GCRI · How Nexus works

Renew

Renewal closes the loop: corrections are applied, monitoring data are compared with what the analysis expected, and the year’s lessons set the next research agenda.

02Six pillars

This step runs in Universe.

Where a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed. Go to Universe.

Select pillars · hover lines16 / 18 handoffs

Route

Around Universe

The pillars Universe hands work to and receives it from.

L · F · U · S · R · A

Pillars
5 of 6
Handoffs
16 of 18
Loops
16 closed

Handoffs in play

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

and 12 more

F01 to F14 are the recorded handoffs of the programme year, each with the artefact that moves and its phase; R1, R2, R3 and R4 carry work around the ring. A loop counts when every pillar on it is selected. Every pillar is led by the Nexus Consortium.
  1. LabsWhere questions become experiments and prototypes: new methods, data and tools are tried in the open, with their limits on record, before the Foundry builds them, under the Nexus Consortium.Labs at GCRI: Labs
  2. FoundryWhere methods, data and models become reproducible builds, each run with its inputs, version and limits on record.Foundry at GCRI: Foundry
  3. UniverseWhere a build is tested under controlled conditions with independent evaluators, so a method’s skill is measured, not assumed.Universe at GCRI: Universe technical officeuniverse.nexus
  4. Nexus StandardsWhere methods, identifiers and data schemas are codified in the open and corrected when a test finds a fault.Nexus Standards
  5. ReportsWhere findings are published with their method, uncertainty and evidence class, and corrected as new versions.Reports at GCRI: PublishReports
  6. Risk AcademyWhere methods and systems are taught on real data and real places, by working the case, on Risk Academy.Risk Academy
03Monitoring and review

Comparing what happened with what was expected.

ISO 31000 treats monitoring and review as part of every stage, not a final audit. For systemic risk, that means tracking the indicators a finding depended on: reservoir storage, grid reserve margins, case counts, price spreads. Then ask whether the observed path stays inside the range the analysis gave. A path outside the range is a finding in its own right.

  • After-action reviews from tests and real events, with the technical part written by the Global Centre for Risk and Innovation (GCRI).
  • Correction logs from Reports, traced back to the decisions that relied on the corrected version.
  • Method updates on the STEM Commons when validation shows a method’s limits were understated.
04Process

How the process runs.

Process

Renew: Programme through eight gates

The Global Risks Forum (GRF) records eight yearly gates, each a programme decision; a gate not passed stops its work, and the competent authority decides outside.

  1. 01 Q1 · Planning

    1. 01G0 · Annual programme authorisedGate · The Global Risks ForumGRF authorises the annual mandate. It never sets a national agenda.
    2. 03Route the candidate mission to standardsStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Q2 · Readiness and build

    1. 04G1 · Missions admittedGate · The Global Risks ForumGRF admits missions with reasons recorded. It cannot admit a mission without an accountable owner.
    2. 05G2 · Data and resources qualifiedGate · The Global Risks ForumReadiness preparation closes when data, people and resources are qualified.
    3. 06G3 · Build accepted for exerciseGate · The Global Risks ForumGRF records whether the build is accepted for exercise. A gate not passed stops the work it governs.
  3. 03 Q3 · Action Week

    1. 07G4 · Controlled live operation authorisedGate · The Global Risks ForumGRF authorises controlled live operation for Action Week.
    2. 08G5 · Evidence sealed and stand-down recordedGate · The Global Risks ForumThe evidence is sealed with its provenance and the stand-down is recorded.
  4. 04 Q4 · Reporting and renewal

    1. 02Competent authority decides and actsActor · The competent authorityThe competent authority decides and acts under its own rules. The programme informs it and never decides for it.
    2. 09Scientific and editorial reviewStep · Reviewers and the publisherQualified, conflict-managed reviewers and the publisher decide what is accepted. Institutions cannot decide a scientific conclusion.
    3. 10G6 · Publication authorisedGate · The Global Risks ForumGRF authorises publication of results that have passed scientific and editorial review. It cannot publish personal data.
    4. 11G7 · Renewal reviewedGate · The Global Risks ForumGRF reviews renewal and sets the next cycle’s mandate.

The programme year · The Global Risks Forum · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

05The next agenda

Lessons become questions.

What the year exposed, including what the evidence could not answer, becomes candidate questions for the annual cycle. Sendai’s monitoring and the IPCC assessment cycle are the reference rhythms that national bodies work to; the agenda is set so its outputs can feed them.

08Sources

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

The Global Centre for Risk and Innovation

Bring a method, a dataset or a question.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.