Figure 2 in words, and its data
Three bars for the summers of 2022, 2023 and 2024: 67,873, 50,798 and 62,775 estimated heat-related deaths in 32 European countries. A side panel: more than 181,000 deaths over the three summers combined; an estimated 2,451 in France in summer 2024; Europe has warmed about twice as fast as the global average since the 1980s.
Fig. 03Losses are high and mostly uninsured
Figure 3 in words, and its data
Left panel, EU-27 losses in EUR billion at 2024 prices: 2021, 65.2; 2022, 57.7; 2023, 45.1; 2024, 40.4. Note: EUR 822 billion over 1980 to 2024, more than EUR 208 billion of it in 2021 to 2024. Right panel, share of losses privately insured over 1980 to 2024: meteorological events over 35%, hydrological around 15%, climatological slightly over 10%; all events less than 20%.
| Measure | Value | Note |
|---|---|---|
| Losses 2021 | EUR 65.2 billion 6 | Costliest year in the series |
| Losses 2022 | EUR 57.7 billion 6 | |
| Losses 2023 | EUR 45.1 billion 6 | |
| Losses 2024 | EUR 40.4 billion 6 | Average 2020 to 2024: EUR 44.9 billion a year 6 |
| Insured share, meteorological | Over 35% 6 | Storms |
| Insured share, hydrological | Around 15% 6 | Floods |
| Insured share, climatological | Slightly over 10% 6 | Heat, drought, wildfire; all events less than 20% 6 |
07The instruments that already govern shared risk
The instruments that already govern shared risk
Cooperation in the cluster starts from instruments its countries already own. The European Union has, in four years, built a legal floor for systemic resilience: the Critical Entities Resilience Directive, the NIS2 Directive for network and information security, the Digital Operational Resilience Act for finance, and the EU Civil Protection Mechanism for response. The Preparedness Union Strategy of March 2025 joins them up with 30 key actions 17. Globally, the Sendai Framework for Disaster Risk Reduction remains the shared frame to 2030 18. The programme aligns its evidence to these instruments; it never substitutes for them, and it supervises no one.
| Year | Instrument | Status and relevance |
|---|---|---|
| 2001 | EU Civil Protection Mechanism | 37 participating states; activated more than 880 times, 64 times in 2025 19 |
| 2015 | Sendai Framework for Disaster Risk Reduction 2015–2030 | In force to 2030; the global frame for every country in the cluster 18 |
| 2022 | Directive (EU) 2022/2557 on the resilience of critical entities (CER) | Eleven sectors; national risk assessments due 17 January 2026; critical entities identified by 17 July 2026 13 |
| 2022 | NIS2 Directive | 18 critical sectors; transposition was due by 17 October 2024 14 |
| 2022 | Regulation (EU) 2022/2554, Digital Operational Resilience Act (DORA) | Applies since 17 January 2025 to 20 types of financial entity and ICT providers 15 |
| 2025 | EU Preparedness Union Strategy | 30 key actions and a detailed action plan 17 |
| 2025 | France: reference warming trajectory for adaptation (TRACC) | +2 °C by 2030, +2.7 °C by 2050, +4 °C by 2100 for mainland France 12 |
08Standards the programme brings
Standards the programme brings
The programme's own standards are proposed, not adopted, and each country decides whether and how to use them through its National Standards Council, the standards function of its NNC. The Nexus Standards for critical infrastructure and critical entities map to the same sectors the CER Directive names, and the standards for compound and cascading hazards give the cluster a common vocabulary for chains like the Iberian blackout. The governance of Nexus Standards is a working model in which no stakeholder group may hold more than one third of any decision and funding never buys a seat or a vote. Risk Academy in Europe and Eurasia teaches the same material in the open.
09What institutions in the cluster can do now
What institutions in the cluster can do now
At service level R0, participation begins with a question. The routes below are open today; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist 3.
- Governments, regions and cities: send a material question on a shared system through the enquiry form; the reply gives a reference and the next step. A city relationship never becomes national representation.
- Transmission, water, port and rail operators: propose a dependency to examine, such as an interconnector, a river reach used for cooling or a port hinterland; operators keep full control of their systems, and restricted topology never appears in a public view.
- Universities and research institutes: bring a method, a dataset or a case through contributing to the quarterly reports, credited to you and published with its limits.
- Supervisors, insurers and banks: read the cluster's finance questions with GRA, on protection gaps and on handoffs to the institutions that decide; readiness evidence is never a financing or underwriting decision.
- Civil protection and health authorities: propose an exercise question for the annual programme of Nexus Universe (universe.nexus), in which every participant acts within its own mandate and no simulation message is ever delivered as a warning.
10What is changing
What is changing
- Heat as a public-health emergency. Three summers of comparable estimates show tens of thousands of deaths a year, concentrated in the Mediterranean countries of the cluster 4,5.
- Grids under new physics. The Iberian blackout was the first of its kind on the continental system, and its causes lie in voltage control and coordination rather than in any single plant 7.
- A widening protection gap. With less than 20% of climate losses insured, the question of who carries the remainder is now a fiscal one 6.
- Risk assessment becomes law. Member States' national risk assessments under the CER Directive were due in January 2026, and critical entities are identified by July 2026 13.
- Preparedness as policy. The Preparedness Union Strategy turns preparedness into a cross-sector programme with 30 actions, which raises demand for evidence that crosses sectors as hazards do 17.
11Three faces of cooperation in the cluster
Three faces of cooperation in the cluster
The same regional question looks different to a scientist, a convenor and a financier, and all three are needed for a decision to hold. GCRI leads on science, methods and evidence, and on the regional record kept on its Europe and Eurasia page. GRF leads leadership, institutional dialogue and the governance of Nexus Universe, with its regional view on Europe and Eurasia at GRF. GRA reads the evidence for finance, insurance and development readiness on Europe and Eurasia at GRA, where the regional financial questions include climate exposure in interconnected energy and real estate, technology concentration in market infrastructure, and protection gaps for heat, flood and wildfire 1. Every stage follows the Nexus cycle from question to renewal, and the decide step sits outside the programme.
What this page does not claim: the France hub is a planned coordination role with no host decision on record; it is not an office, a public authority or a representative of any government, city or institution, and no Paris seat exists. The region is in formation and the current service level is R0. Naming an agency, an instrument or an organization is not a claim of partnership or endorsement. GCRI does not regulate or certify, GRF does not regulate, finance or procure, and GRA does not lend, underwrite, rate or invest. Any finance vehicle is formed, if at all, by competent lawful actors outside the programme, as the lawful handoffs page explains.
Questions
Questions and answers
Is there a GCRI or Nexus office in Paris?
No. No office, host or seat is recorded in Paris or anywhere else in the region. The France hub is a planned coordination role, and the only recorded seat of the programme is the Consortium Secretariat with GCRI Canada in Toronto.
Which countries would the France hub coordinate?
Fourteen: France, Belgium, the Netherlands, Luxembourg, Monaco, Andorra, Spain, Portugal, Italy, Malta, San Marino, the Holy See, Greece and Cyprus. The United Kingdom, Switzerland and Türkiye hubs cover the other forty countries of the region.
What happened to the Europe Nexus Consortium?
No programme of that name is on record. The earlier page used it for a proposal. The named programme in formation in the region is the Eurasia Nexus Consortium, with a public page published by GRA, and it is not yet constituted.
Does the programme replace EU or national crisis arrangements?
No. The EU Civil Protection Mechanism, the CER and NIS2 Directives, DORA and national plans remain the instruments that govern. The programme organizes compatible evidence for the bodies that hold those mandates, and every decision stays with them.
Can a company or a bank buy a role in the regional programme?
No. Ordinary participation has no fee, funding never buys a seat or a vote, and cooperation with public bodies never depends on a membership tier. Financial institutions take part through a cross-cutting pathway that informs every constituency without governing any.
Terms
Glossary
- Planned hub
- A regional coordination role for a group of countries; it operates only once a host decision is on record, and is never an office or an exclusive territory.
- Shared system
- Infrastructure or an ecosystem that crosses borders, such as a grid, a river basin or a corridor, examined with compatible methods by the countries that share it.
- Service level R0
- The current state of the programme: information and enquiries, with a durable reference for each enquiry.
- Protection gap
- The share of economic loss from a hazard that is not insured or otherwise pre-financed.
- Subsidiarity
- The rule that a question is handled at the lowest level able to handle it; a regional body takes it up only when it crosses borders.
- Cascading failure
- A failure that propagates from one component or system to others through their dependencies, as in the 28 April 2025 blackout.
Reuse and cite
Text CC BY 4.0. Cite the page with its date; data tables are linked under each figure.
Sources
References
19 sources, numbered in the order they are first cited
- The Global Centre for Risk and Innovation (2026-10). Europe and Eurasia region. therisk.global. Accessed 2026-10-21.
- The Global Centre for Risk and Innovation (2026-10). Six programme regions. therisk.global. Accessed 2026-10-21.
- The Global Centre for Risk and Innovation (2026-10). Programme status. therisk.global. Accessed 2026-10-21.
- Janoš et al., Nature Medicine (2025-09). Heat-related mortality in Europe during 2024 and health emergency forecasting to reduce preventable deaths. www.nature.com. Accessed 2026-10-21.
- Barcelona Institute for Global Health (ISGlobal) (2025-09). Over 62,700 deaths associated with record-breaking heat during the summer of 2024 in Europe. www.isglobal.org. Accessed 2026-10-21.
- European Environment Agency (2025-10-14). Economic losses from weather- and climate-related extremes in Europe. www.eea.europa.eu. Accessed 2026-10-21.
- European Network of Transmission System Operators for Electricity (ENTSO-E) (2026-03-20). 28 April 2025 blackout: factual report and expert panel final report. www.entsoe.eu. Accessed 2026-10-21.
- RTE (Réseau de transport d'électricité) (2026). Annual electricity review 2025: cross-border trade. analysesetdonnees.rte-france.com. Accessed 2026-10-21.
- European Environment Agency (2024-03-11). European Climate Risk Assessment (EEA Report 01/2024). www.eea.europa.eu. Accessed 2026-10-21.
- Copernicus Climate Change Service and World Meteorological Organization (2025-04-15). European State of the Climate 2024. climate.copernicus.eu. Accessed 2026-10-21.
- The Global Centre for Risk and Innovation (2026-10). Cross-border risk systems. therisk.global. Accessed 2026-10-21.
- Météo-France (2025). Le climat futur en France: à quoi s'adapter? (TRACC). meteofrance.com. Accessed 2026-10-21.
- European Commission, Migration and Home Affairs (2026). Critical infrastructure resilience (Directive (EU) 2022/2557). home-affairs.ec.europa.eu. Accessed 2026-10-21.
- European Commission, Shaping Europe's digital future (2026). NIS2 Directive: securing network and information systems. digital-strategy.ec.europa.eu. Accessed 2026-10-21.
- European Insurance and Occupational Pensions Authority (2025). Digital Operational Resilience Act (DORA). www.eiopa.europa.eu. Accessed 2026-10-21.
- The Global Centre for Risk and Innovation (2026-10). National Nexus. therisk.global. Accessed 2026-10-21.
- European Climate Adaptation Platform (Climate-ADAPT), European Environment Agency and European Commission (2025-03-27). EU Preparedness Union Strategy launched. climate-adapt.eea.europa.eu. Accessed 2026-10-21.
- United Nations General Assembly (2015-06-03). Sendai Framework for Disaster Risk Reduction 2015–2030 (A/RES/69/283). docs.un.org. Accessed 2026-10-21.
- European Commission, Civil Protection and Humanitarian Aid Operations (2026). EU Civil Protection Mechanism. civil-protection-humanitarian-aid.ec.europa.eu. Accessed 2026-10-21.
Record
Editorial record
Facts and programme states are given as of 21 October 2026. This page is reviewed at least every 180 days and whenever a hub host decision, a programme state or a cited figure changes. It replaces an earlier version of the same page, whose description of a Europe Nexus Consortium, a Paris Cluster Hub anchored by 2030, readiness records and a statement of supporters did not match the programme's current records; those structures are not on record and have been removed.
Published by the GCRI editorial desk under the editorial integrity policy. To report an error or request a correction, use the corrections route; corrections are dated and listed with the page.
Cite this article
GCRI editorial desk (2026, June 26). France hub: Europe's shared risks and the Paris cluster. The Global Centre for Risk and Innovation. https://therisk.global/europe-nexus-consortium-paris-cluster-hub/
@online{gcri2026europenexusconsortium,
author = {{GCRI editorial desk}},
title = {{France hub: Europe's shared risks and the Paris cluster}},
publisher = {The Global Centre for Risk and Innovation},
year = {2026},
month = {6},
url = {https://therisk.global/europe-nexus-consortium-paris-cluster-hub/},
language = {en}
} TY - ELEC AU - GCRI editorial desk TI - France hub: Europe's shared risks and the Paris cluster PB - The Global Centre for Risk and Innovation PY - 2026 DA - 2026/06/26 UR - https://therisk.global/europe-nexus-consortium-paris-cluster-hub/ LA - en ER -
Republish
Republish or translate this article free of charge, in print or online, under CC BY 4.0: keep the byline and The Global Centre for Risk and Innovation, link to the original and note any change. Figures, maps and twins made by the institutions carry the same licence; third-party data keeps its own credit line.
Attribution to paste
<p>The France hub and Europe's shared risks: what a Paris cluster can and cannot be — GCRI editorial desk, The Global Centre for Risk and Innovation. First published 26 June 2026 at <a href="https://therisk.global/europe-nexus-consortium-paris-cluster-hub/">https://therisk.global/europe-nexus-consortium-paris-cluster-hub/</a>. Republished under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/).</p>Topics
- GCRI
- Nexus
- AI Governance
- AI governance Europe
- Civil Protection
- civil protection readiness
- Climate Adaptation
- Critical Infrastructure
- critical infrastructure resilience
- Cyber Resilience
- cyber resilience Europe
- Disaster Risk Finance
- disaster risk finance readiness
- EU Risk
- EU risk readiness
- Europe Nexus
- Europe Nexus Consortium
- Europe resilience infrastructure
- European climate risk
- GCRI
- Heat
- insurance-readiness
- insurance-readiness Europe
- Nexus Ecosystem Stack
- Paris Cluster Hub
- Paris Nexus
- Public-Good Infrastructure
- sustainable finance
- sustainable finance readiness
- Wider Europe